KYTC contract 25-1002 bid tabulation
GRADE, DRAIN & SURFACE WITH BRIDGE NEW ROUTE- KY-54-KY-259. Let by Kentucky Transportation Cabinet on January 23, 2025, Grayson, District 4. 1 bid received; low bid $22,773,775 by Scotty'S Contracting & Stone LLC, -4.2% against the engineer's estimate of $23,761,512.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 JAN 2025
- Pay items
- 218
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $22,773,775 | Low | -4.0% |
Engineer's estimate: $23,761,512.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC |
|---|---|---|---|---|
| 0010 | Crushed stone base | TON A | 46,843 | $30.17 |
| 0020 | Lime stabilized roadbed | SQYD A | 49,911 | $11.02 |
| 0030 | Lime | TON A | 1,402 | $302.10 |
| 0040 | Crushed aggregate size no 2 | TON A | 13,182 | $29.68 |
| 0050 | Asphalt seal aggregate | TON A | 456 | $175.95 |
| 0060 | Asphalt seal coat | TON A | 63 | $900.00 |
| 0070 | Leveling & wedging PG64-22 | TON A | 738 | $111.95 |
| 0080 | CL2 asph base 1.00D PG64-22 | TON A | 9,893 | $92.95 |
| 0090 | CL3 asph base 1.00D PG76-22 | TON A | 635 | $102.95 |
| 0100 | CL2 asph base 0.75D PG64-22 | TON A | 6,861 | $95.80 |
| 0110 | CL2 asph surf 0.38D PG64-22 | TON A | 4,813 | $107.90 |
| 0120 | CL2 asph surf 0.38B PG64-22 | TON A | 1,313 | $113.85 |
| 0130 | Asphalt material for tack | TON A | 70 | $720.10 |
| 0140 | Asphalt curing seal | TON A | 51 | $850.00 |
| 0150 | CL3 asph surf 0.38B PG76-22 | TON A | 317 | $150.80 |
| 0160 | JPC pavement-8 in | SQYD A | 825 | $131.21 |
| 0170 | Fabric-geotextile class 1 | SQYD A | 14,917 | $2.28 |
| 0180 | Fabric-geotextile class 1A | SQYD A | 17,302 | $4.46 |
| 0190 | Sand for blotter | TON A | 126 | $35.89 |
| 0200 | Concrete-class A | CUYD A | 221 | $566.10 |
| 0210 | Joint adhesive | LF A | 39,397 | $0.42 |
| 0220 | Perforated pipe-4 in | LF A | 1,476 | $16.73 |
| 0230 | Non-perforated pipe-4 in | LF A | 1,039 | $14.74 |
| 0240 | Perf pipe headwall TY 1-4 in | EACH A | 3 | $1,059.73 |
| 0250 | Perf pipe headwall TY 2-4 in | EACH A | 8 | $1,059.73 |
| 0260 | Perf pipe headwall TY 3-4 in | EACH A | 13 | $1,059.73 |
| 0270 | Flume inlet type 2 | EACH A | 3 | $5,258.54 |
| 0280 | Cored hole drainage box con-4 in | EACH A | 7 | $1,545.00 |
| 0290 | Standard curb and gutter | LF A | 1,872 | $32.49 |
| 0300 | Lip curb and gutter | LF A | 895 | $40.58 |
| 0310 | Standard header curb | LF A | 1,597 | $36.05 |
| 0320 | Island header curb type 2 | LF A | 1,082 | $26.41 |
| 0330 | Delineator for guardrail mono directional white | EACH A | 49 | $14.73 |
| 0340 | Barricade-type III | EACH A | 31 | $144.11 |
| 0350 | Remove pavement | SQYD A | 2,667 | $7.45 |
| 0360 | Temp ditch | LF A | 10,890 | $2.31 |
