KYTC contract 26-4401 bid tabulation
ASPHALT RESURFACING EAST BROADWAY (US 150). Let by Kentucky Transportation Cabinet on April 23, 2026. 5 bids received; low bid $1,746,000 by Hall Contracting of Kentucky Inc, -15% against the engineer's estimate of $2,056,826.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 APR 2026
- Pay items
- 89
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hall Contracting of Kentucky Inc | $1,746,000 | Low | -15% |
| 2 | Louisville Paving Company Inc | $1,858,000 | +6.0% | -10% |
| 3 | Mac Construction & Excavating Inc | $1,898,000 | +9.0% | -8.0% |
| 4 | Flynn Brothers Contracting Inc | $1,989,315 | +14% | -3.0% |
| 5 | E & B Paving LLC | $1,998,000 | +14% | -3.0% |
Engineer's estimate: $2,056,826.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hall Contracting of Kentucky Inc | 2. Louisville Paving Company Inc | 3. Mac Construction & Excavating Inc | 4. Flynn Brothers Contracting Inc | 5. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 21 | $55.00 | $55.00 | $100.00 | $150.00 | $25.00 |
| 0020 | Mobilization for mill & text | LS A A | 1 | $6,500.00 | $35,000 | $15,000 | $7,500.00 | $15,000 |
| 0030 | Asphalt pave milling & texturing | TON A A | 6,295 | $24.55 | $16.30 | $24.00 | $30.00 | $22.10 |
| 0040 | Joint adhesive | LF A A | 66,119 | $0.38 | $0.39 | $0.20 | $0.42 | $0.45 |
| 0050 | CL3 asph surf 0.38A PG64-22 | TON A A | 6,293 | $93.60 | $103.00 | $110.00 | $101.00 | $108.00 |
| 0060 | Asphalt material for tack non-tracking | TON A A | 38 | $0.01 | $0.01 | $0.01 | $0.01 | $1.00 |
| 0070 | Adjust manhole | EACH A A | 15 | $230.00 | $250.00 | $200.00 | $0.01 | $2,500.00 |
| 0080 | Island header curb type 1 - modified | LF A A | 79 | $60.00 | $60.00 | $78.00 | $100.00 | $47.00 |
| 0090 | Remove curb | LF A A | 90 | $14.00 | $14.00 | $54.00 | $25.00 | $30.00 |
| 0100 | Standard barrier median type 4 mod | SQYD A A | 242 | $158.00 | $158.00 | $165.00 | $300.00 | $290.00 |
| 0110 | Remove pavement | SQYD A A | 187 | $22.00 | $30.00 | $68.00 | $25.00 | $60.00 |
| 0120 | Temporary signs | SQFT A A | 500 | $4.00 | $4.00 | $7.42 | $7.00 | $8.00 |
| 0130 | Maintain & control traffic | LS A A | 1 | $46,790 | $139,229 | $104,932 | $100,000 | $148,062 |
| 0140 | Portable changeable message sign | EACH A A | 2 | $700.00 | $1,908.00 | $1,590.00 | $1,750.00 | $500.00 |
| 0150 | Sidewalk-4 in concrete | SQYD A A | 89 | $95.00 | $95.00 | $87.57 | $500.00 | $110.00 |
| 0160 | Remove concrete sidewalk | SQYD A A | 77 | $18.00 | $18.00 | $72.62 | $25.00 | $80.00 |
| 0170 | Adjust water valve | EACH A A | 20 | $185.00 | $150.00 | $125.00 | $0.01 | $250.00 |
| 0180 | Sodding | SQYD A A | 177 | $9.30 | $14.55 | $14.55 | $15.00 | $46.73 |
| 0190 | Tubular markers | EACH A A | 65 | $280.00 | $411.62 | $411.62 | $75.00 | $412.00 |
| 0200 | Pave striping-temp paint-6 in | LF A A | 56,450 | $0.28 | $0.28 | $0.28 | $0.28 | $0.28 |
| 0210 | Pave striping-thermo-6 in W | LF A A | 31,013 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 0220 | Pave striping-thermo-6 in Y | LF A A | 23,629 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 |
| 0230 | Pave striping-thermo-12 in W | LF A A | 561 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 0240 | Pave striping-thermo-12 in Y | LF A A | 118 | $3.95 | $3.95 | $3.95 | $3.95 | $3.95 |
