KYTC contract 25-1003 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE MORGANTOWN ROAD(US-231). Let by Kentucky Transportation Cabinet on January 23, 2025, Warren, District 3. 2 bids received; low bid $2,429,245 by Scotty'S Contracting & Stone LLC, -7.8% against the engineer's estimate of $2,635,942.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 JAN 2025
- Pay items
- 144
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $2,429,245 | Low | -8.0% |
| 2 | Cleary Construction Inc | $2,812,000 | +16% | +7.0% |
Engineer's estimate: $2,635,942.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A | 997 | $49.06 | $60.00 |
| 0020 | Crushed aggregate size no 2 | TON A | 1,051 | $42.44 | $55.00 |
| 0030 | Asphalt seal aggregate | TON A | 11 | $603.33 | $690.00 |
| 0040 | Asphalt seal coat | TON A | 1.30 | $1,727.37 | $2,600.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A | 694 | $138.39 | $180.00 |
| 0060 | CL3 asph surf 0.38B PG64-22 | TON A | 1,095 | $118.53 | $170.00 |
| 0070 | Fabric-geotextile class 1 | SQYD A | 1,599 | $2.68 | $2.50 |
| 0080 | Fabric-geotextile class 1A | SQYD A | 1,894 | $3.62 | $4.00 |
| 0090 | Mobilization for mill & text | LS A | 1 | $7,451.27 | $2,500.00 |
| 0100 | Asphalt pave milling & texturing | TON A | 1,249 | $45.51 | $35.00 |
| 0110 | Joint adhesive | LF A | 3,123 | $1.50 | $1.50 |
| 0120 | Longitudinal edge key | LF A | 1,144 | $16.76 | $7.00 |
| 0130 | Asphalt material for tack non-tracking | TON A | 5.40 | $791.38 | $1,000.00 |
| 0140 | Storm sewer pipe-24 in | LF A | 10 | $250.00 | $200.00 |
| 0150 | Non-perforated pipe-4 in | LF A | 13 | $50.00 | $50.00 |
| 0160 | Drop box inlet type 5D | EACH A | 1 | $7,000.00 | $10,000 |
| 0170 | Cap drop box inlet | EACH A | 1 | $1,000.00 | $2,750.00 |
| 0180 | Standard barrier median type 4 mod | SQYD A | 1,639 | $125.00 | $108.39 |
| 0190 | Conc median barrier type 12D TL3 | LF A | 588 | $130.00 | $164.92 |
| 0200 | Conc median barrier type 12E TL3 | LF A | 603 | $125.00 | $179.36 |
| 0210 | Delineator for guardrail mono directional white | EACH A | 5 | $16.19 | $17.82 |
| 0220 | Delineator for guardrail mono directional yello | EACH A | 20 | $16.19 | $17.82 |
| 0230 | Delineator for barrier - white | EACH A | 18 | $17.85 | $19.48 |
| 0240 | Delineator for barrier - yellow | EACH A | 8 | $17.85 | $19.48 |
| 0250 | Barricade-type III | EACH A | 20 | $269.21 | $100.00 |
| 0260 | Remove pavement | SQYD A | 100 | $18.06 | $12.00 |
| 0270 | Temp ditch | LF A | 394 | $0.01 | $0.50 |
| 0280 | Clean temp ditch | LF A | 197 | $0.01 | $0.01 |
| 0290 | Embankment in place | CUYD A | 3,076 | $26.23 | $70.00 |
| 0300 | Adjust guardrail | LF A | 412.50 | $8.41 | $10.79 |
| 0310 | Guardrail-steel W beam-S face | LF A | 775 | $33.31 | $36.89 |
| 0320 | Guardrail end treatment type 1 | EACH A | 1 | $3,863.84 | $4,058.88 |
| 0330 | Guardrail end treatment type 2A | EACH A | 3 | $116.17 | $1,159.51 |
| 0340 | Remove guardrail | LF A | 657 | $4.38 | $5.81 |
| 0350 | Channel lining class II | TON A | 142 | $69.95 | $90.00 |
| 0360 | Clearing and grubbing | LS A | 1 | $5,419.88 | $30,000 |
| 0370 | Temporary signs | SQFT A | 460 | $6.40 | $6.00 |
| 0380 | Fabric-geotextile class 1 | SQYD A | 287 | $2.68 | $4.09 |
| 0390 | Maintain & control traffic | LS A | 1 | $119,158 | $145,000 |
| 0400 | Portable changeable message sign | EACH A | 8 | $4,785.90 | $4,500.00 |
| 0410 | Shoulder rumble strips | LF A | 2,850 | $1.25 | $1.85 |
| 0420 | Temp silt fence | LF A | 394 | $2.77 | $2.50 |
