KYTC contract 26-1510 bid tabulation
WIDENING THREE SPRINGS RD (KY 884). Let by Kentucky Transportation Cabinet on April 23, 2026. 2 bids received; low bid $14,589,689 by Scotty'S Contracting & Stone LLC, -11% against the engineer's estimate of $16,419,155.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 APR 2026
- Pay items
- 171
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $14,589,689 | Low | -11% |
| 2 | Cleary Construction Inc | $18,330,000 | +26% | +12% |
Engineer's estimate: $16,419,155.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 11,715 | $36.23 | $39.00 |
| 0020 | Asphalt seal aggregate | TON A A | 9 | $59.30 | $300.00 |
| 0030 | Asphalt seal coat | TON A A | 1 | $842.50 | $1,600.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 1,341 | $112.30 | $150.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A A | 17,384 | $91.93 | $110.00 |
| 0055 | CL4 asph surf 0.38A PG76-22 | TON A A | 185 | $208.20 | $165.00 |
| 0060 | CL3 asph surf 0.38B PG64-22 | TON A A | 3,114 | $122.01 | $125.00 |
| 0070 | Cem conc ent pavement-8 in | SQYD A A | 1,884 | $101.57 | $101.57 |
| 0080 | Joint adhesive | LF A A | 28,600 | $0.50 | $0.50 |
| 0090 | Asphalt material for tack non-tracking | TON A A | 40.17 | $664.32 | $725.00 |
| 0100 | Crushed aggregate size no 2 | TON A A | 12,292 | $33.88 | $38.00 |
| 0110 | Standard curb and gutter | LF A A | 16,150 | $24.58 | $24.58 |
| 0120 | Standard curb and gutter mod | LF A A | 446 | $69.57 | $69.57 |
| 0130 | Lip curb and gutter | LF A A | 301 | $36.12 | $36.12 |
| 0140 | Standard integral curb | LF A A | 138 | $32.21 | $32.21 |
| 0150 | Standard header curb | LF A A | 920 | $26.65 | $26.65 |
| 0160 | Island header curb type 1 | LF A A | 86 | $44.20 | $44.20 |
| 0170 | Relocate temp conc barrier | LF A A | 5,030 | $8.43 | $13.00 |
| 0180 | JPC pavement-8 in | SQYD A A | 359 | $125.45 | $125.45 |
| 0190 | Remove pavement | SQYD A A | 700 | $18.89 | $40.00 |
| 0200 | Paved ditch type 1 | SQYD A A | 25 | $261.71 | $261.71 |
| 0210 | Temp ditch | LF A A | 4,123 | $0.01 | $1.00 |
| 0220 | Clean temp ditch | LF A A | 2,062 | $0.01 | $0.01 |
| 0230 | Remove paved ditch | SQYD A A | 22 | $54.28 | $50.00 |
| 0240 | Embankment in place | CUYD A A | 34,092 | $22.46 | $59.00 |
| 0250 | Water | MGAL A A | 312 | $0.01 | $0.01 |
| 0260 | Remove fence | LF A A | 1,036 | $3.91 | $5.00 |
| 0270 | Fence-8 FT chain link | LF A A | 924 | $82.17 | $100.00 |
| 0280 | G/R-steel W beam-S face | LF A A | 362.50 | $25.57 | $45.00 |
| 0290 | G/R end treatment type 1 | EACH A A | 2 | $3,014.84 | $5,000.00 |
| 0300 | G/R end treatment type 2M | EACH A A | 3 | $1,371.50 | $2,000.00 |
| 0310 | Remove G/R | LF A A | 1,555 | $1.79 | $2.00 |
| 0320 | Right-of-way monument type 1 | EACH A A | 65 | $243.70 | $150.00 |
| 0330 | Witness post | EACH A A | 33 | $145.40 | $150.00 |
| 0340 | Channel lining class II | TON A A | 3,395 | $58.96 | $68.00 |
| 0350 | Channel lining class III | TON A A | 3,335 | $62.84 | $65.00 |
| 0360 | Clearing and grubbing | LS A A | 1 | $62,711 | $200,000 |
| 0370 | Temporary signs | SQFT A A | 354 | $10.25 | $8.48 |
