KYTC contract 25-1006 bid tabulation
WIDENING BETHEL GROVE-BETHEL CHURCH ROAD(KY-56). Let by Kentucky Transportation Cabinet on March 20, 2025, Mclean, District 2. 3 bids received; low bid $1,338,618 by Scotty'S Contracting & Stone LLC, -40% against the engineer's estimate of $2,239,704.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 MAR 2025
- Pay items
- 75
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $1,338,618 | Low | -40% |
| 2 | Envision Contractors LLC | $2,172,603 | +62% | -3.0% |
| 3 | Cleary Construction Inc | $2,275,000 | +70% | +2.0% |
Engineer's estimate: $2,239,704.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Envision Contractors LLC | 3. Cleary Construction Inc |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A | 1,705 | $36.89 | $48.59 | $58.65 |
| 0020 | Crushed aggregate size no 2 | TON A | 2,957 | $39.81 | $46.52 | $51.00 |
| 0030 | Asphalt seal aggregate | TON A | 28 | $197.01 | $350.00 | $350.00 |
| 0040 | Asphalt seal coat | TON A | 5 | $891.11 | $1,000.00 | $1,000.00 |
| 0050 | Leveling & wedging PG64-22 | TON A | 19 | $166.78 | $185.00 | $185.00 |
| 0060 | CL2 asph base 0.75D PG64-22 | TON A | 1,119 | $114.75 | $156.20 | $153.85 |
| 0070 | CL2 asph surf 0.50D PG64-22 | TON A | 482 | $115.28 | $161.79 | $158.65 |
| 0080 | Asphalt material for tack | TON A | 7 | $696.19 | $200.00 | $200.00 |
| 0090 | Joint adhesive | LF A | 3,200 | $1.50 | $1.50 | $1.50 |
| 0100 | Perforated pipe-4 in | LF A | 54 | $7.72 | $72.40 | $30.00 |
| 0110 | Non-perforated pipe-4 in | LF A | 20 | $15.96 | $73.27 | $38.00 |
| 0120 | Perf pipe headwall TY 3-4 in | EACH A | 2 | $466.69 | $1,328.36 | $1,300.00 |
| 0130 | Remove pavement | SQYD A | 45 | $16.31 | $15.68 | $85.00 |
| 0140 | Temp ditch | LF A | 750 | $0.01 | $1.93 | $1.00 |
| 0150 | Clean temp ditch | LF A | 375 | $0.01 | $0.97 | $0.01 |
| 0160 | Roadway excavation | CUYD A | 30,520 | $10.38 | $22.88 | $29.00 |
| 0170 | Water | MGAL A | 60 | $0.01 | $150.00 | $0.01 |
| 0180 | Right-of-way monument type 1 | EACH A | 12 | $225.75 | $158.02 | $160.00 |
| 0190 | Witness post | EACH A | 3 | $134.38 | $131.00 | $125.00 |
| 0200 | Plug water well | EACH A | 1 | $8,500.00 | $3,500.00 | $5,000.00 |
| 0210 | Channel lining class II | TON A | 255 | $56.02 | $60.64 | $88.00 |
| 0220 | Clearing and grubbing | LS A | 1 | $23,983 | $180,500 | $54,000 |
| 0230 | Temporary signs | SQFT A | 150 | $6.38 | $33.21 | $15.00 |
| 0240 | Edge key | LF A | 62 | $28.85 | $63.75 | $63.75 |
| 0250 | Fabric-geotextile class 1 | SQYD A | 4,032 | $2.52 | $2.85 | $3.00 |
| 0260 | Fabric-geotextile class 1A | SQYD A | 4,032 | $3.65 | $4.68 | $4.25 |
| 0270 | Fabric-geotextile class 2 for pipe | SQYD A | 363 | $2.00 | $2.00 | $2.00 |
| 0280 | Maintain & control traffic | LS A | 1 | $18,977 | $154,833 | $135,000 |
| 0290 | Portable changeable message sign | EACH A | 2 | $4,442.34 | $6,283.03 | $4,500.00 |
| 0300 | Safeloading | CUYD A | 8.25 | $344.33 | $500.00 | $400.00 |
| 0310 | Edgeline rumble strips | LF A | 2,867 | $1.75 | $1.85 | $1.75 |
| 0320 | Temp silt fence | LF A | 750 | $1.82 | $10.52 | $3.00 |
| 0330 | Silt trap type A | EACH A | 3 | $0.01 | $451.52 | $300.00 |
| 0340 | Silt trap type B | EACH A | 3 | $492.89 | $454.56 | $160.00 |
