KYTC contract 26-4511 bid tabulation
ASPHALT PAVEMENT & ROADWAY REHAB REEDYVILLE RD (KY 185). Let by Kentucky Transportation Cabinet on May 21, 2026. 2 bids received; low bid $4,997,012 by Scotty'S Contracting & Stone LLC, +8.3% against the engineer's estimate of $4,612,059.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 MAY 2026
- Pay items
- 90
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $4,997,012 | Low | +8.0% |
| 2 | Cleary Construction Inc | $5,128,000 | +3.0% | +11% |
Engineer's estimate: $4,612,059.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 1,227 | $50.84 | $60.00 |
| 0020 | Asphalt seal aggregate | TON A A | 120 | $287.56 | $135.00 |
| 0030 | Asphalt seal coat | TON A A | 14 | $1,289.50 | $1,150.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 1,134 | $145.47 | $135.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A A | 64 | $277.01 | $250.00 |
| 0060 | CL3 asph surf 0.38D PG64-22 | TON A A | 2,624 | $108.79 | $125.00 |
| 0070 | Temporary signs | SQFT A A | 150 | $8.08 | $6.00 |
| 0080 | Maintain & control traffic | LS A A | 1 | $3,291.98 | $40,000 |
| 0090 | Mobilization for mill & text | LS A A | 1 | $1,145.25 | $3,500.00 |
| 0100 | Asphalt pave milling & texturing | TON A A | 1,141 | $50.25 | $48.00 |
| 0110 | Edgeline rumble strips | LF A A | 6,568 | $0.27 | $0.20 |
| 0120 | Base failure repair | SQYD A A | 1,722 | $134.42 | $195.00 |
| 0130 | Pave striping-temp paint-4 in | LF A A | 3,500 | $0.30 | $0.30 |
| 0140 | Pave striping-thermo-6 in W | LF A A | 6,568 | $1.30 | $1.30 |
| 0150 | Pave striping-thermo-6 in Y | LF A A | 4,950 | $1.30 | $1.30 |
| 0160 | Asphalt material for tack non-tracking | TON A A | 21 | $626.73 | $700.00 |
| 0170 | Delineator for G/R BI directional white | EACH A A | 153 | $14.75 | $13.00 |
| 0180 | Temp ditch | LF A A | 12,236 | $0.01 | $1.00 |
| 0190 | Clean temp ditch | LF A A | 6,117 | $0.01 | $0.01 |
| 0200 | Embankment in place | CUYD A A | 9,172 | $75.55 | $92.00 |
| 0210 | Fence-temp | LF A A | 589 | $2.83 | $15.00 |
| 0220 | Remove & replace fence | LF A A | 589 | $4.04 | $15.00 |
| 0230 | G/R-steel W beam-S face A | LF A A | 100 | $64.78 | $65.00 |
| 0240 | G/R terminal section no 1 | EACH A A | 20 | $88.51 | $75.00 |
| 0250 | G/R end treatment type 1 | EACH A A | 4 | $3,506.63 | $3,900.00 |
| 0260 | G/R end treatment type 2A | EACH A A | 1 | $1,906.86 | $2,200.00 |
| 0270 | Remove G/R | LF A A | 6,745 | $3.67 | $3.80 |
| 0280 | G/R end treatment type 4A | EACH A A | 1 | $3,789.40 | $3,975.00 |
| 0290 | Channel lining class II | TON A A | 200 | $91.98 | $105.00 |
| 0300 | Temporary signs | SQFT A A | 650 | $8.08 | $6.00 |
| 0310 | Maintain & control traffic | LS A A | 1 | $229,106 | $235,000 |
| 0320 | Maintain & control traffic | LS A A | 1 | $135,324 | $195,000 |
| 0330 | Portable changeable message sign | EACH A A | 4 | $8,546.25 | $5,194.00 |
| 0340 | Mobilization for mill & text | LS A A | 1 | $7,061.39 | $3,500.00 |
| 0350 | Mobilization for mill & text | LS A A | 1 | $785.22 | $3,500.00 |
| 0360 | Edgeline rumble strips | LF A A | 32,010 | $0.27 | $0.20 |
| 0370 | Temp silt fence | LF A A | 12,236 | $7.80 | $3.00 |
| 0380 | Silt trap type A | EACH A A | 12 | $328.95 | $370.00 |
| 0390 | Silt trap type B | EACH A A | 12 | $330.03 | $200.00 |
| 0400 | Silt trap type C | EACH A A | 12 | $328.95 | $385.00 |
| 0410 | Clean silt trap type A | EACH A A | 12 | $0.01 | $0.01 |
| 0420 | Clean silt trap type B | EACH A A | 12 | $0.01 | $0.01 |