| 0380 | Edge key | LF A A | 20 | $43.87 | $325.00 |
| 0390 | Fabric-geotextile class 1 | SQYD A A | 2,320 | $4.35 | $3.25 |
| 0400 | Fabric-geotextile class 2 | SQYD A A | 12,850 | $2.15 | $2.50 |
| 0410 | Maintain & control traffic | LS A A | 1 | $242,327 | $485,000 |
| 0411 | Maintain & control traffic | LS A A | 1 | $60,513 | $225,000 |
| 0420 | Portable changeable message sign | EACH A A | 6 | $11,404 | $8,904.00 |
| 0430 | Mobilization for mill & text | LS A A | 1 | $5,944.47 | $3,500.00 |
| 0440 | Asphalt pave milling & texturing | TON A A | 280 | $62.41 | $140.00 |
| 0450 | Safeloading | CUYD A A | 10 | $500.00 | $450.00 |
| 0460 | Temp silt fence | LF A A | 6,477 | $2.16 | $3.50 |
| 0470 | Silt trap type A | EACH A A | 15 | $283.34 | $345.00 |
| 0480 | Silt trap type B | EACH A A | 15 | $266.06 | $195.00 |
| 0490 | Silt trap type C | EACH A A | 15 | $228.79 | $325.00 |
| 0500 | Clean silt trap type A | EACH A A | 15 | $70.44 | $0.01 |
| 0510 | Clean silt trap type B | EACH A A | 15 | $70.44 | $0.01 |
| 0520 | Clean silt trap type C | EACH A A | 15 | $72.28 | $0.01 |
| 0530 | Sidewalk-4 in concrete | SQYD A A | 7,459 | $49.74 | $51.00 |
| 0540 | Staking | LS A A | 1 | $126,366 | $250,000 |
| 0545 | Remove structure | LS A A | 1 | $131,390 | $131,390 |
| 0550 | Relocate crash cushion | EACH A A | 6 | $2,300.45 | $3,000.00 |
| 0560 | Install temp crash cushion | EACH A A | 8 | $4,324.83 | $9,000.00 |
| 0570 | Conc barrier wall type 9T | LF A A | 2,860 | $23.34 | $110.00 |
| 0580 | Erosion control blanket | SQYD A A | 6,500 | $1.85 | $1.85 |
| 0590 | Temp mulch | SQYD A A | 57,482 | $0.20 | $0.20 |
| 0600 | Temp seeding and protection | SQYD A A | 42,897 | $0.30 | $0.30 |
| 0610 | Initial fertilizer | TON A A | 1.30 | $1,500.00 | $1,500.00 |
| 0620 | Maintenance fertilizer | TON A A | 2.10 | $1,500.00 | $1,500.00 |
| 0630 | Seeding and protection | SQYD A A | 6,222 | $0.42 | $0.42 |
| 0640 | Sodding | SQYD A A | 27,619 | $8.00 | $8.00 |
| 0650 | Agricultural limestone | TON A A | 25 | $75.00 | $75.00 |
| 0660 | SBM alum sheet signs .080 in | SQFT A A | 297 | $33.97 | $15.00 |
| 0670 | Steel post type 1 | LF A A | 400 | $17.36 | $40.00 |
| 0680 | Pave striping-temp paint-6 in | LF A A | 122,860 | $0.31 | $0.31 |
| 0690 | Pave striping-perm paint-6 in | LF A A | 39,989 | $0.33 | $0.33 |
| 0700 | Pave striping-perm paint-12 in | LF A A | 77 | $5.00 | $5.00 |
| 0710 | Pave striping-thermo-12 in W | LF A A | 603 | $6.00 | $6.00 |
| 0720 | Pave striping-thermo-12 in Y | LF A A | 77 | $6.00 | $6.00 |
| 0730 | Pave marking-thermo stop bar-24IN | LF A A | 62 | $15.00 | $15.00 |
| 0740 | Pave marking-thermo curv arrow | EACH A A | 34 | $150.00 | $150.00 |
| 0750 | Pave marking-thermo comb arrow | EACH A A | 8 | $300.00 | $300.00 |
| 0760 | Pave marking-thermo merge arrow | EACH A A | 1 | $500.00 | $500.00 |
| 0770 | Inlaid pavement marker-MW | EACH A A | 18 | $25.00 | $25.00 |
| 0780 | Inlaid pavement marker-by | EACH A A | 379 | $25.00 | $25.00 |
| 0790 | Fuel adjustment | DOLL A A | 21,374 | $1.00 | $1.00 |
| 0800 | Asphalt adjustment | DOLL A A | 83,017 | $1.00 | $1.00 |