| 0370 | Clean temp ditch | LF A | 5,445 | $0.54 |
| 0380 | Granular embankment | CUYD A | 20,222 | $39.62 |
| 0390 | Embankment in place | CUYD A | 350,460 | $11.68 |
| 0400 | Water | MGAL A | 820 | $0.01 |
| 0410 | Fence-woven wire type 1 | LF A | 11,203 | $7.10 |
| 0420 | Fence-6 FT chain link | LF A | 171 | $47.52 |
| 0430 | Double vehicular chain link gate | EACH A | 2 | $5,983.67 |
| 0440 | Guardrail terminal section no 1 | EACH A | 6 | $86.22 |
| 0450 | Remove guardrail | LF A | 1,106 | $2.79 |
| 0460 | Guardrail end treatment type 4A | EACH A | 10 | $3,915.85 |
| 0470 | Temp guardrail | LF A | 2,062.50 | $14.67 |
| 0480 | Right-of-way monument type 1 | EACH A | 104 | $246.13 |
| 0490 | Witness post | EACH A | 3 | $163.63 |
| 0500 | Channel lining class II | TON A | 8,655 | $51.07 |
| 0510 | Channel lining class III | TON A | 1,964 | $50.78 |
| 0520 | Clearing and grubbing | LS A | 1 | $1,144,716 |
| 0530 | Concrete-class B | CUYD A | 25 | $1,376.64 |
| 0540 | Temporary signs | SQFT A | 770 | $6.51 |
| 0550 | Edge key | LF A | 496 | $21.95 |
| 0560 | Fabric-geotextile class 2 | SQYD A | 14,000 | $2.04 |
| 0570 | Fabric-geotextile class 2 for pipe | SQYD A | 9,543 | $2.00 |
| 0580 | Maintain & control traffic | LS A | 1 | $341,356 |
| 0590 | Diversions (by-pass detours) | LS A | 1 | $22,186 |
| 0600 | Diversions (by-pass detours) | LS A | 1 | $50,517 |
| 0610 | Portable changeable message sign | EACH A | 6 | $10,750 |
| 0620 | Safeloading | CUYD A | 42 | $412.00 |
| 0630 | Edgeline rumble strips | LF A | 19,112 | $0.35 |
| 0640 | Temp silt fence | LF A | 10,890 | $4.71 |
| 0650 | Silt trap type A | EACH A | 70 | $348.69 |
| 0660 | Silt trap type B | EACH A | 70 | $348.69 |
| 0670 | Silt trap type C | EACH A | 70 | $348.69 |
| 0680 | Clean silt trap type A | EACH A | 70 | $0.01 |
| 0690 | Clean silt trap type B | EACH A | 70 | $0.01 |
| 0700 | Clean silt trap type C | EACH A | 70 | $0.01 |
| 0710 | Sidewalk-4 in concrete | SQYD A | 780 | $57.19 |
| 0720 | Staking | LS A | 1 | $282,852 |
| 0730 | Erosion control blanket | SQYD A | 16,962 | $1.85 |
| 0740 | Temp mulch | SQYD A | 223,808 | $0.36 |
| 0750 | Temp seeding and protection | SQYD A | 167,856 | $0.48 |
| 0760 | Initial fertilizer | TON A | 8.20 | $1,390.50 |
| 0770 | Maintenance fertilizer | TON A | 13.70 | $1,390.50 |
| 0780 | Seeding and protection | SQYD A | 264,652 | $0.46 |
| 0790 | Sodding | SQYD A | 696 | $8.24 |
| 0800 | Agricultural limestone | TON A | 164 | $87.55 |
| 0810 | Pave striping-temp paint-4 in | LF A | 17,200 | $0.32 |
| 0820 | Pave striping-perm paint-4 in | LF A | 19,001 | $0.33 |
| 0830 | Pave striping-thermo-6 in W | LF A | 23,437 | $1.39 |
