KYTC contract 25-1022 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY-461. Let by Kentucky Transportation Cabinet on August 21, 2025. 2 bids received; low bid $35,987,097 by L-M Asphalt Partners LTD D/B/A Ats Construction, +0.8% against the engineer's estimate of $35,694,220.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 AUG 2025
- Pay items
- 330
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $35,987,097 | Low | +1.0% |
| 2 | Louisville Paving Company Inc | $44,522,566 | +24% | +25% |
Engineer's estimate: $35,694,220.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L-M Asphalt Partners LTD D/B/A Ats Construction | 2. Louisville Paving Company Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 79,307 | $30.00 | $27.00 |
| 0020 | Traffic bound base | TON A A | 638 | $37.00 | $75.00 |
| 0030 | Asphalt seal aggregate | TON A A | 288 | $105.00 | $31.09 |
| 0040 | Asphalt seal coat | TON A A | 35 | $960.00 | $950.00 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 6,194 | $95.00 | $115.00 |
| 0060 | CL4 asph base 1.50D PG76-22 | TON A A | 827 | $102.00 | $120.00 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 6,150 | $82.00 | $106.00 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 36,463 | $85.00 | $108.00 |
| 0090 | CL4 asph base 1.00D PG76-22 | TON A A | 589 | $100.00 | $120.00 |
| 0100 | CL2 asph surf 0.38D PG64-22 | TON A A | 2,664 | $101.00 | $115.00 |
| 0110 | CL2 asph surf 0.38B PG64-22 | TON A A | 171 | $125.00 | $140.00 |
| 0120 | CL4 asph surf 0.38A PG76-22 | TON A A | 225 | $145.00 | $171.00 |
| 0130 | Asphalt material for tack | TON A A | 68 | $10.00 | $1.00 |
| 0140 | CL3 asph surf 0.38B PG64-22 | TON A A | 14,263 | $105.00 | $118.00 |
| 0150 | JPC pavement-8 in | SQYD A A | 324 | $150.00 | $104.88 |
| 0160 | Cem conc ent pavement-8 in | SQYD A A | 2,900 | $95.18 | $95.18 |
| 0170 | Mobilization for mill & text | LS A A | 1 | $0.01 | $3,500.00 |
| 0180 | Asphalt pave milling & texturing | TON A A | 1,916 | $15.00 | $50.00 |
| 0185 | Asphalt material for tack non-tracking | TON A A | 27.12 | $0.01 | $1.00 |
| 0190 | Crushed aggregate size no 57 | TON A A | 933 | $35.00 | $45.00 |
| 0200 | Crushed aggregate size no 2 | TON A A | 11 | $40.00 | $75.00 |
| 0210 | Perforated pipe-4 in | LF A A | 11,242 | $18.28 | $31.34 |
| 0220 | Non-perforated pipe-4 in | LF A A | 407 | $26.32 | $40.12 |
| 0230 | Perf pipe headwall TY 1-4 in | EACH A A | 5 | $700.00 | $991.43 |
| 0240 | Perf pipe headwall TY 3-4 in | EACH A A | 1 | $700.00 | $991.43 |
| 0250 | Perf pipe headwall TY 4-4 in | EACH A A | 4 | $700.00 | $991.43 |
| 0260 | Standard curb and gutter | LF A A | 9,308 | $30.54 | $31.98 |
| 0270 | Standard header curb | LF A A | 3,950 | $22.97 | $40.54 |
| 0280 | Island header curb type 2 | LF A A | 783 | $26.57 | $44.14 |
| 0290 | Mountable median type 3 | SQYD A A | 2,195 | $74.95 | $82.93 |
| 0300 | Delineator for guardrail mono directional white | EACH A A | 178 | $13.00 | $15.68 |
| 0310 | Install temp conc med barr | LF A A | 1,455 | $15.00 | $11.94 |
