KYTC contract 25-1001 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY-587. Let by Kentucky Transportation Cabinet on January 23, 2025, Lee, District 10. 1 bid received; low bid $3,709,372 by Hinkle Contracting Company LLC, -21% against the engineer's estimate of $4,676,360.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 JAN 2025
- Pay items
- 109
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hinkle Contracting Company LLC | $3,709,372 | Low | -21% |
Engineer's estimate: $4,676,360.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hinkle Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Dga base | TON A | 1,450 | $52.25 |
| 0020 | Crushed stone base | TON A | 3,570 | $47.85 |
| 0030 | Traffic bound base | TON A | 338 | $36.08 |
| 0040 | Asphalt seal aggregate | TON A | 39.46 | $310.00 |
| 0050 | Asphalt seal coat | TON A | 5.65 | $1,000.00 |
| 0060 | Leveling & wedging PG64-22 | TON A | 761 | $137.85 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A | 3,088 | $127.65 |
| 0080 | CL2 asph base 0.75D PG64-22 | TON A | 2,518 | $130.85 |
| 0090 | CL2 asph surf 0.38D PG64-22 | TON A | 2,564 | $135.85 |
| 0100 | Asphalt pave milling & texturing | TON A | 5,278 | $25.75 |
| 0110 | Joint adhesive | LF A | 1,714 | $0.93 |
| 0120 | Asphalt material for tack non-tracking | TON A | 18.76 | $10.00 |
| 0130 | Crushed aggregate size no 2 | TON A | 4 | $154.64 |
| 0140 | Perforated pipe-4 in | LF A | 283 | $16.49 |
| 0150 | Non-perforated pipe-4 in | LF A | 201 | $16.49 |
| 0160 | Perf pipe headwall TY 2-4 in | EACH A | 1 | $1,030.93 |
| 0170 | Perf pipe headwall TY 3-4 in | EACH A | 3 | $1,030.93 |
| 0180 | Remove curb | LF A | 428 | $10.31 |
| 0190 | Delineator for guardrail BI directional white | EACH A | 45 | $15.46 |
| 0200 | Barricade-type III | EACH A | 10 | $163.92 |
| 0210 | Remove pavement | SQYD A | 1,947 | $12.37 |
| 0220 | Temp ditch | LF A | 857 | $1.03 |
| 0230 | Clean temp ditch | LF A | 428 | $0.10 |
| 0240 | Embankment in place | CUYD A | 45,332 | $10.31 |
| 0250 | Water | MGAL A | 33 | $1.03 |
| 0260 | Remove & reset fence | LF A | 125 | $25.77 |
| 0270 | Guardrail-steel W beam-S face | LF A | 1,209 | $39.18 |
| 0280 | Guardrail terminal section no 1 | EACH A | 5 | $154.64 |
| 0290 | Guardrail end treatment type 1 | EACH A | 6 | $5,154.64 |
| 0300 | Remove & reset guardrail | LF A | 437.50 | $20.62 |
| 0310 | Temp guardrail | LF A | 638 | $20.62 |
| 0320 | Channel lining class III | TON A | 2,923 | $52.58 |
| 0330 | Clearing and grubbing | LS A | 1 | $51,000 |
| 0340 | Temporary signs | SQFT A | 434 | $18.00 |
| 0350 | Edge key | LF A | 65 | $50.00 |
| 0360 | Maintain & control traffic | LS A | 1 | $97,250 |
| 0370 | Maintain & control traffic | LS A | 1 | $85,000 |
| 0380 | Maintain & control traffic | LS A | 1 | $75,000 |
| 0390 | Diversions (by-pass detours) | LS A | 1 | $50,000 |
| 0400 | Diversions (by-pass detours) | LS A | 1 | $20,000 |
| 0410 | Lane closure | EACH A | 2 | $4,000.00 |
| 0420 | Portable changeable message sign | EACH A | 7 | $15,000 |
| 0430 | Mobilization for mill & text | LS A | 1 | $12,000 |
| 0440 | Mobilization for mill & text | LS A | 1 | $12,000 |
| 0450 | Shoulder rumble strips | LF A | 8,354 | $0.43 |
| 0460 | Temp silt fence | LF A | 857 | $2.06 |
| 0470 | Silt trap type A | EACH A | 10 | $51.55 |
| 0480 | Silt trap type B | EACH A | 10 | $51.55 |
| 0490 | Silt trap type C | EACH A | 10 | $51.55 |