| 0840 | Pave striping-thermo-6 in Y | LF A | 28,114 | $1.39 |
| 0850 | Pave marking-thermo stop bar-24IN | LF A | 264 | $15.45 |
| 0860 | Pave marking-thermo cross-hatch | SQFT A | 1,896 | $7.21 |
| 0870 | Pave marking-thermo curv arrow | EACH A | 42 | $154.50 |
| 0880 | Fuel adjustment | DOLL A | 185,590 | $1.00 |
| 0890 | Asphalt adjustment | DOLL A | 95,293 | $1.00 |
| 0900 | Object marker TY 3 | EACH A | 10 | $45.42 |
| 0910 | Centerline rumble strips | LF A | 8,874 | $0.31 |
| 0920 | Thrie beam to W beam connector | EACH A | 4 | $3,063.23 |
| 0930 | Longitudinal edge key | LF A | 2,780 | $5.40 |
| 0940 | G/R steel W beam-S face (7 FT post) | LF A | 4,762.50 | $30.01 |
| 0950 | Pave marking-thermo yield bar-36 in | LF A | 60 | $25.75 |
| 0960 | Detectable warnings | SQFT A | 102 | $46.68 |
| 0970 | Drain pond | LS A | 1 | $30,815 |
| 0980 | Drain pond | LS A | 1 | $30,815 |
| 0990 | Channel lining class III-mod | TON A | 1,887 | $97.02 |
| 1000 | R/W monument type 3 | EACH A | 85 | $246.13 |
| 1010 | Pave marking-thermo dotted lane exten | LF A | 40 | $10.30 |
| 1015 | Electronic delivery MGMT system | LS A | 1 | $1.00 |
| 1020 | Railroad flagger | DAY A | 20 | $1,500.00 |
| 1030 | Entrance pipe-15 in | LF A | 1,195 | $69.34 |
| 1040 | Entrance pipe-18 in | LF A | 340 | $82.21 |
| 1050 | Entrance pipe-24 in | LF A | 188 | $107.07 |
| 1060 | Culvert pipe-18 in | LF A | 578 | $126.73 |
| 1070 | Culvert pipe-30 in | LF A | 613 | $211.31 |
| 1080 | Culvert pipe-36 in | LF A | 1,080 | $206.88 |
| 1090 | Culvert pipe-42 in | LF A | 367 | $268.57 |
| 1100 | Culvert pipe-48 in | LF A | 289 | $315.99 |
| 1110 | Storm sewer pipe-15 in | LF A | 369 | $116.18 |
| 1120 | Storm sewer pipe-18 in | LF A | 597 | $132.66 |
| 1130 | Storm sewer pipe-24 in | LF A | 187 | $150.31 |
| 1140 | Pipe culvert headwall-18 in | EACH A | 2 | $1,854.00 |
| 1150 | Pipe culvert headwall-30 in | EACH A | 5 | $3,090.00 |
| 1160 | Pipe culvert headwall-36 in | EACH A | 8 | $3,296.00 |
| 1170 | Pipe culvert headwall-42 in | EACH A | 4 | $4,944.00 |
| 1180 | Pipe culvert headwall-48 in | EACH A | 4 | $5,356.00 |
| 1190 | S & F box inlet-outlet-18 in | EACH A | 13 | $4,120.00 |
| 1200 | S & F box inlet-outlet-30 in | EACH A | 3 | $12,360 |
| 1210 | Curb box inlet type A | EACH A | 9 | $7,725.00 |
| 1220 | Drop box inlet type 1 | EACH A | 4 | $5,974.00 |
| 1230 | Drop box inlet type 13S | EACH A | 1 | $12,360 |
| 1240 | Drop box inlet type 14 | EACH A | 2 | $3,090.00 |
| 1250 | Cap curb box inlet | EACH A | 1 | $1,030.00 |
| 1260 | Manhole type A | EACH A | 2 | $4,120.00 |
| 1270 | Manhole type B mod | EACH A | 1 | $14,420 |
| 1275 | Concrete-class A | CUYD A | 1.07 | $7,233.71 |