| 0320 | Barricade-type III | EACH A A | 20 | $0.01 | $100.00 |
| 0330 | Remove pavement | SQYD A A | 4,227 | $5.00 | $7.52 |
| 0340 | Temp ditch | LF A A | 9,875 | $0.97 | $1.57 |
| 0350 | Clean temp ditch | LF A A | 6,270 | $0.01 | $1.57 |
| 0360 | Roadway excavation | CUYD A A | 422,794 | $10.75 | $21.00 |
| 0370 | Embankment in place | CUYD A A | 8,756 | $79.00 | $26.00 |
| 0380 | Water | MGAL A A | 954 | $39.52 | $0.01 |
| 0390 | Guardrail-steel W beam-S face | LF A A | 13,350 | $28.50 | $31.08 |
| 0400 | Guardrail terminal section no 1 | EACH A A | 13 | $85.00 | $87.28 |
| 0410 | Guardrail end treatment type 1 | EACH A A | 3 | $3,600.00 | $3,419.68 |
| 0420 | Guardrail end treatment type 2A | EACH A A | 2 | $2,400.00 | $1,919.20 |
| 0430 | Remove guardrail | LF A A | 13,505 | $4.50 | $3.40 |
| 0440 | Remove & reset guardrail | LF A A | 150 | $25.00 | $30.83 |
| 0450 | Guardrail end treatment type 4A | EACH A A | 6 | $3,800.00 | $3,740.20 |
| 0460 | Right-of-way monument type 1 | EACH A A | 7 | $144.09 | $161.28 |
| 0470 | Witness post | EACH A A | 7 | $115.90 | $145.26 |
| 0480 | Clean sinkhole | EACH A A | 2 | $2,000.00 | $12,791 |
| 0490 | Channel lining class II | TON A A | 1,680 | $50.00 | $65.00 |
| 0500 | Channel lining class IV | CUYD A A | 5,373 | $8.00 | $65.00 |
| 0510 | Clearing and grubbing | LS A A | 1 | $25,000 | $50,000 |
| 0520 | Clearing and grubbing | LS A A | 1 | $215,000 | $400,000 |
| 0530 | Concrete-class B | CUYD A A | 155.60 | $800.00 | $985.00 |
| 0540 | Temporary signs | SQFT A A | 1,291 | $12.72 | $5.00 |
| 0550 | Edge key | LF A A | 270 | $15.00 | $37.44 |
| 0560 | Fabric-geotextile class 2 | SQYD A A | 5,563 | $2.00 | $2.04 |
| 0570 | Maintain & control traffic | LS A A | 1 | $500,000 | $1,286,000 |
| 0580 | Maintain & control traffic | LS A A | 1 | $500,000 | $100,000 |
| 0590 | Lane closure | EACH A A | 1 | $0.01 | $1,753.43 |
| 0600 | Portable changeable message sign | EACH A A | 11 | $5,000.00 | $15,264 |
| 0610 | Shoulder rumble strips | LF A A | 24,060 | $0.30 | $0.30 |
| 0620 | Temp silt fence | LF A A | 9,875 | $1.95 | $1.95 |
| 0630 | Silt trap type A | EACH A A | 65 | $135.00 | $135.00 |
| 0640 | Silt trap type B | EACH A A | 65 | $135.00 | $135.00 |
| 0650 | Silt trap type C | EACH A A | 65 | $140.00 | $140.00 |
| 0660 | Clean silt trap type A | EACH A A | 65 | $50.00 | $135.00 |
| 0670 | Clean silt trap type B | EACH A A | 65 | $50.00 | $135.00 |
| 0680 | Clean silt trap type C | EACH A A | 65 | $50.00 | $140.00 |
| 0690 | Sidewalk-4 in concrete | SQYD A A | 7,701 | $40.00 | $61.26 |
| 0700 | Staking | LS A A | 1 | $75,000 | $300,000 |
| 0710 | Staking | LS A A | 1 | $75,000 | $75,000 |
| 0720 | Remove structure | LS A A | 1 | $125,000 | $111,000 |
| 0730 | Arrow panel | EACH A A | 2 | $0.01 | $10,176 |
| 0740 | Install temp crash cushion | EACH A A | 2 | $5,500.00 | $6,946.59 |
| 0750 | Erosion control blanket | SQYD A A | 10,120 | $2.05 | $2.05 |
| 0760 | Temp mulch | SQYD A A | 189,672 | $0.20 | $0.20 |