| 0350 | Silt trap type C | EACH A | 3 | $0.01 | $242.85 | $285.00 |
| 0360 | Clean silt trap type A | EACH A | 3 | $0.01 | $144.76 | $1.00 |
| 0370 | Clean silt trap type B | EACH A | 3 | $129.00 | $144.76 | $1.00 |
| 0380 | Clean silt trap type C | EACH A | 3 | $0.01 | $154.52 | $1.00 |
| 0390 | Staking | LS A | 1 | $13,254 | $21,528 | $65,000 |
| 0400 | Erosion control blanket | SQYD A | 1,242 | $1.85 | $2.71 | $1.85 |
| 0410 | Temp mulch | SQYD A | 9,200 | $0.25 | $0.39 | $0.25 |
| 0420 | Temp seeding and protection | SQYD A | 6,900 | $0.35 | $0.41 | $0.35 |
| 0430 | Initial fertilizer | TON A | 0.60 | $1,500.00 | $1,231.50 | $1,500.00 |
| 0440 | Maintenance fertilizer | TON A | 1.10 | $1,500.00 | $1,231.50 | $1,500.00 |
| 0450 | Seeding and protection | SQYD A | 20,300 | $0.40 | $0.71 | $0.40 |
| 0460 | Agricultural limestone | TON A | 9 | $85.00 | $71.23 | $85.00 |
| 0470 | Pave striping-temp paint-4 in | LF A | 1,535 | $0.50 | $0.50 | $0.50 |
| 0480 | Pave striping-perm paint-6 in | LF A | 5,129 | $0.40 | $0.40 | $0.40 |
| 0490 | Pave marking-thermo stop bar-24IN | LF A | 9 | $20.00 | $20.00 | $20.00 |
| 0500 | Fuel adjustment | DOLL A | 4,945 | $1.00 | $1.00 | $1.00 |
| 0510 | Joint adhesive | LF A | 3,200 | $1.50 | $1.50 | $1.50 |
| 0520 | Temporary pipe | LF A | 100 | $73.90 | $132.79 | $100.00 |
| 0530 | Centerline rumble strips | LF A | 1,500 | $2.25 | $2.35 | $2.25 |
| 0540 | Remove-store and reinstall sign | EACH A | 17 | $134.38 | $564.92 | $350.00 |
| 0550 | Longitudinal edge key | LF A | 330 | $25.70 | $48.75 | $48.75 |
| 0560 | Entrance pipe-18 in | LF A | 236 | $80.49 | $144.73 | $110.00 |
| 0570 | Sloped and mitered headwall-18 in | EACH A | 10 | $2,800.00 | $2,800.00 | $3,500.00 |
| 0580 | Remove concrete masonry | CUYD A | 1 | $350.00 | $350.00 | $8,500.00 |
| 0590 | Structure excav-solid rock | CUYD A | 13 | $350.00 | $350.00 | $550.00 |
| 0600 | Foundation preparation | LS A | 1 | $6,000.00 | $6,000.00 | $20,000 |
| 0610 | Concrete-class A | CUYD A | 37.10 | $1,700.00 | $1,700.00 | $1,700.00 |
| 0620 | Steel reinforcement | LB A | 3,695 | $1.75 | $1.75 | $4.00 |
| 0630 | Safeloading | CUYD A | 1.25 | $100.00 | $1,533.51 | $2,000.00 |
| 0640 | W air release valve 1 inch | EACH A | 1 | $6,000.00 | $6,353.30 | $6,206.00 |
| 0650 | W cap existing main | EACH A | 4 | $3,000.00 | $933.15 | $1,200.00 |
| 0660 | W directional bore | LF A | 150 | $435.00 | $160.10 | $300.00 |
| 0670 | W flush hydrant assembly | EACH A | 1 | $12,000 | $8,926.16 | $13,303 |
| 0680 | W pipe PVC 06 inch | LF A | 885 | $118.00 | $73.11 | $86.50 |
| 0690 | W pipe polyethylene/plastic 06 inch | LF A | 150 | $75.00 | $104.72 | $78.00 |
| 0700 | W tie-in 06 inch | EACH A | 3 | $3,220.00 | $5,328.66 | $4,378.00 |
| 0710 | W valve 06 inch | EACH A | 4 | $2,950.00 | $3,644.59 | $2,636.00 |
| 0720 | W valve special | EACH A | 3 | $10,000 | $19,167 | $11,775 |
| 0730 | W valve box remove | EACH A | 3 | $100.00 | $726.43 | $500.00 |
| 0740 | W encasement steel open cut range 3 inst | LF A | 70 | $550.00 | $451.63 | $250.00 |
| 0750 | Demobilization | LS A | 1 | $20,103 | $32,292 | $35,577 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.