| 0430 | Clean silt trap type C | EACH A A | 12 | $0.01 | $0.01 |
| 0440 | Staking | LS A A | 1 | $75,331 | $95,000 |
| 0450 | Trim & remove trees & brush | LF A A | 3,765 | $18.40 | $23.70 |
| 0460 | Temp signal 2 phase | EACH A A | 1 | $36,920 | $25,000 |
| 0470 | Erosion control blanket | SQYD A A | 27,661 | $1.75 | $2.65 |
| 0480 | Temp mulch | SQYD A A | 36,251 | $0.20 | $0.26 |
| 0490 | Temp seeding and protection | SQYD A A | 27,189 | $0.30 | $0.28 |
| 0500 | Initial fertilizer | TON A A | 2.80 | $1,500.00 | $1,800.00 |
| 0510 | Maintenance fertilizer | TON A A | 1.70 | $1,500.00 | $1,800.00 |
| 0520 | Seeding and protection | SQYD A A | 27,189 | $0.45 | $0.55 |
| 0530 | Pave striping-temp paint-4 in | LF A A | 15,374 | $0.30 | $0.30 |
| 0540 | Pave striping-thermo-6 in W | LF A A | 32,010 | $1.30 | $1.30 |
| 0550 | Pave striping-thermo-6 in Y | LF A A | 32,010 | $1.30 | $1.30 |
| 0560 | Pave striping-thermo-12 in W | LF A A | 60 | $12.00 | $12.00 |
| 0570 | Foundation preparation | LS A A | 1 | $187,233 | $150,000 |
| 0580 | Foundation preparation | LS A A | 1 | $137,233 | $100,000 |
| 0590 | Cyclopean stone rip rap | TON A A | 41 | $75.00 | $75.00 |
| 0600 | Concrete-class A | CUYD A A | 258.20 | $2,800.00 | $2,800.00 |
| 0610 | Steel reinforcement | LB A A | 33,207 | $2.17 | $2.17 |
| 0620 | G/R-bridge case I | LF A A | 100 | $124.31 | $185.00 |
| 0630 | Fuel adjustment | DOLL A A | 6,190 | $1.00 | $1.00 |
| 0640 | Asphalt adjustment | DOLL A A | 15,548 | $1.00 | $1.00 |
| 0650 | Object marker TY 3 | EACH A A | 5 | $24.63 | $65.00 |
| 0660 | Soil nail wall | SQFT A A | 3,000 | $119.98 | $130.00 |
| 0670 | Remove-store and reinstall sign | EACH A A | 26 | $569.68 | $500.00 |
| 0680 | Longitudinal edge key | LF A A | 5,834 | $6.82 | $6.25 |
| 0690 | G/R steel W beam-S face (7 FT post) | LF A A | 7,079 | $34.94 | $28.90 |
| 0700 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.31 |
| 0710 | Entrance pipe-15 in | LF A A | 54 | $118.24 | $110.00 |
| 0720 | Culvert pipe-18 in | LF A A | 370 | $345.14 | $150.00 |
| 0730 | Culvert pipe-24 in | LF A A | 331 | $435.36 | $175.00 |
| 0740 | Culvert pipe-30 in | LF A A | 42 | $457.71 | $225.00 |
| 0750 | Pipe culvert headwall-18 in | EACH A A | 1 | $3,240.00 | $3,000.00 |
| 0760 | Pipe culvert headwall-30 in | EACH A A | 1 | $4,320.00 | $4,000.00 |
| 0770 | Remove pipe | LF A A | 563 | $48.70 | $65.00 |
| 0780 | Metal end section TY 2-18 in | EACH A A | 1 | $3,000.00 | $4,750.00 |
| 0790 | Safety box inlet-18 in SDB-1 | EACH A A | 3 | $6,000.00 | $6,500.00 |
| 0800 | Safety box inlet-18 in DBL SDB-5 | EACH A A | 1 | $7,500.00 | $8,500.00 |
| 0810 | Safety box inlet-24 in DBL SDB-5 | EACH A A | 1 | $8,500.00 | $9,000.00 |
| 0820 | Remove headwall | EACH A A | 25 | $1,900.92 | $1,000.00 |
| 0830 | Remove headwall | EACH A A | 18 | $1,500.00 | $1,500.00 |
| 0840 | Safeloading | CUYD A A | 2.20 | $1,000.00 | $500.00 |
| 0850 | Clean pipe structure | EACH A A | 8 | $1,200.00 | $1,200.00 |
| 0860 | Pipeline inspection | LF A A | 1,292 | $2.35 | $2.35 |
| 0870 | Sloped and mitered headwall-18 in | EACH A A | 11 | $3,000.00 | $3,000.00 |
| 0880 | Sloped and mitered headwall-24 in | EACH A A | 13 | $3,800.00 | $4,000.00 |
| 0890 | Sloped and mitered headwall-30 in | EACH A A | 1 | $4,000.00 | $5,000.00 |
| 0900 | Demobilization | LS A A | 1 | $73,527 | $75,780 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 21, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.