KYTC contract 25-1033 bid tabulation
ASPHALT SURFACE WITH GRADE & DRAIN KY-251. Let by Kentucky Transportation Cabinet on November 20, 2025. 4 bids received; low bid $11,045,271 by Dirt Works Unlimited LLC, -24% against the engineer's estimate of $14,482,238.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 NOV 2025
- Pay items
- 153
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Dirt Works Unlimited LLC | $11,045,271 | Low | -24% |
| 2 | Scotty'S Contracting & Stone LLC | $12,963,774 | +17% | -10% |
| 3 | Louisville Paving Company Inc | $14,719,297 | +33% | +2.0% |
| 4 | Cleary Construction Inc | $15,135,000 | +37% | +5.0% |
Engineer's estimate: $14,482,238.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dirt Works Unlimited LLC | 2. Scotty'S Contracting & Stone LLC | 3. Louisville Paving Company Inc | 4. Cleary Construction Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 37,861 | $31.86 | $38.05 | $35.00 | $40.00 |
| 0020 | Traffic bound base | TON A A | 490 | $39.31 | $47.52 | $47.42 | $50.00 |
| 0030 | Asphalt seal aggregate | TON A A | 663 | $105.73 | $143.59 | $97.99 | $105.00 |
| 0040 | Asphalt seal coat | TON A A | 80 | $906.28 | $834.26 | $850.12 | $1,150.00 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 4,000 | $92.49 | $84.97 | $105.00 | $91.85 |
| 0060 | Leveling & wedging PG76-22 | TON A A | 28 | $117.36 | $284.75 | $110.00 | $116.55 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 21,547 | $80.36 | $78.44 | $87.00 | $79.80 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 159 | $96.77 | $243.86 | $155.00 | $96.10 |
| 0090 | CL2 asph surf 0.38D PG64-22 | TON A A | 2,168 | $93.85 | $123.69 | $91.00 | $93.20 |
| 0100 | CL2 asph surf 0.38B PG64-22 | TON A A | 3,970 | $86.55 | $90.83 | $91.00 | $85.95 |
| 0110 | Asphalt material for tack | TON A A | 7 | $518.80 | $598.24 | $0.01 | $515.20 |
| 0120 | CL3 asph surf 0.38B PG76-22 | TON A A | 1,393 | $107.29 | $115.41 | $102.00 | $106.55 |
| 0130 | Asphalt pave milling & texturing | TON A A | 1,655 | $31.42 | $29.40 | $23.21 | $31.20 |
| 0140 | Concrete-class A | CUYD A A | 498.44 | $504.04 | $489.75 | $488.64 | $489.75 |
| 0150 | Joint adhesive | LF A A | 50,400 | $0.49 | $0.49 | $0.01 | $0.49 |
| 0160 | Asphalt material for tack non-tracking | TON A A | 46 | $651.37 | $598.24 | $0.01 | $646.85 |
| 0170 | Crushed aggregate size no 2 | TON A A | 32,385 | $28.28 | $30.82 | $33.13 | $37.44 |
| 0180 | Perforated pipe-4 in | LF A A | 8,280 | $14.92 | $9.21 | $21.44 | $25.00 |
| 0190 | Non-perforated pipe-4 in | LF A A | 902 | $14.02 | $17.22 | $22.36 | $26.00 |
| 0200 | Perf pipe headwall TY 1-4 in | EACH A A | 11 | $639.05 | $661.18 | $895.34 | $1,500.00 |
| 0210 | Perf pipe headwall TY 3-4 in | EACH A A | 36 | $927.70 | $941.50 | $896.71 | $1,600.00 |
| 0220 | Standard curb and gutter | LF A A | 561 | $49.45 | $49.11 | $49.11 | $49.11 |
| 0230 | Island curb and gutter | LF A A | 395 | $41.00 | $40.72 | $40.72 | $40.72 |
| 0240 | Standard header curb | LF A A | 1,206 | $32.17 | $31.95 | $31.95 | $31.95 |