| 0430 | Silt trap type A | EACH A | 3 | $312.93 | $375.00 |
| 0440 | Silt trap type B | EACH A | 3 | $248.42 | $250.00 |
| 0450 | Silt trap type C | EACH A | 3 | $255.38 | $350.00 |
| 0460 | Clean silt trap type A | EACH A | 3 | $53.76 | $0.01 |
| 0470 | Clean silt trap type B | EACH A | 3 | $110.74 | $0.01 |
| 0480 | Clean silt trap type C | EACH A | 3 | $110.74 | $0.01 |
| 0490 | Sidewalk-4 in concrete | SQYD A | 682 | $90.00 | $63.35 |
| 0500 | Staking | LS A | 1 | $23,437 | $65,000 |
| 0510 | Arrow panel | EACH A | 2 | $1,914.36 | $3,000.00 |
| 0520 | Conc barrier wall type 9T | LF A | 80 | $161.61 | $90.00 |
| 0530 | Erosion control blanket | SQYD A | 1,068 | $2.00 | $3.90 |
| 0540 | Temp mulch | SQYD A | 7,640 | $0.30 | $0.48 |
| 0550 | Temp seeding and protection | SQYD A | 5,730 | $0.40 | $0.50 |
| 0560 | Initial fertilizer | TON A | 0.60 | $1,500.00 | $1,350.00 |
| 0570 | Maintenance fertilizer | TON A | 0.40 | $1,500.00 | $1,350.00 |
| 0580 | Seeding and protection | SQYD A | 10,171 | $0.85 | $0.90 |
| 0590 | Agricultural limestone | TON A | 7 | $95.00 | $103.70 |
| 0600 | Flexible delineator post-M/W | EACH A | 5 | $85.19 | $98.19 |
| 0610 | Pave striping-temp paint-4 in | LF A | 24,600 | $0.31 | $0.31 |
| 0620 | Pave striping-thermo-6 in W | LF A | 3,847 | $1.35 | $1.35 |
| 0630 | Pave striping-thermo-6 in Y | LF A | 3,159 | $1.35 | $1.35 |
| 0640 | Pave striping-thermo-12 in W | LF A | 515 | $4.00 | $4.00 |
| 0650 | Pave striping-thermo-12 in Y | LF A | 43 | $4.00 | $4.00 |
| 0660 | Pave striping-temp rem tape-B | LF A | 3,000 | $2.00 | $2.00 |
| 0670 | Pave striping-temp rem tape-W | LF A | 6,202 | $1.85 | $1.85 |
| 0680 | Pave striping-temp rem tape-Y | LF A | 2,836 | $1.85 | $1.85 |
| 0690 | Pave striping-dur TY 1-6 in W | LF A | 735 | $6.00 | $6.00 |
| 0700 | Pave striping-dur TY 1-6 in Y | LF A | 589 | $6.00 | $6.00 |
| 0710 | Pave marking-thermo X-walk-12 in | LF A | 1,131 | $7.00 | $7.00 |
| 0720 | Pave marking-thermo stop bar-24IN | LF A | 244 | $15.00 | $15.00 |
| 0730 | Pave marking-thermo cross-hatch | SQFT A | 485 | $7.00 | $7.00 |
| 0740 | Pave marking-thermo STR arrow | EACH A | 25 | $150.00 | $150.00 |
| 0750 | Pave marking-thermo curv arrow | EACH A | 8 | $150.00 | $150.00 |
| 0760 | Pave marking-thermo comb arrow | EACH A | 10 | $275.00 | $275.00 |
| 0770 | Pave marking-thermo merge arrow | EACH A | 1 | $500.00 | $500.00 |
| 0780 | Pavement marker TY iva-MW temp | EACH A | 182 | $6.50 | $6.50 |
| 0790 | Pavement marker TY iva-MY temp | EACH A | 182 | $6.50 | $6.50 |
| 0800 | Inlaid pavement marker-MW | EACH A | 65 | $30.00 | $30.00 |
| 0810 | Inlaid pavement marker-MY | EACH A | 20 | $30.00 | $30.00 |
| 0820 | Inlaid pavement marker-by | EACH A | 8 | $30.00 | $30.00 |
| 0830 | Inlaid pavement marker-B W/R | EACH A | 11 | $30.00 | $30.00 |
| 0840 | Inlaid pavement marker-B Y/R | EACH A | 7 | $30.00 | $30.00 |
| 0850 | Crash cushion TY VI class BT TL2 | EACH A | 2 | $6,348.44 | $6,836.03 |
| 0860 | Pave mark temp paint line arrow | EACH A | 26 | $50.00 | $50.00 |
| 0870 | Object marker TY 3 | EACH A | 1 | $87.38 | $89.01 |
| 0880 | Shoulder milling/trenching | SQYD A | 794 | $33.03 | $20.00 |
| 0890 | Remove and reset perf pipe headwall | EACH A | 1 | $600.00 | $1,587.57 |
| 0900 | Pave marking-thermo yield bar-36 in | LF A | 34 | $25.00 | $25.00 |
| 0910 | Pave mark temp paint stop bar-24 in | LF A | 242 | $2.50 | $2.50 |
| 0920 | Detectable warnings | SQFT A | 380 | $50.00 | $45.95 |
| 0930 | Pave mark TY 1 tape-straight arrow | EACH A | 2 | $350.00 | $350.00 |