| 0250 | Pave marking-thermo X-walk-6 in | LF A A | 8,969 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 0260 | Pave marking-thermo stop bar-24IN | LF A A | 2,254 | $11.95 | $11.95 | $11.95 | $11.95 | $11.95 |
| 0270 | Pave marking-thermo cross-hatch | SQFT A A | 3,644 | $4.95 | $4.95 | $4.95 | $4.95 | $4.95 |
| 0280 | Pave marking-thermo STR arrow | EACH A A | 35 | $105.00 | $105.00 | $105.00 | $105.00 | $105.00 |
| 0290 | Pave marking-thermo curv arrow | EACH A A | 141 | $110.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 0300 | Pave marking-thermo comb arrow | EACH A A | 32 | $145.00 | $145.00 | $145.00 | $145.00 | $145.00 |
| 0310 | Pave marking-thermo only | EACH A A | 36 | $195.00 | $195.00 | $195.00 | $195.00 | $195.00 |
| 0320 | Inlaid pavement marker-MW | EACH A A | 270 | $28.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0330 | Inlaid pavement marker-by | EACH A A | 305 | $28.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0340 | Fuel adjustment | DOLL A A | 11,508 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0350 | Asphalt adjustment | DOLL A A | 28,904 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0360 | Law enforcement officer | HOUR A A | 150 | $90.00 | $80.00 | $95.00 | $80.00 | $100.00 |
| 0370 | Pave marking thermo-bike | EACH A A | 3 | $155.00 | $155.00 | $155.00 | $155.00 | $155.00 |
| 0380 | Remove sign | EACH A A | 11 | $100.00 | $100.00 | $100.00 | $200.00 | $100.00 |
| 0390 | Pave mark thermo cone cap-solid yellow | SQFT A A | 527 | $5.95 | $5.95 | $5.95 | $5.95 | $5.95 |
| 0400 | GMSS type D | EACH A A | 96 | $441.47 | $441.47 | $447.47 | $750.00 | $441.47 |
| 0410 | Pave marking-thermo yield bar-36 in | LF A A | 27 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0420 | Water blasting existing stripe | LF A A | 3,306 | $0.70 | $0.92 | $0.92 | $0.92 | $0.92 |
| 0430 | Detectable warnings | SQFT A A | 36 | $39.00 | $39.00 | $47.17 | $63.60 | $56.34 |
| 0440 | Pave mark-thermo-X-walk-24 in | LF A A | 11,053 | $11.65 | $11.65 | $11.65 | $11.65 | $11.65 |
| 0450 | Remove thermoplastic arrows | EACH A A | 2 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0460 | Pave mark-thermo "bus" 8 FT | EACH A A | 33 | $195.00 | $195.00 | $195.00 | $195.00 | $195.00 |
| 0470 | Pave marking thermo-bike lane arrow | EACH A A | 3 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 0480 | Pave marking-thermo dotted lane exten | LF A A | 616 | $2.95 | $2.95 | $2.95 | $2.95 | $2.95 |
| 0490 | Pave mark-green mma for bike lane | SQFT A A | 366 | $11.00 | $11.00 | $11.00 | $11.00 | $11.00 |
| 0500 | SBM alum sheet signs .080 in | SQFT A A | 1,425 | $22.42 | $22.42 | $22.42 | $30.00 | $22.42 |
| 0510 | Steel post type 1 | LF A A | 1,601 | $30.87 | $30.87 | $30.87 | $30.00 | $30.87 |
| 0520 | Barcode sign inventory | EACH A A | 371 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 0530 | Temporary signs | SQFT A A | 400 | $4.00 | $4.00 | $7.42 | $7.00 | $8.00 |
| 0540 | Arrow panel | EACH A A | 4 | $500.00 | $1,272.00 | $954.00 | $715.50 | $350.00 |
| 0550 | Fused connector kit | EACH A A | 8 | $350.00 | $191.00 | $191.00 | $350.00 | $191.00 |
| 0560 | Trenching and backfilling | LF A A | 156 | $14.51 | $8.31 | $8.31 | $14.51 | $8.31 |
| 0570 | Open cut roadway | LF A A | 55 | $190.67 | $113.00 | $113.00 | $190.67 | $113.00 |