| 0770 | Temp seeding and protection | SQYD A A | 142,209 | $0.25 | $0.25 |
| 0780 | Initial fertilizer | TON A A | 7.30 | $850.00 | $850.00 |
| 0790 | Maintenance fertilizer | TON A A | 10.80 | $850.00 | $850.00 |
| 0800 | Seeding and protection | SQYD A A | 205,518 | $0.30 | $0.30 |
| 0810 | Sodding | SQYD A A | 4,236 | $8.25 | $8.25 |
| 0820 | Agricultural limestone | TON A A | 121 | $118.00 | $118.00 |
| 0830 | Pave striping-temp paint-6 in | LF A A | 84,503 | $0.32 | $0.32 |
| 0840 | Pave striping removal-4 in | LF A A | 55,100 | $0.50 | $0.50 |
| 0850 | Pave striping-thermo-6 in W | LF A A | 79,829 | $1.30 | $1.30 |
| 0860 | Pave striping-thermo-6 in Y | LF A A | 58,753 | $1.30 | $1.30 |
| 0870 | Pave striping-thermo-12 in W | LF A A | 1,267 | $3.00 | $3.00 |
| 0880 | Pave marking-thermo stop bar-24IN | LF A A | 571 | $12.00 | $12.00 |
| 0890 | Pave marking-thermo cross-hatch | SQFT A A | 12,557 | $4.00 | $4.00 |
| 0900 | Pave marking-thermo STR arrow | EACH A A | 33 | $100.00 | $100.00 |
| 0910 | Pave marking-thermo curv arrow | EACH A A | 117 | $120.00 | $120.00 |
| 0920 | Pave marking-thermo comb arrow | EACH A A | 14 | $140.00 | $140.00 |
| 0930 | Pave marking-thermo only | EACH A A | 9 | $300.00 | $300.00 |
| 0940 | Inlaid pavement marker-MW | EACH A A | 586 | $34.00 | $34.00 |
| 0950 | Inlaid pavement marker-by | EACH A A | 588 | $34.00 | $34.00 |
| 0960 | Steel reinforcement | LB A A | 1,916 | $1.25 | $5.37 |
| 0975 | Crash cushion TY 6 class T TL2 | EACH A A | 2 | $5,500.00 | $5,343.98 |
| 0980 | Fuel adjustment | DOLL A A | 142,703 | $1.00 | $1.00 |
| 0990 | Asphalt adjustment | DOLL A A | 273,185 | $1.00 | $1.00 |
| 1000 | Object marker TY 3 | EACH A A | 3 | $5.45 | $49.56 |
| 1010 | Temp conc med barrier | LF A A | 1,470 | $15.00 | $35.18 |
| 1020 | Sawcut pavement | LF A A | 39,624 | $2.00 | $2.00 |
| 1030 | Longitudinal edge key | LF A A | 28,965 | $1.75 | $1.75 |
| 1040 | Turf reinforcement mat 1 | SQYD A A | 833 | $10.25 | $5.45 |
| 1050 | Turf reinforcement mat 2 | SQYD A A | 319 | $14.50 | $5.45 |
| 1060 | Pave mark thermo-lane reduction arrow | EACH A A | 4 | $300.00 | $300.00 |
| 1070 | Pave striping-chevron markings | SQFT A A | 1,023 | $4.00 | $4.00 |
| 1080 | Temporary shoring | LS A A | 1 | $0.01 | $36,950 |
| 1090 | Pave marking-thermo dotted lane exten | LF A A | 457 | $7.00 | $7.00 |
| 1100 | Concrete-class A | SQYD A A | 2,982 | $47.59 | $47.59 |
| 1110 | Thrie beam guardrail transition TL-3 | EACH A A | 4 | $5,979.88 | $3,099.16 |
| 1120 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $0.01 |
| 1130 | Entrance pipe-15 in | LF A A | 160 | $75.00 | $82.00 |
| 1140 | Entrance pipe-18 in | LF A A | 226 | $80.00 | $85.00 |
| 1150 | Entrance pipe-24 in | LF A A | 214 | $93.00 | $84.00 |
| 1160 | Entrance pipe-30 in | LF A A | 66 | $100.00 | $99.00 |
| 1170 | Culvert pipe-15 in | LF A A | 24 | $95.00 | $315.00 |
| 1180 | Culvert pipe-18 in | LF A A | 228 | $90.00 | $100.00 |
| 1190 | Culvert pipe-24 in | LF A A | 122 | $114.00 | $130.00 |
