KYTC contract 25-2345 bid tabulation
ASPHALT RESURFACING MAYESVILLE BYPASS/HEATHER FRENCH HENRY HIGHWAY (US 68). Let by Kentucky Transportation Cabinet on September 25, 2025. 2 bids received; low bid $1,575,365 by H G Mays Corporation, -26% against the engineer's estimate of $2,120,488.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 31
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | H G Mays Corporation | $1,575,365 | Low | -26% |
| 2 | Eaton Asphalt Paving Co Inc | $1,721,251 | +9.0% | -19% |
Engineer's estimate: $2,120,488.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H G Mays Corporation | 2. Eaton Asphalt Paving Co Inc |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 800 | $30.00 | $47.00 |
| 0020 | Leveling & wedging PG64-22 | TON A A | 881 | $80.00 | $83.50 |
| 0030 | CL2 asph surf 0.38D PG64-22 | TON A A | 3,610 | $80.00 | $83.25 |
| 0040 | CL3 asph surf 0.38D PG64-22 | TON A A | 10,705 | $80.00 | $83.25 |
| 0050 | Temporary signs | SQFT A A | 310 | $1.00 | $5.00 |
| 0060 | Maintain & control traffic | LS A A | 1 | $16,171 | $28,770 |
| 0070 | Portable changeable message sign | EACH A A | 2 | $1.00 | $1,050.00 |
| 0080 | Mobilization for mill & text | LS A A | 1 | $1,000.00 | $6,525.00 |
| 0090 | Asphalt pave milling & texturing | TON A A | 5,420 | $6.75 | $16.50 |
| 0100 | Edgeline rumble strips | LF A A | 78,300 | $0.13 | $0.18 |
| 0110 | Arrow panel | EACH A A | 2 | $200.00 | $200.00 |
| 0120 | Pave striping-temp paint-4 in | LF A A | 128,300 | $0.01 | $0.01 |
| 0130 | Pave striping-thermo-6 in W | LF A A | 70,000 | $1.00 | $1.05 |
| 0140 | Pave striping-thermo-6 in Y | LF A A | 56,500 | $1.00 | $1.05 |
| 0150 | Pave striping-thermo-12 in W | LF A A | 1,800 | $3.50 | $2.00 |
| 0160 | Pave marking-thermo stop bar-24IN | LF A A | 199 | $12.00 | $9.00 |
| 0170 | Pave marking-thermo cross-hatch | SQFT A A | 262 | $4.25 | $6.50 |
| 0180 | Pave marking-thermo STR arrow | EACH A A | 2 | $115.00 | $125.00 |
| 0190 | Pave marking-thermo curv arrow | EACH A A | 26 | $125.00 | $95.00 |
| 0200 | Pave marking-thermo comb arrow | EACH A A | 1 | $135.00 | $135.00 |
| 0210 | Fuel adjustment | DOLL A A | 23,653 | $1.00 | $1.00 |
| 0220 | Asphalt adjustment | DOLL A A | 59,410 | $1.00 | $1.00 |
| 0230 | Centerline rumble strips | LF A A | 20,850 | $0.25 | $0.30 |
| 0240 | Pave mark thermo chevron | SQFT A A | 560 | $6.00 | $6.25 |
| 0250 | Pave mark thermo-wrong way arrow | EACH A A | 6 | $400.00 | $3.66 |
| 0260 | Asphalt material for tack non-tracking | TON A A | 68 | $1.00 | $1.00 |
| 0270 | Transverse in-lane rumble strips | EACH A A | 3 | $2,500.00 | $2,500.00 |
| 0280 | Install radar presence detector type A | EACH A A | 4 | $1,030.00 | $1,030.00 |
| 0290 | Install radar advance detector type B | EACH A A | 2 | $1,030.00 | $1,030.00 |
| 0300 | Electronic delivery MGMT system - agg | LS A A | 1 | $1.00 | $0.01 |
| 0310 | Demobilization | LS A A | 1 | $22,054 | $24,850 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.