KYTC contract 26-2556 bid tabulation
ASPHALT RESURFACING DIXIE HIGHWAY (US 31W). Let by Kentucky Transportation Cabinet on October 22, 2026. 6 bids received; low bid $1,047,000 by Hall Contracting of Kentucky Inc, -16% against the engineer's estimate of $1,244,234.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 OCT 2026
- Pay items
- 36
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hall Contracting of Kentucky Inc | $1,047,000 | Low | -16% |
| 2 | E & B Paving LLC | $1,089,656 | +4.0% | -12% |
| 3 | Louisville Paving Company Inc | $1,132,000 | +8.0% | -9.0% |
| 4 | Mac Construction & Excavating Inc | $1,146,805 | +10% | -8.0% |
| 5 | Scotty'S Contracting & Stone LLC | $1,157,269 | +11% | -7.0% |
| 6 | Flynn Brothers Contracting Inc | $1,181,182 | +13% | -5.0% |
Engineer's estimate: $1,244,234.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hall Contracting of Kentucky Inc | 2. E & B Paving LLC | 3. Louisville Paving Company Inc | 4. Mac Construction & Excavating Inc | 5. Scotty'S Contracting & Stone LLC | 6. Flynn Brothers Contracting Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 1,070 | $87.20 | $82.00 | $120.00 | $102.00 | $89.10 | $93.50 |
| 0020 | CL2 asph surf 0.38D PG64-22 | TON A A | 1,400 | $87.20 | $82.00 | $96.00 | $97.00 | $99.00 | $89.15 |
| 0030 | Temporary signs | SQFT A A | 230 | $4.00 | $5.30 | $4.00 | $5.30 | $11.50 | $4.60 |
| 0040 | Maintain & control traffic | LS A A | 1 | $27,221 | $103,000 | $39,000 | $29,303 | $37,135 | $155,000 |
| 0050 | Portable changeable message sign | EACH A A | 2 | $1,000.00 | $530.00 | $1,272.00 | $1,060.00 | $570.00 | $650.00 |
| 0060 | Mobilization for mill & text | LS A A | 1 | $3,000.00 | $12,000 | $25,946 | $3,000.00 | $6,060.00 | $1,350.00 |
| 0070 | Asphalt pave milling & texturing | TON A A | 135 | $50.00 | $10.00 | $127.00 | $95.60 | $46.55 | $80.00 |
| 0080 | Edgeline rumble strips | LF A A | 24,080 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 |
| 0090 | Arrow panel | EACH A A | 2 | $500.00 | $318.00 | $848.00 | $636.00 | $350.00 | $477.00 |
| 0100 | Base failure repair | SQYD A A | 1,790 | $71.50 | $50.00 | $43.96 | $41.00 | $66.75 | $52.80 |
| 0110 | Conduit-1 1/4 in | LF A A | 10 | $18.49 | $12.00 | $18.49 | $18.49 | $18.49 | $12.00 |
| 0120 | Trenching and backfilling | LF A A | 5 | $47.64 | $17.00 | $47.64 | $47.64 | $47.64 | $17.00 |
| 0130 | Loop wire | LF A A | 800 | $2.08 | $0.50 | $2.08 | $2.08 | $2.08 | $0.50 |
| 0140 | Loop saw slot and fill | LF A A | 160 | $33.06 | $35.00 | $33.06 | $33.06 | $33.06 | $35.00 |
| 0150 | Pave striping-temp paint-6 in | LF A A | 51,030 | $0.19 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 |
| 0160 | Pave striping-thermo-6 in W | LF A A | 33,000 | $0.81 | $0.78 | $0.78 | $0.78 | $0.78 | $0.78 |
| 0170 | Pave striping-thermo-6 in Y | LF A A | 50,000 | $0.81 | $0.78 | $0.78 | $0.78 | $0.78 | $0.78 |
| 0180 | Pave striping-thermo-12 in W | LF A A | 705 | $1.85 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 0190 | Pave marking-thermo stop bar-24IN | LF A A | 28 | $8.60 | $7.95 | $7.95 | $7.95 | $7.95 | $7.95 |
| 0200 | Pave marking-thermo cross-hatch | SQFT A A | 375 | $2.30 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 0210 | Pave marking-thermo curv arrow | EACH A A | 7 | $95.00 | $92.00 | $92.00 | $92.00 | $92.00 | $92.00 |
| 0220 | Remove pavement marker type V | EACH A A | 602 | $6.00 | $9.19 | $1.00 | $8.65 | $6.00 | $11.75 |
| 0230 | Fuel adjustment | DOLL A A | 10,974 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0240 | Asphalt adjustment | DOLL A A | 27,563 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0250 | Wood post | EACH A A | 1 | $617.95 | $1,000.00 | $617.95 | $617.95 | $617.95 | $1,000.00 |
| 0260 | Law enforcement officer | HOUR A A | 75 | $85.00 | $80.00 | $80.00 | $85.00 | $50.00 | $85.00 |
| 0270 | Centerline rumble strips | LF A A | 21,000 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 |
| 0280 | Electrical junction box-10 X 8 X 4 | EACH A A | 1 | $760.42 | $3,045.00 | $760.42 | $760.42 | $760.42 | $3,045.00 |
| 0290 | Pave mark thermo cone cap-solid yellow | SQFT A A | 290 | $6.00 | $5.75 | $5.75 | $5.75 | $5.75 | $5.75 |
| 0300 | Pave marking-thermo yield bar-36 in | LF A A | 18 | $52.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0310 | CL3 asph surf 0.38A PG64-22 | TON A A | 5,650 | $87.20 | $90.00 | $96.00 | $107.00 | $99.00 | $91.00 |
| 0320 | Pave mark thermo chevron | SQFT A A | 280 | $5.50 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0330 | Pave marking-thermo dotted lane exten | LF A A | 370 | $3.00 | $2.75 | $2.75 | $2.75 | $2.75 | $2.75 |
| 0340 | Remove pavement marker | EACH A A | 602 | $6.00 | $6.01 | $1.00 | $8.74 | $6.00 | $11.75 |
| 0350 | Asphalt material for tack non-tracking | TON A A | 45 | $0.01 | $1.00 | $0.01 | $0.01 | $572.60 | $0.01 |
| 0360 | Demobilization | LS A A | 1 | $15,730 | $15,900 | $16,395 | $20,000 | $16,533 | $17,925 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.