| 1280 | Cored hole drainage box con- 18 in | EACH A | 1 | $1,545.00 |
| 1290 | Bore and jack pipe-18 in | LF A | 103 | $865.74 |
| 1300 | Cored hole drainage box con | EACH A | 1 | $1,545.00 |
| 1310 | Pipeline inspection | LF A | 5,524 | $2.42 |
| 1320 | Structure granular backfill | CUYD A | 1,557 | $47.55 |
| 1330 | Handrail-type A-2 | LF A | 71.33 | $113.75 |
| 1340 | Masonry coating | SQYD A | 449 | $20.51 |
| 1350 | Structure excav-solid rock | CUYD A | 489 | $83.36 |
| 1360 | Foundation preparation | LS A | 1 | $82,423 |
| 1370 | Concrete-class AA | CUYD A | 1,056.40 | $766.65 |
| 1380 | Concrete-class aaa | CUYD A | 59.70 | $2,079.95 |
| 1390 | Steel reinforcement | LB A | 135,813 | $1.39 |
| 1400 | Steel reinforcement-epoxy coated | LB A | 8,935 | $1.49 |
| 1410 | Structural steel | LS A | 1 | $679,007 |
| 1420 | Deck waterproofing | LS A | 1 | $88,300 |
| 1430 | Deck drain system | LS A | 1 | $51,158 |
| 1440 | Rail system single slope - 40 in | LF A | 65.20 | $256.90 |
| 1450 | Foundation preparation | LS A | 1 | $16,980 |
| 1460 | Concrete-class A | CUYD A | 208.10 | $575.00 |
| 1470 | Steel reinforcement | LB A | 27,693 | $1.40 |
| 1480 | G directional bore | LF A | 245 | $329.60 |
| 1490 | G encasement steel open cut range 1 | LF A | 228 | $247.20 |
| 1500 | G encasement steel open cut range 2 | LF A | 1,243 | $206.00 |
| 1510 | G encasement steel open cut range 3 | LF A | 185 | $247.20 |
| 1520 | G pipe polyethylene/plastic 02 inch | LF A | 4,575 | $57.68 |
| 1530 | G pipe polyethylene/plastic 04 inch | LF A | 4,205 | $63.86 |
| 1540 | G pipe polyethylene/plastic 06 inch | LF A | 455 | $70.04 |
| 1550 | G service long side 3/4 inch | EACH A | 6 | $2,369.00 |
| 1560 | G service short side 3/4 inch | EACH A | 10 | $1,236.00 |
| 1570 | G tie-in polyethylene/plastic 02 inch | EACH A | 9 | $2,472.00 |
| 1580 | G tie-in polyethylene/plastic 04 inch | EACH A | 3 | $3,296.00 |
| 1590 | G tie-in polyethylene/plastic 06 inch | EACH A | 4 | $3,914.00 |
| 1600 | G valve polyethylene/plastic 02 inch | EACH A | 16 | $875.50 |
| 1610 | G valve polyethylene/plastic 04 inch | EACH A | 6 | $1,236.00 |
| 1620 | G valve polyethylene/plastic 06 inch | EACH A | 4 | $1,545.00 |
| 1630 | G meter and regulator 2 inch | EACH A | 1 | $2,369.00 |
| 1640 | G meter and regulator 3/4 inch | EACH A | 1 | $1,442.00 |
| 1650 | G cap existing main | EACH A | 15 | $2,472.00 |
| 1660 | G service test and relight | EACH A | 16 | $412.00 |
| 1670 | S bypass pumping | EACH A | 3 | $3,605.00 |
| 1680 | S encasement steel open cut range 4 | LF A | 100 | $321.36 |
| 1690 | S force main PVC 02 inch | LF A | 265 | $82.40 |
| 1700 | S force main PVC 06 inch | LF A | 495 | $87.55 |
| 1710 | S force main tap sleeve/valve RNG 1 | EACH A | 2 | $8,961.00 |