| 1200 | Culvert pipe-30 in | LF A A | 189 | $144.00 | $170.00 |
| 1210 | Culvert pipe-36 in | LF A A | 26 | $225.00 | $180.00 |
| 1220 | Culvert pipe-42 in | LF A A | 79 | $255.00 | $350.00 |
| 1230 | Culvert pipe-54 in | LF A A | 89 | $430.00 | $470.00 |
| 1240 | Culvert pipe-66 in | LF A A | 45 | $400.00 | $460.00 |
| 1250 | Storm sewer pipe-15 in | LF A A | 186 | $65.00 | $100.00 |
| 1260 | Storm sewer pipe-18 in | LF A A | 4,175 | $82.00 | $110.00 |
| 1270 | Storm sewer pipe-24 in | LF A A | 1,160 | $180.00 | $135.00 |
| 1280 | Storm sewer pipe-30 in | LF A A | 1,631 | $180.00 | $190.00 |
| 1290 | Storm sewer pipe-36 in | LF A A | 342 | $200.00 | $190.00 |
| 1300 | Storm sewer pipe-42 in | LF A A | 505 | $220.00 | $260.00 |
| 1310 | Storm sewer pipe-48 in | LF A A | 439 | $280.00 | $280.00 |
| 1320 | Storm sewer pipe-72 in | LF A A | 89 | $350.00 | $500.00 |
| 1330 | Pipe culvert headwall-24 in | EACH A A | 2 | $1,500.00 | $3,100.00 |
| 1340 | Pipe culvert headwall-30 in | EACH A A | 1 | $3,800.00 | $4,500.00 |
| 1350 | Pipe culvert headwall-36 in | EACH A A | 1 | $5,000.00 | $4,500.00 |
| 1360 | Pipe culvert headwall-42 in | EACH A A | 1 | $4,000.00 | $6,000.00 |
| 1370 | Pipe culvert headwall-48 in | EACH A A | 1 | $4,500.00 | $6,000.00 |
| 1380 | Pipe culvert headwall-66 in | EACH A A | 1 | $12,000 | $15,000 |
| 1390 | Remove pipe | LF A A | 69 | $100.00 | $45.17 |
| 1400 | Metal end section TY 1-18 in | EACH A A | 2 | $2,000.00 | $2,011.13 |
| 1410 | Metal end section TY 1-24 in | EACH A A | 2 | $2,000.00 | $2,488.13 |
| 1420 | Metal end section TY 3-18 in | EACH A A | 1 | $2,000.00 | $1,465.23 |
| 1430 | Metal end section TY 3-24 in | EACH A A | 1 | $2,000.00 | $1,608.33 |
| 1440 | Sloped box outlet type 1-18 in | EACH A A | 4 | $2,000.00 | $3,000.00 |
| 1450 | S & F box inlet-outlet-18 in | EACH A A | 1 | $3,500.00 | $5,000.00 |
| 1460 | S & F box inlet-outlet-36 in | EACH A A | 1 | $8,500.00 | $15,000 |
| 1470 | Curb box inlet type A | EACH A A | 34 | $7,500.00 | $8,000.00 |
| 1480 | Curb box inlet type F | EACH A A | 1 | $5,000.00 | $5,000.00 |
| 1490 | Drop box inlet type 1 | EACH A A | 19 | $5,000.00 | $6,000.00 |
| 1500 | Drop box inlet type 3 | EACH A A | 4 | $5,000.00 | $6,000.00 |
| 1510 | Drop box inlet type 5A | EACH A A | 2 | $5,000.00 | $7,000.00 |
| 1520 | Drop box inlet type 5E | EACH A A | 1 | $5,000.00 | $7,000.00 |
| 1530 | Drop box inlet type 7 | EACH A A | 3 | $5,000.00 | $5,000.00 |
| 1540 | Drop box inlet type 11 | EACH A A | 1 | $5,000.00 | $5,000.00 |
| 1550 | Drop box inlet type 13G | EACH A A | 9 | $5,000.00 | $3,000.00 |
| 1560 | Drop box inlet type 13S | EACH A A | 1 | $5,000.00 | $5,000.00 |
| 1570 | Junction box-18 in | EACH A A | 4 | $2,250.00 | $4,000.00 |
| 1580 | Junction box-24 in | EACH A A | 3 | $3,500.00 | $4,000.00 |
| 1590 | Junction box-42 in | EACH A A | 3 | $5,000.00 | $4,000.00 |
| 1600 | Junction box-60 in | EACH A A | 1 | $7,500.00 | $4,000.00 |
| 1610 | Junction box | EACH A A | 2 | $15,000 | $4,500.00 |