| 0250 | Island header curb type 1 | LF A A | 986 | $24.34 | $24.17 | $24.17 | $24.17 |
| 0260 | Mountable median type 3A | SQYD A A | 143 | $227.46 | $225.88 | $225.88 | $225.88 |
| 0270 | Delineator for guardrail BI directional white | EACH A A | 31 | $16.46 | $16.35 | $16.35 | $20.00 |
| 0280 | Barricade-type III | EACH A A | 25 | $151.05 | $324.76 | $100.00 | $159.00 |
| 0290 | Remove concrete island | SQYD A A | 57 | $7.36 | $26.92 | $155.75 | $35.00 |
| 0300 | JPC pavement-10 in | SQYD A A | 320 | $165.11 | $163.97 | $163.97 | $163.97 |
| 0310 | Remove pavement | SQYD A A | 4,301 | $4.99 | $4.16 | $6.42 | $15.00 |
| 0320 | Cem conc ent pavement-8 in | SQYD A A | 978 | $118.49 | $117.67 | $117.67 | $117.67 |
| 0330 | Temp ditch | LF A A | 9,608 | $1.07 | $0.01 | $2.22 | $1.00 |
| 0340 | Clean temp ditch | LF A A | 4,804 | $0.88 | $0.01 | $2.22 | $0.01 |
| 0350 | Roadway excavation | CUYD A A | 131,787 | $8.58 | $12.85 | $22.00 | $20.75 |
| 0360 | Water | MGAL A A | 650 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0370 | Guardrail terminal section no 1 | EACH A A | 5 | $82.69 | $82.12 | $82.12 | $100.00 |
| 0380 | Remove guardrail | LF A A | 4,272 | $3.85 | $3.82 | $3.82 | $2.00 |
| 0390 | Guardrail end treatment type 4A | EACH A A | 6 | $3,909.70 | $3,882.59 | $3,882.59 | $4,500.00 |
| 0400 | Temp guardrail | LF A A | 462.50 | $23.05 | $22.89 | $22.89 | $20.00 |
| 0410 | Right-of-way monument type 1 | EACH A A | 129 | $192.60 | $275.20 | $191.26 | $150.00 |
| 0420 | Witness post | EACH A A | 3 | $162.59 | $164.48 | $161.46 | $150.00 |
| 0430 | Channel lining class II | TON A A | 217 | $66.05 | $52.72 | $66.06 | $60.00 |
| 0440 | Channel lining class III | TON A A | 351 | $50.49 | $58.28 | $67.23 | $65.00 |
| 0450 | Clearing and grubbing | LS A A | 1 | $1,510.47 | $2,727.06 | $26,036 | $45,000 |
| 0460 | Clearing and grubbing | LS A A | 1 | $124,418 | $153,479 | $240,000 | $175,000 |
| 0470 | Temporary signs | SQFT A A | 1,465.50 | $6.04 | $8.08 | $5.00 | $6.36 |
| 0480 | Edge key | LF A A | 495 | $5.70 | $55.31 | $7.07 | $50.00 |
| 0490 | Fabric-geotextile class 1 | SQYD A A | 39,352 | $1.44 | $2.02 | $1.12 | $2.50 |
| 0500 | Fabric-geotextile class 2 for pipe | SQYD A A | 8,239 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0510 | Maintain & control traffic | LS A A | 1 | $225,088 | $618,854 | $600,000 | $355,000 |
| 0520 | Maintain & control traffic | LS A A | 1 | $26,525 | $117,122 | $199,000 | $100,000 |
| 0530 | Diversions (by-pass detours) | LS A A | 1 | $56,514 | $143,190 | $3,268.21 | $350,000 |
| 0535 | Diversions (by-pass detours) | LS A A | 1 | $21,062 | $24,230 | $46,359 | $78,000 |
| 0540 | Portable changeable message sign | EACH A A | 10 | $1,992.56 | $9,116.00 | $7,632.00 | $7,950.00 |
| 0550 | Mobilization for mill & text | LS A A | 1 | $3,874.43 | $2,957.01 | $1,500.00 | $3,500.00 |
| 0560 | Mobilization for mill & text | LS A A | 1 | $3,874.43 | $5,585.46 | $1,500.00 | $3,500.00 |
