KYTC contract 25-2113 bid tabulation
ASPHALT RESURFACING CASTLE HIGHWAY (US 421). Let by Kentucky Transportation Cabinet on July 24, 2025. 5 bids received; low bid $1,197,576 by Libs Paving Company Inc, -16% against the engineer's estimate of $1,418,631.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 36
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Libs Paving Company Inc | $1,197,576 | Low | -16% |
| 2 | Mago Construction Company LLC | $1,203,334 | 0.0% | -15% |
| 3 | Louisville Paving Company Inc | $1,208,885 | +1.0% | -15% |
| 4 | E & B Paving LLC | $1,212,500 | +1.0% | -15% |
| 5 | Mac Construction & Excavating Inc | $1,327,053 | +11% | -6.0% |
Engineer's estimate: $1,418,631.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Libs Paving Company Inc | 2. Mago Construction Company LLC | 3. Louisville Paving Company Inc | 4. E & B Paving LLC | 5. Mac Construction & Excavating Inc |
|---|---|---|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 1,149 | $78.00 | $81.00 | $80.00 | $78.65 | $83.50 |
| 0020 | CL2 asph surf 0.38D PG64-22 | TON A A | 8,915 | $78.00 | $81.00 | $80.00 | $81.00 | $83.50 |
| 0040 | Temporary signs | SQFT A A | 910 | $4.00 | $0.01 | $4.00 | $7.00 | $7.00 |
| 0050 | Maintain & control traffic | LS A A | 1 | $20,000 | $6,000.00 | $10,250 | $1,500.00 | $35,000 |
| 0060 | Maintain & control traffic | LS A A | 1 | $5,000.00 | $6,000.00 | $6,575.00 | $1,500.00 | $26,400 |
| 0070 | Maintain & control traffic | LS A A | 1 | $5,000.00 | $6,000.00 | $6,575.00 | $1,500.00 | $26,000 |
| 0080 | Mobilization for mill & text | LS A A | 1 | $500.00 | $2,600.00 | $1,600.00 | $1,500.00 | $1,500.00 |
| 0090 | Mobilization for mill & text | LS A A | 1 | $500.00 | $2,600.00 | $1,600.00 | $1,500.00 | $1,500.00 |
| 0100 | Mobilization for mill & text | LS A A | 1 | $500.00 | $2,600.00 | $1,600.00 | $1,500.00 | $1,500.00 |
| 0110 | Asphalt pave milling & texturing | TON A A | 710 | $70.00 | $35.00 | $35.50 | $59.25 | $50.25 |
| 0120 | Edgeline rumble strips | LF A A | 103,790 | $0.17 | $0.17 | $0.17 | $0.20 | $0.20 |
| 0130 | Base failure repair | SQYD A A | 930 | $65.00 | $62.00 | $62.00 | $60.81 | $75.50 |
| 0131 | Conduit-1 in | LF A A | 40 | $4.79 | $8.00 | $31.28 | $4.79 | $4.79 |
| 0132 | Electrical junction box type B | EACH A A | 4 | $2,500.00 | $1,750.00 | $1,276.21 | $2,500.00 | $2,500.00 |
| 0133 | Loop wire | LF A A | 544 | $0.30 | $1.00 | $1.20 | $0.30 | $0.30 |
| 0134 | Preformed loop/lead-in | LF A A | 100 | $50.00 | $20.00 | $216.49 | $50.00 | $50.00 |
| 0135 | Loop saw slot and fill | LF A A | 644 | $12.65 | $12.00 | $29.25 | $12.65 | $12.65 |
| 0140 | Pave striping-temp paint-4 in | LF A A | 95,065 | $0.01 | $0.18 | $0.01 | $0.18 | $0.19 |
| 0150 | Pave striping-perm paint-4 in | LF A A | 400 | $0.75 | $0.75 | $0.75 | $0.75 | $0.21 |
| 0160 | Pave striping-perm paint-6 in | LF A A | 150,000 | $0.26 | $0.26 | $0.26 | $0.26 | $0.23 |
| 0170 | Pave striping-thermo-6 in W | LF A A | 38,620 | $1.15 | $1.15 | $1.15 | $1.15 | $1.10 |
| 0180 | Pave striping-thermo-6 in Y | LF A A | 38,400 | $1.15 | $1.15 | $1.15 | $1.15 | $1.10 |
| 0190 | Pave striping-thermo-12 in W | LF A A | 680 | $2.50 | $2.50 | $2.50 | $2.50 | $3.00 |
| 0200 | Pave marking-thermo X-walk-6 in | LF A A | 310 | $3.25 | $3.25 | $3.25 | $3.25 | $3.95 |
| 0210 | Pave marking-thermo stop bar-24IN | LF A A | 148 | $10.00 | $10.00 | $10.00 | $10.00 | $12.50 |
| 0220 | Pave marking-thermo cross-hatch | SQFT A A | 1,000 | $5.00 | $5.00 | $5.00 | $5.00 | $4.95 |
| 0230 | Pave marking-thermo curv arrow | EACH A A | 7 | $95.00 | $95.00 | $95.00 | $95.00 | $135.00 |
| 0240 | Fuel adjustment | DOLL A A | 11,994 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0250 | Asphalt adjustment | DOLL A A | 44,357 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0260 | Centerline rumble strips | LF A A | 4,171 | $0.25 | $0.25 | $0.25 | $0.49 | $0.85 |
| 0270 | Pave marking-thermo yield bar-36 in | LF A A | 30 | $25.00 | $25.00 | $25.00 | $25.00 | $30.00 |
| 0280 | Pave mark-thermo-X-walk-24 in | LF A A | 170 | $10.00 | $10.00 | $10.00 | $10.00 | $12.50 |
| 0290 | Pave marking-thermo dotted lane exten | LF A A | 250 | $6.25 | $6.25 | $6.25 | $6.25 | $3.95 |
| 0300 | Asphalt material for tack non-tracking | TON A A | 66 | $1.00 | $0.01 | $0.01 | $0.10 | $0.01 |
| 0310 | Install radar presence detector type A | EACH A A | 4 | $1,500.00 | $2,850.00 | $1,414.63 | $1,500.00 | $1,500.00 |
| 0330 | Demobilization | LS A A | 1 | $20,000 | $16,950 | $18,179 | $18,515 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way