KYTC contract 25-2292 bid tabulation
ASPHALT RESURFACING WEST MAIN STREET (US 31W SOUTHBOUND ONLY). Let by Kentucky Transportation Cabinet on July 24, 2025. 6 bids received; low bid $1,016,985 by Mac Construction & Excavating Inc, -39% against the engineer's estimate of $1,679,529.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 39
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mac Construction & Excavating Inc | $1,016,985 | Low | -39% |
| 2 | Louisville Paving Company Inc | $1,069,900 | +5.0% | -36% |
| 3 | E & B Paving LLC | $1,103,750 | +9.0% | -34% |
| 4 | Hall Contracting of Kentucky Inc | $1,198,000 | +18% | -29% |
| 5 | Flynn Brothers Contracting Inc | $1,252,478 | +23% | -25% |
| 6 | Libs Paving Company Inc | $1,341,686 | +32% | -20% |
Engineer's estimate: $1,679,529.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mac Construction & Excavating Inc | 2. Louisville Paving Company Inc | 3. E & B Paving LLC | 4. Hall Contracting of Kentucky Inc | 5. Flynn Brothers Contracting Inc | 6. Libs Paving Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 470 | $75.00 | $86.00 | $65.00 | $86.00 | $80.00 | $99.00 |
| 0020 | CL3 asph surf 0.38B PG64-22 | TON A A | 4,697 | $79.00 | $86.00 | $92.00 | $101.00 | $84.50 | $99.00 |
| 0030 | Mobilization for mill & text | LS A A | 1 | $2,500.00 | $3,500.00 | $2,500.00 | $5,700.00 | $6,720.00 | $10,000 |
| 0040 | Asphalt pave milling & texturing | TON A A | 4,697 | $30.50 | $19.00 | $28.00 | $34.50 | $30.00 | $30.00 |
| 0050 | Asphalt material for tack non-tracking | TON A A | 26 | $0.01 | $0.01 | $1.00 | $0.01 | $1.00 | $1.00 |
| 0055 | Adjust manhole | EACH A A | 218 | $0.01 | $200.00 | $200.00 | $150.00 | $250.00 | $275.00 |
| 0060 | Maintain & control traffic | LS A A | 1 | $78,560 | $85,000 | $74,619 | $88,124 | $160,745 | $115,000 |
| 0070 | Portable changeable message sign | EACH A A | 2 | $1,000.00 | $600.00 | $530.00 | $900.00 | $560.00 | $1,500.00 |
| 0080 | Sidewalk-4 in concrete | SQYD A A | 10 | $510.00 | $220.00 | $750.00 | $300.00 | $337.05 | $320.00 |
| 0090 | Arrow panel | EACH A A | 2 | $600.00 | $450.00 | $300.00 | $695.00 | $448.00 | $900.00 |
| 0095 | Adjust water valve | EACH A A | 179 | $0.01 | $100.00 | $25.00 | $65.00 | $95.00 | $125.00 |
| 0100 | Pave striping-temp paint-6 in | LF A A | 2,474 | $0.32 | $0.32 | $0.32 | $0.32 | $0.25 | $0.25 |
| 0110 | Pave striping-thermo-6 in W | LF A A | 54,953 | $1.44 | $1.44 | $1.44 | $1.44 | $1.60 | $1.60 |
| 0120 | Pave striping-thermo-6 in Y | LF A A | 12,678 | $1.44 | $1.44 | $1.44 | $1.44 | $1.30 | $1.30 |
| 0130 | Pave striping-thermo-12 in W | LF A A | 774 | $6.95 | $6.95 | $6.95 | $6.95 | $3.00 | $3.00 |
| 0140 | Pave marking-thermo X-walk-6 in | LF A A | 5,818 | $3.65 | $3.65 | $3.65 | $3.65 | $4.00 | $4.00 |
| 0150 | Pave marking-thermo stop bar-24IN | LF A A | 1,521 | $12.30 | $12.30 | $12.30 | $12.30 | $12.95 | $12.95 |
| 0160 | Pave marking-thermo cross-hatch | SQFT A A | 5,393 | $5.10 | $5.10 | $5.10 | $5.10 | $4.95 | $4.95 |
| 0170 | Pave marking-thermo STR arrow | EACH A A | 30 | $109.00 | $109.00 | $109.00 | $109.00 | $145.00 | $145.00 |
| 0180 | Pave marking-thermo curv arrow | EACH A A | 116 | $109.00 | $109.00 | $109.00 | $109.00 | $155.00 | $155.00 |
| 0190 | Pave marking-thermo comb arrow | EACH A A | 11 | $140.00 | $140.00 | $140.00 | $140.00 | $185.00 | $185.00 |
| 0200 | Pave marking-thermo only | EACH A A | 10 | $140.00 | $140.00 | $140.00 | $140.00 | $305.00 | $305.00 |
| 0205 | Remove pavement marker type V | EACH A A | 62 | $19.93 | $40.00 | $1.00 | $14.95 | $16.75 | $15.00 |
| 0210 | Inlaid pavement marker-MW | EACH A A | 130 | $42.00 | $42.00 | $30.00 | $32.50 | $31.00 | $31.00 |
| 0220 | Inlaid pavement marker-by | EACH A A | 183 | $42.00 | $42.00 | $30.00 | $32.50 | $31.00 | $31.00 |
| 0230 | Fuel adjustment | DOLL A A | 8,083 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0240 | Asphalt adjustment | DOLL A A | 20,303 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0250 | Pave marking thermo-bike | EACH A A | 93 | $145.00 | $145.00 | $145.00 | $145.00 | $285.00 | $285.00 |
| 0255 | Law enforcement officer | HOUR A A | 45 | $85.00 | $120.00 | $90.00 | $100.00 | $84.00 | $60.00 |
| 0260 | Pave mark thermo cone cap-solid yellow | SQFT A A | 234 | $6.75 | $6.75 | $6.75 | $6.75 | $10.00 | $10.00 |
| 0270 | Pavement marking-thermo letters | EACH A A | 46 | $62.00 | $62.00 | $62.00 | $62.00 | $115.00 | $115.00 |
| 0280 | Detectable warnings | SQFT A A | 25 | $55.00 | $32.00 | $40.00 | $50.00 | $44.80 | $42.00 |
| 0290 | Pave mark-thermo-X-walk-24 in | LF A A | 3,705 | $12.30 | $12.30 | $12.30 | $12.30 | $12.95 | $12.95 |
| 0300 | Pave mark-thermo "bus" 8 FT | EACH A A | 4 | $186.00 | $186.00 | $186.00 | $186.00 | $405.00 | $405.00 |
| 0310 | Bike path | SQYD A A | 546 | $90.00 | $90.00 | $90.00 | $90.00 | $122.00 | $122.00 |
| 0320 | Pave marking thermo-bike lane arrow | EACH A A | 95 | $82.00 | $82.00 | $82.00 | $82.00 | $125.00 | $125.00 |
| 0330 | Pave marking-thermo shared lane marking | EACH A A | 3 | $186.00 | $186.00 | $186.00 | $186.00 | $325.00 | $325.00 |
| 0340 | Temporary signs | SQFT A A | 500 | $7.00 | $4.00 | $7.42 | $4.00 | $4.00 | $7.00 |
| 0350 | Demobilization | LS A A | 1 | $15,000 | $18,201 | $17,000 | $17,970 | $19,039 | $60,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.