| 0940 | Pave mark TY 1 tape-combo arrow | EACH A | 2 | $750.00 | $750.00 |
| 0950 | Concrete sealing | SQFT A | 10,262 | $3.00 | $1.28 |
| 0960 | Cored hole drainage box con | EACH A | 1 | $1,500.00 | $2,188.61 |
| 0970 | Remove thermoplastic arrows | EACH A | 2 | $500.00 | $500.00 |
| 0980 | Curb to barrier wall transition-mod | EACH A | 4 | $6,000.00 | $7,854.55 |
| 0990 | Pave marking-thermo dotted lane exten | LF A | 497 | $1.35 | $1.35 |
| 1000 | SBM aluminum panel signs | SQFT A | 560 | $38.73 | $34.64 |
| 1010 | SBM alum sheet signs .080 in | SQFT A | 143.93 | $36.77 | $44.90 |
| 1020 | SBM alum sheet signs .125 in | SQFT A | 193.50 | $40.38 | $48.51 |
| 1030 | Steel post type 1 | LF A | 586 | $32.03 | $39.90 |
| 1040 | GMSS galv steel type C | LB A | 2,338 | $7.06 | $7.50 |
| 1050 | Class A concrete for signs | CUYD A | 10.11 | $1,871.65 | $2,386.09 |
| 1060 | Steel reinforcement for signs | LB A | 440 | $2.07 | $2.22 |
| 1070 | Remove & relocate signs | EACH A | 19 | $308.39 | $373.41 |
| 1080 | Remove sign | EACH A | 18 | $92.11 | $124.62 |
| 1090 | GMSS type D | EACH A | 7 | $527.99 | $539.05 |
| 1100 | GMSS type D | EACH A | 26 | $423.23 | $455.74 |
| 1110 | Barcode sign inventory | EACH A | 61 | $46.06 | $62.31 |
| 1120 | Pole base | EACH A | 4 | $2,500.00 | $2,500.00 |
| 1130 | Fused connector kit | EACH A | 52 | $250.00 | $250.00 |
| 1140 | Conduit-2 in | LF A | 320 | $7.21 | $7.21 |
| 1150 | Conduit-3 1/2 in | LF A | 1,140 | $15.00 | $15.00 |
| 1160 | Trenching and backfilling | LF A | 330 | $15.60 | $15.60 |
| 1170 | Open cut roadway | LF A | 1,220 | $55.00 | $55.00 |
| 1180 | Cable-no. 14/7C | LF A | 17,540 | $1.11 | $1.11 |
| 1190 | Mast arm pole | EACH A | 6 | $61,211 | $61,211 |
| 1200 | Temp signal multi phase | EACH A | 1 | $45,000 | $45,000 |
| 1210 | Install pedestrian head-LED | EACH A | 12 | $600.00 | $600.00 |
| 1220 | Install LED signal-3 section | EACH A | 24 | $500.00 | $500.00 |
| 1230 | Electrical junction box type A | EACH A | 6 | $2,000.00 | $2,000.00 |
| 1240 | Electrical junction box type C | EACH A | 12 | $3,500.00 | $3,500.00 |
| 1250 | Install ped detector-audible | EACH A | 12 | $500.00 | $500.00 |
| 1260 | Install luminaire pole | EACH A | 4 | $1,000.00 | $1,000.00 |
| 1270 | Remove & reinstall coordinating unit | EACH A | 1 | $2,500.00 | $2,500.00 |
| 1280 | Traffic signal pole base | CUYD A | 16 | $300.00 | $300.00 |
| 1290 | Install signal pedestal | EACH A | 10 | $4,500.00 | $4,500.00 |
| 1300 | Install mast arm mounted sign | EACH A | 24 | $500.00 | $500.00 |
| 1310 | PVC conduit-1 1/4 in-schedule 80 | LF A | 520 | $1.29 | $1.29 |
| 1320 | PVC conduit-2 in-schedule 80 | LF A | 70 | $1.98 | $1.98 |
| 1330 | Install signal controller-TY atc | EACH A | 1 | $6,000.00 | $6,000.00 |
| 1340 | Remove signal equipment | EACH A | 1 | $15,000 | $15,000 |
| 1350 | Install radar presence detector type A | EACH A | 8 | $900.00 | $900.00 |
| 1360 | Install mast arm dampener | EACH A | 6 | $250.00 | $250.00 |
| 1370 | Conduit-3 in | LF A | 360 | $15.38 | $15.38 |
| 1380 | Trenching and backfilling | LF A | 815 | $15.60 | $15.60 |
| 1390 | Open cut roadway | LF A | 95 | $55.00 | $55.00 |
| 1400 | Remove lighting | LS A | 1 | $12,000 | $12,000 |
| 1410 | Electrical junction box type A | EACH A | 3 | $2,000.00 | $2,000.00 |
| 1420 | Cable-no. 10/3C ducted | LF A | 1,265 | $4.14 | $4.14 |
| 1430 | Mobilization | LS A | 1 | $79,319 | $130,000 |
| 1440 | Demobilization | LS A | 1 | $34,776 | $41,444 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.