| 1620 | Manhole type A | EACH A A | 1 | $4,200.00 | $5,500.00 |
| 1630 | Manhole type C | EACH A A | 3 | $12,000 | $10,000 |
| 1640 | Fabric-geotextile class 2 for pipe | SQYD A A | 16,068 | $2.00 | $2.00 |
| 1650 | Remove headwall | EACH A A | 15 | $500.00 | $1,685.56 |
| 1660 | S cipp liner 24 inch | LF A A | 170 | $195.00 | $399.14 |
| 1670 | S cipp liner 30 inch | LF A A | 160 | $218.00 | $461.54 |
| 1680 | S cipp liner 42 inch | LF A A | 309 | $300.00 | $518.24 |
| 1690 | S cipp liner 54 inch | LF A A | 423 | $600.00 | $717.23 |
| 1700 | S cipp liner 66 inch | LF A A | 361 | $920.00 | $1,035.68 |
| 1710 | Reset grate | EACH A A | 1 | $500.00 | $1,975.49 |
| 1720 | Pipe culvert headwall-72 in | EACH A A | 1 | $20,000 | $8,000.00 |
| 1730 | Pipe culvert headwall-54 in | EACH A A | 3 | $5,200.00 | $7,476.30 |
| 1740 | Headwall | EACH A A | 13 | $4,000.00 | $2,634.46 |
| 1750 | Junction box-24 in | EACH A A | 4 | $5,000.00 | $5,000.00 |
| 1760 | Structure granular backfill | CUYD A A | 621.70 | $68.00 | $59.25 |
| 1770 | Armored edge for concrete | LF A A | 191.60 | $75.00 | $85.00 |
| 1780 | Structure excav-solid rock | CUYD A A | 360.90 | $100.00 | $125.00 |
| 1790 | Foundation preparation | LS A A | 1 | $55,000 | $20,000 |
| 1800 | Crushed aggregate slope prot | TON A A | 228.20 | $80.00 | $51.13 |
| 1810 | Concrete-class A | CUYD A A | 142.10 | $1,035.00 | $1,207.00 |
| 1820 | Concrete-class AA | CUYD A A | 308 | $1,410.00 | $1,331.00 |
| 1830 | Steel reinforcement | LB A A | 12,051 | $2.00 | $1.52 |
| 1840 | Steel reinforcement-epoxy coated | LB A A | 67,245 | $1.97 | $1.66 |
| 1850 | Electrical junction box type A | EACH A A | 4 | $3,500.00 | $3,500.00 |
| 1860 | Concrete sealing | SQFT A A | 12,073.70 | $1.97 | $2.00 |
| 1870 | PPC I-beam type HN 42-49 | LF A A | 924 | $705.00 | $658.90 |
| 1880 | Rail system single slope - 40 in | LF A A | 172.40 | $180.00 | $213.00 |
| 1890 | Remove concrete masonry | CUYD A A | 27 | $170.00 | $350.00 |
| 1900 | Structure excav-solid rock | CUYD A A | 41 | $160.00 | $125.00 |
| 1910 | Foundation preparation | LS A A | 1 | $22,500 | $15,000 |
| 1920 | Concrete-class A | CUYD A A | 143 | $860.00 | $1,063.00 |
| 1930 | Steel reinforcement | LB A A | 27,568 | $1.85 | $1.46 |
| 1935 | S bypass pumping | EACH A A | 4 | $15,000 | $15,750 |
| 1940 | S encasement steel bored range 2 | LF A A | 370 | $500.00 | $525.00 |
| 1950 | S encasement steel open cut range 3 | LF A A | 90 | $850.00 | $895.00 |
| 1960 | S encasement steel open cut range 4 | LF A A | 110 | $1,155.00 | $1,215.00 |
| 1970 | S force main air RLS/vac VLV 04 in | EACH A A | 1 | $15,550 | $16,350 |
| 1980 | S force main PVC 04 inch | LF A A | 3,065 | $120.00 | $126.00 |
| 1990 | S force main PVC 06 inch | LF A A | 545 | $190.00 | $200.00 |
| 2000 | S force main PVC 10 inch | LF A A | 428 | $208.00 | $218.40 |
| 2010 | S force main tap sleeve/valve RNG 1 | EACH A A | 4 | $6,105.00 | $6,417.50 |
| 2020 | S force main tap sleeve/valve RNG 2 | EACH A A | 2 | $12,400 | $13,000 |
