KYTC contract 25-2216 bid tabulation
ASPHALT RESURFACING CEDAR GROVE ROAD (KY 480). Let by Kentucky Transportation Cabinet on May 22, 2025. 6 bids received; low bid $65,978 by Mago Construction Company LLC, -41% against the engineer's estimate of $111,176.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 MAY 2025
- Pay items
- 14
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mago Construction Company LLC | $65,978 | Low | -41% |
| 2 | Hall Contracting of Kentucky Inc | $84,200 | +28% | -24% |
| 3 | Louisville Paving Company Inc | $87,040 | +32% | -22% |
| 4 | Flynn Brothers Contracting Inc | $93,194 | +41% | -16% |
| 5 | E & B Paving LLC | $96,823 | +47% | -13% |
| 6 | Mac Construction & Excavating Inc | $98,850 | +50% | -11% |
Engineer's estimate: $111,176.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mago Construction Company LLC | 2. Hall Contracting of Kentucky Inc | 3. Louisville Paving Company Inc | 4. Flynn Brothers Contracting Inc | 5. E & B Paving LLC | 6. Mac Construction & Excavating Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 35 | $81.00 | $82.00 | $89.00 | $75.00 | $96.00 | $95.00 |
| 0020 | CL3 asph surf 0.38B PG64-22 | TON A A | 480 | $81.00 | $82.00 | $89.00 | $80.00 | $96.00 | $95.00 |
| 0030 | Temporary signs | SQFT A A | 190 | $4.00 | $4.00 | $4.00 | $4.00 | $7.42 | $7.00 |
| 0040 | Maintain & control traffic | LS A A | 1 | $2,500.00 | $7,100.00 | $6,498.17 | $9,100.00 | $15,935 | $5,676.96 |
| 0050 | Mobilization for mill & text | LS A A | 1 | $4,500.00 | $5,101.45 | $1,500.00 | $1,000.00 | $7,000.00 | $1,500.00 |
| 0060 | Asphalt pave milling & texturing | TON A A | 55 | $14.00 | $40.00 | $165.00 | $135.00 | $5.00 | $130.00 |
| 0070 | Edgeline rumble strips | LF A A | 4,456 | $0.95 | $1.45 | $1.55 | $1.45 | $0.85 | $1.50 |
| 0080 | Base failure repair | SQYD A A | 110 | $67.50 | $150.00 | $90.00 | $175.00 | $112.00 | $156.00 |
| 0090 | Pave striping-temp paint-4 in | LF A A | 11,000 | $0.01 | $0.01 | $0.23 | $0.23 | $0.01 | $0.01 |
| 0100 | Pave striping-perm paint-6 in | LF A A | 8,800 | $0.28 | $0.28 | $0.28 | $0.28 | $0.34 | $0.28 |
| 0110 | Remove pavement marker type V | EACH A A | 5 | $100.00 | $1.00 | $55.00 | $100.00 | $10.00 | $170.00 |
| 0120 | Asphalt material for tack non-tracking | TON A A | 3 | $0.01 | $1.45 | $0.01 | $407.50 | $1.00 | $0.01 |
| 0130 | Electronic delivery MGMT system | LS A A | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.01 |
| 0140 | Demobilization | LS A A | 1 | $1,000.00 | $1,263.00 | $1,295.00 | $1,455.00 | $3,500.00 | $7,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.