| 1720 | S force main tie-in 02 inch | EACH A | 2 | $2,987.00 |
| 1730 | S force main valve gate | EACH A | 2 | $1,854.00 |
| 1740 | S lateral short side 06 inch | EACH A | 2 | $1,751.00 |
| 1750 | S manhole | EACH A | 11 | $7,210.00 |
| 1760 | S manhole adjust to grade | EACH A | 1 | $1,545.00 |
| 1770 | S manhole tap existing | EACH A | 1 | $5,047.00 |
| 1780 | S pipe PVC 08 inch | LF A | 1,160 | $164.80 |
| 1790 | S cap existing main | EACH A | 8 | $2,266.00 |
| 1800 | Pole 40 FT MTG HT | EACH A | 12 | $2,060.00 |
| 1810 | Bracket 12 FT | EACH A | 8 | $540.75 |
| 1820 | Bracket 15 FT | EACH A | 4 | $592.25 |
| 1830 | Pole base | EACH A | 12 | $2,575.00 |
| 1840 | Transformer base | EACH A | 12 | $515.00 |
| 1850 | Lighting control equipment | EACH A | 1 | $23,807 |
| 1860 | Fused connector kit | EACH A | 24 | $257.50 |
| 1870 | Trenching and backfilling | LF A | 1,950 | $11.33 |
| 1880 | Wire-no. 12 | LF A | 2,050 | $0.18 |
| 1890 | Electrical junction box type A | EACH A | 5 | $2,575.00 |
| 1900 | Bore and jack conduit | LF A | 480 | $13.90 |
| 1910 | Wire-no. 10 | LF A | 8,700 | $1.09 |
| 1920 | LED luminaire | EACH A | 12 | $1,545.00 |
| 1930 | PVC conduit-1 1/4 in-schedule 80 | LF A | 1,705 | $1.33 |
| 1940 | PVC conduit-2 in-schedule 80 | LF A | 700 | $2.04 |
| 1950 | W cap existing main | EACH A | 9 | $3,296.00 |
| 1960 | W encasement steel open cut range 3 | LF A | 640 | $283.25 |
| 1970 | W fire hydrant assembly | EACH A | 2 | $10,300 |
| 1980 | W fire hydrant remove | EACH A | 2 | $2,163.00 |
| 1990 | W meter 3/4 inch | EACH A | 4 | $2,987.00 |
| 2000 | W pipe PVC 06 inch | LF A | 2,350 | $87.55 |
| 2010 | W pipe PVC 08 inch | LF A | 500 | $92.70 |
| 2020 | W serv PE/PLST long side 3/4 in | EACH A | 1 | $7,107.00 |
| 2030 | W serv PE/PLST short side 3/4 in | EACH A | 6 | $2,163.00 |
| 2040 | W tapping sleeve and valve size 1 | EACH A | 10 | $8,961.00 |
| 2050 | W valve 06 inch | EACH A | 3 | $2,781.00 |
| 2060 | W blowoff assembly | EACH A | 5 | $6,592.00 |
| 2070 | W cap existing main | EACH A | 1 | $3,296.00 |
| 2080 | W encasement steel bored range 4 | LF A | 35 | $757.05 |
| 2090 | W pipe PVC 08 inch | LF A | 1,731 | $92.70 |
| 2100 | W service relocate | EACH A | 2 | $5,562.00 |
| 2110 | W service special | EACH A | 1 | $7,725.00 |
| 2120 | W tapping sleeve and valve size 1 | EACH A | 1 | $8,961.00 |
| 2130 | W tie-in 08 inch | EACH A | 1 | $3,399.00 |
| 2140 | W encasement steel open cut range 4 inst | LF A | 190 | $321.36 |
| 2150 | Mobilization | LS A | 1 | $861,550 |
| 2160 | Demobilization | LS A | 1 | $328,950 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 23, 2025. Compiled by Mirage Metrics.