| 2030 | S force main tie-in 04 inch | EACH A A | 1 | $2,925.00 | $3,075.00 |
| 2040 | S force main valve gate | EACH A A | 2 | $2,650.00 | $2,785.00 |
| 2050 | S lateral short side 04 inch | EACH A A | 2 | $3,565.00 | $3,745.00 |
| 2060 | S manhole | EACH A A | 18 | $10,700 | $11,250 |
| 2070 | S manhole abandon/remove | EACH A A | 6 | $3,350.00 | $3,520.00 |
| 2080 | S manhole adjust to grade | EACH A A | 5 | $2,800.00 | $2,940.00 |
| 2090 | S manhole reconstruct invert | EACH A A | 1 | $2,250.00 | $2,365.00 |
| 2100 | S pipe PVC 08 inch | LF A A | 134 | $265.00 | $280.00 |
| 2110 | S pipe PVC 10 inch | LF A A | 1,258 | $323.25 | $340.00 |
| 2120 | S pump station | EACH A A | 1 | $13,100 | $13,755 |
| 2130 | S cap existing main | EACH A A | 2 | $1,105.00 | $1,160.00 |
| 2140 | S cap existing main | EACH A A | 18 | $3,485.00 | $3,660.00 |
| 2150 | S cap existing main | EACH A A | 4 | $2,370.00 | $2,450.00 |
| 2160 | S force main PVC RSTRND joint 04 inch | LF A A | 395 | $174.55 | $183.30 |
| 2170 | S force main PVC RSTRND joint 10 inch | LF A A | 108 | $168.00 | $176.40 |
| 2180 | Object marker type 2 | EACH A A | 4 | $250.00 | $273.46 |
| 2190 | SBM alum sheet signs .080 in | SQFT A A | 1,316.90 | $31.00 | $38.32 |
| 2200 | SBM alum sheet signs .125 in | SQFT A A | 1,675.70 | $32.50 | $41.52 |
| 2210 | Steel post type 1 | LF A A | 1,955 | $30.00 | $31.00 |
| 2220 | Steel post type 2 | LF A A | 2,488.60 | $29.75 | $29.40 |
| 2230 | Steel post mile markers | EACH A A | 6 | $450.00 | $270.26 |
| 2240 | Class A concrete for signs | CUYD A A | 19.25 | $1,200.00 | $1,710.09 |
| 2250 | GMSS type D | EACH A A | 79 | $780.00 | $425.71 |
| 2260 | Install sign post reflectors | EACH A A | 22 | $60.00 | $153.27 |
| 2270 | Advance warning flasher | EACH A A | 4 | $2,500.00 | $7,691.66 |
| 2280 | Install | EACH A A | 5 | $350.00 | $89.16 |
| 2290 | Install | EACH A A | 2 | $3,500.00 | $9,178.17 |
| 2300 | Barcode sign inventory | EACH A A | 458 | $20.00 | $44.58 |
| 2310 | Remove store & reinstall | EACH A A | 5 | $700.00 | $338.59 |
| 2320 | Electrical junction box type B | EACH A A | 9 | $2,000.00 | $1,538.72 |
| 2330 | Trenching and backfilling | LF A A | 1,955 | $14.85 | $44.42 |
| 2340 | Cable-no. 14/5C | LF A A | 7,365 | $5.80 | $2.21 |
| 2350 | Cable-no. 14/7C | LF A A | 1,850 | $6.15 | $2.21 |
| 2360 | Cable-no. 14/1 pair | LF A A | 235 | $0.01 | $2.74 |
| 2370 | Messenger-15400 LB | LF A A | 2,275 | $6.25 | $18.83 |
| 2380 | Install steel strain pole | EACH A A | 20 | $16,463 | $1,640.17 |
| 2390 | Temp relocation of signal head | EACH A A | 68 | $250.00 | $570.43 |
| 2400 | SBM alum sheet signs .080 in | SQFT A A | 71.70 | $10.00 | $537.64 |
| 2410 | Install span mounted sign | EACH A A | 2 | $1,500.00 | $309.96 |
| 2420 | Install LED signal-3 section | EACH A A | 26 | $800.00 | $309.96 |
| 2430 | Install LED signal-5 section | EACH A A | 1 | $1,050.00 | $309.96 |
| 2440 | Install LED signal- 4 section | EACH A A | 6 | $900.00 | $309.96 |
| 2450 | Install LED beacon-12 in | EACH A A | 4 | $150.00 | $2,764.84 |