| 0810 | Object marker TY 3 | EACH A A | 2 | $26.18 | $75.00 |
| 0815 | Milled rumble strips | LF A A | 1,600 | $2.85 | $2.85 |
| 0816 | Law enforcement officer | HOUR A A | 300 | $96.75 | $90.00 |
| 0820 | Thrie beam to W beam connector | EACH A A | 2 | $319.11 | $2,000.00 |
| 0830 | Longitudinal edge key | LF A A | 7,397 | $4.31 | $3.25 |
| 0840 | G/R steel W beam-S face (7 FT post) | LF A A | 2,137.50 | $28.85 | $38.00 |
| 0850 | Pave marking-thermo yield bar-36 in | LF A A | 56 | $40.00 | $40.00 |
| 0860 | Detectable warnings | SQFT A A | 428 | $43.94 | $43.94 |
| 0870 | Pave mark-thermo-yield | EACH A A | 4 | $400.00 | $400.00 |
| 0880 | Barcode sign inventory | EACH A A | 67 | $23.43 | $20.00 |
| 0890 | Utility coordination | LS A A | 1 | $32,250 | $75,000 |
| 0900 | Thrie beam G/R transition TL-2 | EACH A A | 4 | $2,190.02 | $3,000.00 |
| 0910 | Thrie beam bullnose terminal | EACH A A | 2 | $21,058 | $22,000 |
| 0920 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $0.01 |
| 0930 | Entrance pipe-18 in | LF A A | 60 | $107.27 | $130.00 |
| 0940 | Entrance pipe-24 in | LF A A | 180 | $130.78 | $135.00 |
| 0950 | Culvert pipe-15 in | LF A A | 48 | $125.58 | $155.00 |
| 0960 | Storm sewer pipe-12 in | LF A A | 4 | $306.99 | $400.00 |
| 0970 | Storm sewer pipe-15 in | LF A A | 2,464 | $105.72 | $125.00 |
| 0980 | Storm sewer pipe-18 in | LF A A | 5,706 | $110.04 | $140.00 |
| 0990 | Storm sewer pipe-24 in | LF A A | 1,474 | $130.87 | $150.00 |
| 1000 | Perforated pipe-4 in | LF A A | 565 | $23.77 | $38.00 |
| 1010 | Non-perforated pipe-4 in | LF A A | 89 | $23.98 | $48.00 |
| 1020 | Perf pipe headwall TY 1-4 in | EACH A A | 2 | $788.22 | $1,200.00 |
| 1030 | Pipe culvert headwall-15 in | EACH A A | 2 | $1,400.00 | $3,000.00 |
| 1040 | Pipe culvert headwall-18 in | EACH A A | 5 | $1,800.00 | $3,500.00 |
| 1050 | Pipe culvert headwall-24 in | EACH A A | 1 | $2,000.00 | $3,750.00 |
| 1060 | Sloped box outlet type 1-15 in | EACH A A | 1 | $2,500.00 | $3,500.00 |
| 1070 | S & F box inlet-outlet-24 in | EACH A A | 1 | $3,200.00 | $5,000.00 |
| 1080 | Curb box inlet type A | EACH A A | 68 | $7,200.00 | $9,000.00 |
| 1090 | Drop box inlet type 3 | EACH A A | 11 | $5,400.00 | $9,500.00 |
| 1100 | Drop box inlet type 11 | EACH A A | 1 | $4,800.00 | $4,750.00 |
| 1110 | Drop box inlet type 12 | LF A A | 40 | $585.00 | $635.00 |
| 1120 | Drop box inlet type 13G | EACH A A | 7 | $4,800.00 | $5,500.00 |
| 1130 | Drop box inlet type 13S | EACH A A | 1 | $8,500.00 | $9,500.00 |
| 1140 | Drop box inlet type 14 | EACH A A | 15 | $4,000.00 | $4,500.00 |
| 1150 | Cored hole drainage box con-4 in | EACH A A | 75 | $200.00 | $800.00 |
| 1160 | Manhole type A | EACH A A | 1 | $5,000.00 | $5,500.00 |
| 1170 | Fabric-geotextile class 2 for pipe | SQYD A A | 15,135 | $2.00 | $2.00 |
| 1180 | Concrete-class A | CUYD A A | 1.99 | $2,000.00 | $1,200.00 |
| 1190 | Bore and jack pipe-24 in | LF A A | 113 | $638.51 | $850.00 |
| 1195 | Precast box culvert 6'X3' | LF A A | 95 | $1,285.00 | $1,285.00 |
| 1196 | Box culvert headwall | EACH A A | 2 | $11,145 | $11,145 |