| 0580 | Cable-no. 14/7C | LF A A | 3,300 | $2.31 | $6.76 | $6.76 | $2.31 | $6.76 |
| 0590 | Messenger-15400 LB | LF A A | 320 | $9.70 | $23.51 | $23.51 | $9.70 | $23.51 |
| 0600 | Install steel strain pole | EACH A A | 3 | $23,095 | $2,864.00 | $2,864.00 | $23,095 | $2,864.00 |
| 0610 | Temp relocation of signal head | EACH A A | 11 | $350.00 | $391.00 | $391.00 | $350.00 | $391.00 |
| 0620 | SBM alum sheet signs .080 in | SQFT A A | 35 | $50.00 | $350.00 | $22.42 | $50.00 | $30.00 |
| 0630 | Install span mounted sign | EACH A A | 7 | $400.00 | $391.00 | $391.00 | $400.00 | $391.00 |
| 0640 | Install pedestrian head-LED | EACH A A | 8 | $1,000.00 | $421.00 | $421.00 | $1,000.00 | $421.00 |
| 0650 | Install LED signal-3 section | EACH A A | 14 | $750.00 | $396.00 | $396.00 | $750.00 | $396.00 |
| 0660 | Install coordinating unit | EACH A A | 1 | $2,500.00 | $3,378.00 | $3,378.00 | $2,500.00 | $3,378.00 |
| 0670 | Electrical junction box type A | EACH A A | 2 | $3,500.00 | $1,874.00 | $1,874.00 | $3,500.00 | $1,874.00 |
| 0680 | Install ped detector-audible | EACH A A | 8 | $500.00 | $328.00 | $328.00 | $500.00 | $328.00 |
| 0690 | Install pole mounted sign | EACH A A | 1 | $350.00 | $414.00 | $414.00 | $350.00 | $414.00 |
| 0700 | Traffic signal pole base | CUYD A A | 16.30 | $300.00 | $2,811.00 | $2,811.00 | $300.00 | $2,811.00 |
| 0710 | Install signal pedestal | EACH A A | 4 | $5,000.00 | $3,034.00 | $3,034.00 | $5,000.00 | $3,034.00 |
| 0720 | Install pedestal post | EACH A A | 3 | $4,500.00 | $3,034.00 | $3,034.00 | $4,500.00 | $3,034.00 |
| 0730 | Tether wire | LF A A | 310 | $5.22 | $9.04 | $9.04 | $5.22 | $9.04 |
| 0740 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 104 | $1.01 | $7.20 | $7.20 | $1.01 | $7.20 |
| 0750 | PVC conduit-2 in-schedule 80 | LF A A | 55 | $1.55 | $13.88 | $13.88 | $1.55 | $13.88 |
| 0760 | PVC conduit-3 in-schedule 80 | LF A A | 52 | $2.77 | $23.07 | $23.07 | $2.77 | $23.07 |
| 0765 | Install signal controller-TY atc | EACH A A | 1 | $8,000.00 | $10,970 | $13,171 | $8,000.00 | $10,970 |
| 0770 | Remove signal equipment | EACH A A | 1 | $28,000 | $13,786 | $13,786 | $22,000 | $13,786 |
| 0780 | Conduit-1 1/4 in | LF A A | 50 | $7.45 | $21.43 | $21.43 | $7.45 | $21.43 |
| 0790 | Conduit-2 in | LF A A | 15 | $10.30 | $25.46 | $25.46 | $10.30 | $25.46 |
| 0800 | Trenching and backfilling | LF A A | 55 | $14.51 | $8.31 | $8.31 | $14.51 | $8.31 |
| 0810 | Piezoelectric sensor | EACH A A | 4 | $3,500.00 | $2,985.00 | $2,985.00 | $3,500.00 | $2,985.00 |
| 0820 | Loop wire | LF A A | 2,750 | $0.30 | $1.54 | $1.54 | $0.30 | $1.54 |
| 0830 | Loop saw slot and fill | LF A A | 560 | $25.00 | $12.16 | $12.16 | $25.00 | $12.16 |
| 0840 | Galvanized steel cabinet | EACH A A | 1 | $1,495.00 | $1,579.00 | $1,579.00 | $1,495.01 | $1,579.00 |
| 0850 | Wood post | EACH A A | 3 | $500.00 | $608.00 | $608.00 | $500.00 | $608.00 |
| 0860 | Electrical junction box type A | EACH A A | 1 | $3,500.00 | $2,009.00 | $2,009.00 | $3,500.00 | $2,009.00 |
| 0870 | Electrical junction box-10 X 8 X 4 | EACH A A | 1 | $1,000.00 | $913.00 | $913.00 | $1,000.00 | $913.00 |
| 0880 | Demobilization | LS A A | 1 | $26,257 | $27,750 | $30,000 | $31,450 | $32,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 23, 2026. Compiled by Mirage Metrics.