| 2460 | Relocate signal head | EACH A A | 8 | $250.00 | $570.43 |
| 2470 | Install pedestrian detector | EACH A A | 6 | $350.00 | $2,969.35 |
| 2480 | Install luminaire pole | EACH A A | 2 | $6,000.00 | $1,763.04 |
| 2490 | Remove & reinstall coordinating unit | EACH A A | 1 | $2,500.00 | $3,618.77 |
| 2500 | Traffic signal pole base | CUYD A A | 105.05 | $300.00 | $1,835.75 |
| 2510 | Install signal pedestal | EACH A A | 6 | $5,500.00 | $3,694.57 |
| 2520 | Install antenna | EACH A A | 3 | $2,500.00 | $2,256.35 |
| 2530 | Advance warning flasher | EACH A A | 3 | $2,500.00 | $7,691.66 |
| 2540 | Tether wire | LF A A | 110 | $2.75 | $13.22 |
| 2550 | Install | EACH A A | 6 | $20,000 | $3,755.84 |
| 2560 | Install | EACH A A | 2 | $3,500.00 | $9,155.54 |
| 2570 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,940 | $1.04 | $7.08 |
| 2580 | PVC conduit-2 in-schedule 80 | LF A A | 145 | $1.60 | $9.87 |
| 2590 | Install signal controller-TY atc | EACH A A | 4 | $9,000.00 | $22,435 |
| 2600 | Remove signal equipment | EACH A A | 8 | $8,900.00 | $5,517.06 |
| 2610 | Install radar presence detector type A | EACH A A | 15 | $2,000.00 | $1,326.22 |
| 2620 | Install radar advance detector type B | EACH A A | 6 | $2,000.00 | $1,326.22 |
| 2630 | Pole 40 FT MTG HT | EACH A A | 18 | $2,500.00 | $3,749.74 |
| 2640 | Bracket 15 FT | EACH A A | 18 | $1,250.00 | $1,138.64 |
| 2650 | Pole base | EACH A A | 53 | $5,000.00 | $2,634.37 |
| 2660 | Transformer base | EACH A A | 18 | $1,000.00 | $1,979.34 |
| 2670 | Fused connector kit | EACH A A | 36 | $250.00 | $268.79 |
| 2680 | Conduit-1 1/4 in | LF A A | 160 | $62.14 | $19.94 |
| 2690 | Conduit-3 in | LF A A | 1,325 | $20.82 | $54.07 |
| 2700 | Marker | EACH A A | 8 | $1,000.00 | $1,023.49 |
| 2710 | Trenching and backfilling | LF A A | 8,585 | $14.84 | $44.42 |
| 2720 | Open cut roadway | LF A A | 545 | $97.33 | $30.53 |
| 2730 | Wire-no. 12 | LF A A | 3,550 | $0.20 | $1.21 |
| 2740 | Cable-no. 8/3C ducted | LF A A | 2,250 | $5.36 | $7.74 |
| 2750 | Remove lighting | LS A A | 1 | $4,249.99 | $46,320 |
| 2760 | Electrical junction box type A | EACH A A | 29 | $3,500.00 | $2,084.43 |
| 2770 | Bore and jack conduit | LF A A | 350 | $39.20 | $81.27 |
| 2780 | Wire-no. 10 | LF A A | 10,950 | $1.79 | $1.41 |
| 2790 | LED luminaire | EACH A A | 21 | $2,000.00 | $1,124.33 |
| 2800 | Cable-no. 10/3C ducted | LF A A | 10,385 | $3.63 | $6.68 |
| 2810 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 7,240 | $1.04 | $7.08 |
| 2820 | PVC conduit-2 in-schedule 80 | LF A A | 2,000 | $1.60 | $9.87 |
| 2830 | W air release valve 3/4 inch | EACH A A | 1 | $8,500.00 | $8,925.00 |
| 2840 | W cap existing main | EACH A A | 34 | $4,585.88 | $4,815.88 |
| 2850 | W encasement steel bored range 3 | LF A A | 460 | $500.00 | $525.00 |
| 2860 | W encasement steel bored range 4 | LF A A | 285 | $600.00 | $630.00 |
| 2870 | W encasement steel bored range 5 | LF A A | 485 | $1,155.00 | $1,215.00 |
| 2880 | W encasement steel bored range 6 | LF A A | 255 | $1,430.00 | $1,500.00 |