| 1200 | Pipeline inspection | LF A A | 5,643 | $2.35 | $2.35 |
| 1210 | Remove concrete masonry | CUYD A A | 18.90 | $285.00 | $285.00 |
| 1220 | Foundation preparation | LS A A | 1 | $49,315 | $49,315 |
| 1230 | Concrete-class A | CUYD A A | 96.90 | $865.00 | $865.00 |
| 1240 | Steel reinforcement | LB A A | 12,928 | $2.10 | $2.10 |
| 1250 | Structure granular backfill | CUYD A A | 242 | $97.00 | $97.00 |
| 1260 | Armored edge for concrete | LF A A | 76.20 | $103.90 | $103.90 |
| 1270 | Foundation preparation | LS A A | 1 | $425,324 | $425,324 |
| 1280 | Crushed aggregate slope prot | TON A A | 1,217 | $37.65 | $37.65 |
| 1290 | Test piles | LF A A | 108 | $100.00 | $100.00 |
| 1300 | Piles-steel HP12X53 | LF A A | 956 | $90.00 | $90.00 |
| 1310 | Pile points-12 in | EACH A A | 22 | $275.00 | $275.00 |
| 1320 | Concrete-class A | CUYD A A | 562.10 | $856.00 | $856.00 |
| 1330 | Concrete-class AA | CUYD A A | 630.70 | $1,030.00 | $1,030.00 |
| 1340 | Mechanical reinf coupler #11 | EACH A A | 36 | $290.00 | $290.00 |
| 1350 | Steel reinforcement | LB A A | 68,736 | $1.95 | $1.95 |
| 1360 | Steel reinforcement-epoxy coated | LB A A | 139,496 | $2.00 | $2.00 |
| 1370 | Precast PC box beam SB27 | LF A A | 1,592.50 | $495.00 | $495.00 |
| 1380 | Bridge chain link fence-7 FT | LF A A | 456 | $178.00 | $178.00 |
| 1390 | Drilled shaft 54 in-solid rock | LF A A | 135 | $3,359.00 | $3,359.00 |
| 1400 | Drilled shaft 60 in-common | LF A A | 459 | $1,300.00 | $1,300.00 |
| 1410 | Rock soundings | LF A A | 488.30 | $58.60 | $58.60 |
| 1420 | Rock corings | LF A A | 354 | $93.75 | $93.75 |
| 1425 | CSL testing (4 tubes) | EACH A A | 15 | $3,090.00 | $3,090.00 |
| 1430 | Concrete sealing | SQFT A A | 30,303 | $2.21 | $2.21 |
| 1440 | Deck drain | EACH A A | 8 | $935.00 | $935.00 |
| 1450 | Mobilization for concrete surf treatment | LS A A | 1 | $13,070 | $13,070 |
| 1460 | Pole 30 FT MTG HT | EACH A A | 10 | $2,650.00 | $2,650.00 |
| 1470 | Bracket 4 FT | EACH A A | 2 | $508.00 | $508.00 |
| 1480 | Bracket 10 FT | EACH A A | 7 | $975.00 | $975.00 |
| 1490 | Bracket 15 FT | EACH A A | 1 | $1,018.00 | $1,018.00 |
| 1500 | Pole base | EACH A A | 10 | $3,217.00 | $3,217.00 |
| 1510 | Transformer base | EACH A A | 10 | $1,717.00 | $1,717.00 |
| 1520 | Lighting control equipment | EACH A A | 1 | $21,950 | $21,950 |
| 1530 | Fused connector kit | EACH A A | 20 | $261.00 | $261.00 |
| 1540 | Conduit-2 in | LF A A | 250 | $21.91 | $21.91 |
| 1550 | Trenching and backfilling | LF A A | 1,267 | $4.42 | $4.42 |
| 1560 | Wire-no. 12 | LF A A | 1,209 | $1.63 | $1.63 |
| 1570 | Electrical junction box type A | EACH A A | 8 | $1,757.00 | $1,757.00 |
| 1580 | Bore and jack conduit | LF A A | 250 | $62.35 | $62.35 |
| 1590 | Wire-no. 10 | LF A A | 5,169 | $1.63 | $1.63 |
| 1600 | LED luminaire | EACH A A | 10 | $703.00 | $703.00 |
| 1610 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,267 | $8.92 | $8.92 |
| 1620 | Mobilization | LS A A | 1 | $543,985 | $855,000 |
| 1630 | Demobilization | LS A A | 1 | $209,625 | $257,078 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.