| 0500 | Clean silt trap type A | EACH A | 10 | $10.31 |
| 0510 | Clean silt trap type B | EACH A | 10 | $10.31 |
| 0520 | Clean silt trap type C | EACH A | 10 | $10.31 |
| 0530 | Staking | LS A | 1 | $30,000 |
| 0540 | Staking | LS A | 1 | $20,000 |
| 0550 | Staking | LS A | 1 | $20,000 |
| 0560 | Temp signal | LS A | 1 | $18,454 |
| 0570 | Temp signal | LS A | 1 | $9,958.76 |
| 0580 | Erosion control blanket | SQYD A | 753 | $4.02 |
| 0590 | Temp mulch | SQYD A | 33,025 | $0.49 |
| 0600 | Temp seeding and protection | SQYD A | 24,769 | $0.52 |
| 0610 | Initial fertilizer | TON A | 1 | $1,030.93 |
| 0620 | Maintenance fertilizer | TON A | 1 | $1,030.93 |
| 0630 | Seeding and protection | SQYD A | 21,506 | $0.99 |
| 0640 | Agricultural limestone | TON A | 13 | $77.32 |
| 0650 | SBM alum sheet signs .125 in | SQFT A | 23 | $61.86 |
| 0660 | Steel post type 1 | LF A | 45 | $61.86 |
| 0670 | Pave striping-temp paint-4 in | LF A | 55,475 | $0.19 |
| 0680 | Pave striping-perm paint-4 in | LF A | 7,056 | $0.23 |
| 0690 | Pave striping-thermo-6 in W | LF A | 9,423 | $1.08 |
| 0700 | Pave striping-thermo-6 in Y | LF A | 13,514 | $1.08 |
| 0710 | Pave striping-temp rem tape-B | LF A | 590 | $3.09 |
| 0720 | Pave striping-temp rem tape-W | LF A | 420 | $2.84 |
| 0730 | Pave striping-temp rem tape-Y | LF A | 380 | $2.84 |
| 0740 | Pave marking-thermo stop bar-24IN | LF A | 40 | $14.43 |
| 0750 | Pave marking-thermo curv arrow | EACH A | 8 | $128.87 |
| 0760 | Inlaid pavement marker-by | EACH A | 78 | $41.24 |
| 0770 | Fuel adjustment | DOLL A | 21,481 | $1.00 |
| 0780 | Asphalt adjustment | DOLL A | 39,687 | $1.00 |
| 0790 | Joint adhesive | LF A | 6,736 | $0.93 |
| 0800 | Centerline rumble strips | LF A | 915 | $2.06 |
| 0810 | Sawcut pavement | LF A | 134 | $4.12 |
| 0820 | Remove-store and reinstall sign | EACH A | 2 | $1,030.93 |
| 0830 | Remove sign | EACH A | 4 | $103.09 |
| 0840 | Concrete wedge curb | LF A | 428 | $51.55 |
| 0850 | Pave mark temp paint stop bar-24 in | LF A | 40 | $10.31 |
| 0860 | Barcode sign inventory | EACH A | 6 | $51.55 |
| 0870 | Remove pavement marker | EACH A | 10 | $100.00 |
| 0880 | Entrance pipe-15 in | LF A | 414 | $61.86 |
| 0890 | Culvert pipe-15 in | LF A | 77 | $82.47 |
| 0900 | Culvert pipe-18 in | LF A | 233 | $82.47 |
| 0910 | Pipe culvert headwall-15 in | EACH A | 2 | $1,443.30 |
| 0920 | Pipe culvert headwall-18 in | EACH A | 3 | $1,546.39 |
| 0930 | Drop box inlet type 1 | EACH A | 1 | $4,123.71 |
| 0940 | Fabric-geotextile class 2 for pipe | SQYD A | 457 | $2.00 |
| 0950 | Temporary pipe | LF A | 355 | $46.39 |
| 0960 | W encasement steel open cut range 3 | LF A | 380 | $257.73 |
| 0970 | W fire hydrant remove | EACH A | 2 | $721.65 |
| 0980 | W flush hydrant assembly | EACH A | 2 | $8,247.43 |
| 0990 | W meter 3/4 inch | EACH A | 3 | $1,855.67 |
| 1000 | W meter adjust | EACH A | 6 | $412.37 |
| 1010 | W pipe PVC 06 inch | LF A | 1,770 | $35.05 |
| 1020 | W serv PE/PLST long side 3/4 in | EACH A | 2 | $1,855.67 |
| 1030 | W serv PE/PLST short side 3/4 in | EACH A | 6 | $1,288.66 |
| 1040 | W tie-in 06 inch | EACH A | 2 | $3,608.25 |
| 1050 | W valve 06 inch | EACH A | 3 | $2,268.04 |
| 1060 | W line marker | EACH A | 5 | $103.09 |
| 1070 | W meter remove | EACH A | 3 | $515.46 |
| 1080 | Mobilization | LS A | 1 | $165,000 |
| 1090 | Demobilization | LS A | 1 | $54,820 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way