| 2890 | W encasement steel open cut range 3 | LF A A | 75 | $500.00 | $525.00 |
| 2900 | W encasement steel open cut range 5 | LF A A | 120 | $210.00 | $220.50 |
| 2910 | W encasement steel open cut range 6 | LF A A | 260 | $1,430.00 | $1,500.00 |
| 2920 | W fire hydrant assembly | EACH A A | 9 | $13,000 | $13,650 |
| 2930 | W flushing assembly | EACH A A | 13 | $9,625.38 | $10,119 |
| 2940 | W meter 3/4 inch | EACH A A | 1 | $2,400.00 | $2,520.00 |
| 2950 | W pipe ductile iron 06 inch | LF A A | 305 | $220.00 | $231.00 |
| 2960 | W pipe ductile iron 24 inch | LF A A | 310 | $547.98 | $576.02 |
| 2970 | W pipe DCTL iron RSTRND joint 24 in | LF A A | 1,105 | $550.39 | $577.92 |
| 2980 | W pipe DCTL iron RSTRND joint 24 in | LF A A | 72 | $655.00 | $687.75 |
| 2990 | W pipe PVC 06 inch | LF A A | 655 | $198.97 | $208.77 |
| 3000 | W pipe PVC 08 inch | LF A A | 40 | $220.50 | $231.50 |
| 3010 | W pipe PVC 10 inch | LF A A | 735 | $222.50 | $233.65 |
| 3020 | W pipe PVC 12 inch | LF A A | 5,395 | $226.00 | $237.30 |
| 3030 | W serv PE/PLST long side 1 in | EACH A A | 1 | $8,850.00 | $9,295.00 |
| 3040 | W serv PE/PLST short side 3/4 in | EACH A A | 7 | $3,967.14 | $4,167.14 |
| 3050 | W tapping sleeve and valve size 1 | EACH A A | 12 | $6,479.17 | $6,804.17 |
| 3060 | W tapping sleeve and valve size 2 | EACH A A | 21 | $47,607 | $50,000 |
| 3070 | W tie-in 08 inch | EACH A A | 1 | $3,900.00 | $4,100.00 |
| 3080 | W tie-in 12 inch | EACH A A | 3 | $5,455.00 | $5,725.00 |
| 3090 | W valve 06 inch | EACH A A | 1 | $3,200.00 | $3,360.00 |
| 3100 | W valve 08 inch | EACH A A | 1 | $4,100.00 | $4,300.00 |
| 3110 | W valve 12 inch | EACH A A | 1 | $6,700.00 | $7,100.00 |
| 3120 | W pipe PVC RSTRND joint 06 inch | LF A A | 510 | $90.00 | $94.50 |
| 3130 | W pipe PVC RSTRND joint 10 inch | LF A A | 315 | $132.00 | $138.60 |
| 3140 | W pipe PVC RSTRND joint 12 inch | LF A A | 655 | $165.75 | $174.00 |
| 3150 | W pipe ductile iron 18 inch | LF A A | 150 | $426.00 | $447.50 |
| 3160 | W pipe ductile iron RSTRND joint 18 inch | LF A A | 200 | $300.75 | $315.80 |
| 3161 | Conduit-1 1/4 in | LF A A | 70 | $7.05 | $19.94 |
| 3162 | Conduit-2 in | LF A A | 10 | $9.75 | $26.27 |
| 3163 | Trenching and backfilling | LF A A | 69 | $14.84 | $44.42 |
| 3164 | Piezoelectric sensor | EACH A A | 4 | $5,000.00 | $4,071.28 |
| 3165 | Loop wire | LF A A | 4,050 | $0.30 | $1.02 |
| 3166 | Loop saw slot and fill | LF A A | 800 | $20.00 | $37.72 |
| 3167 | Galvanized steel cabinet | EACH A A | 1 | $1,000.00 | $1,609.20 |
| 3168 | Wood post | EACH A A | 4 | $500.00 | $702.08 |
| 3169 | Electrical junction box type A | EACH A A | 1 | $3,500.00 | $2,084.43 |
| 3170 | Mobilization | LS A A | 1 | $1,419,000 | $1,996,000 |
| 3171 | Electrical junction box-10 X 8 X 4 | EACH A A | 2 | $750.00 | $714.44 |
| 3180 | Demobilization | LS A A | 1 | $530,000 | $625,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of August 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.