| 0570 | Asphalt pave milling & texturing | TON A A | 322 | $40.52 | $64.52 | $24.50 | $31.20 |
| 0580 | Safeloading | CUYD A A | 90.10 | $256.88 | $400.00 | $373.64 | $675.00 |
| 0590 | Edgeline rumble strips | LF A A | 32,481 | $0.20 | $0.24 | $0.20 | $0.20 |
| 0600 | Temp silt fence | LF A A | 12,366 | $1.85 | $1.14 | $2.00 | $3.06 |
| 0610 | Silt trap type A | EACH A A | 47 | $377.34 | $215.00 | $0.01 | $350.00 |
| 0620 | Silt trap type B | EACH A A | 47 | $274.71 | $436.45 | $0.01 | $150.00 |
| 0630 | Silt trap type C | EACH A A | 54 | $303.02 | $271.98 | $0.01 | $340.00 |
| 0640 | Clean silt trap type A | EACH A A | 47 | $68.67 | $0.01 | $0.01 | $1.00 |
| 0650 | Clean silt trap type B | EACH A A | 47 | $62.41 | $107.50 | $0.01 | $1.00 |
| 0660 | Clean silt trap type C | EACH A A | 62 | $47.12 | $0.01 | $0.01 | $1.00 |
| 0670 | Sidewalk-4 in concrete | SQYD A A | 498 | $82.01 | $71.96 | $71.96 | $71.96 |
| 0680 | Staking | LS A A | 1 | $54,694 | $75,250 | $58,091 | $125,000 |
| 0690 | Staking | LS A A | 1 | $19,449 | $12,900 | $62,666 | $75,000 |
| 0700 | Arrow panel | EACH A A | 3 | $805.59 | $4,558.00 | $5,088.00 | $3,869.00 |
| 0710 | Erosion control blanket | SQYD A A | 10,368 | $1.70 | $1.75 | $2.84 | $1.69 |
| 0720 | Temp mulch | SQYD A A | 146,949 | $0.24 | $0.25 | $0.42 | $0.24 |
| 0730 | Temp seeding and protection | SQYD A A | 110,212 | $0.30 | $0.30 | $0.44 | $0.30 |
| 0740 | Initial fertilizer | TON A A | 2.40 | $930.45 | $1,500.00 | $1,684.60 | $924.00 |
| 0750 | Maintenance fertilizer | TON A A | 8.20 | $930.45 | $1,500.00 | $1,684.60 | $924.00 |
| 0760 | Seeding and protection | SQYD A A | 51,556 | $0.45 | $0.42 | $0.68 | $0.45 |
| 0770 | Sodding | SQYD A A | 78,140 | $7.54 | $7.00 | $8.30 | $6.22 |
| 0780 | Agricultural limestone | TON A A | 32.50 | $98.09 | $85.00 | $89.01 | $97.41 |
| 0790 | Topsoil furnished and placed | CUYD A A | 163 | $31.41 | $118.66 | $130.97 | $35.00 |
| 0800 | Pave striping-temp paint-4 in | LF A A | 73,100 | $0.31 | $0.31 | $0.31 | $0.31 |
| 0810 | Pave striping-temp paint-6 in | LF A A | 8,300 | $0.32 | $0.32 | $0.32 | $0.32 |
| 0820 | Pave striping-perm paint-6 in | LF A A | 60,323 | $0.33 | $0.33 | $0.33 | $0.33 |
| 0830 | Pave striping-thermo-6 in W | LF A A | 8,766 | $1.36 | $1.35 | $1.35 | $1.35 |
| 0840 | Pave striping-thermo-6 in Y | LF A A | 4,593 | $1.36 | $1.35 | $1.35 | $1.35 |
| 0850 | Pave striping-thermo-8 in W | LF A A | 211 | $3.02 | $3.00 | $3.00 | $3.00 |
| 0860 | Pave striping-thermo-12 in W | LF A A | 132 | $8.06 | $8.00 | $8.00 | $8.00 |
| 0870 | Pave marking-thermo stop bar-24IN | LF A A | 26 | $15.10 | $15.00 | $15.00 | $15.00 |
| 0880 | Pave marking-thermo cross-hatch | SQFT A A | 9,959 | $6.29 | $6.25 | $6.25 | $6.25 |
| 0890 | Pave marking-thermo STR arrow | EACH A A | 4 | $151.05 | $150.00 | $150.00 | $150.00 |
| 0900 | Pave marking-thermo curv arrow | EACH A A | 25 | $151.05 | $150.00 | $150.00 | $150.00 |
| 0910 | Pave marking-thermo comb arrow | EACH A A | 2 | $302.10 | $300.00 | $300.00 | $300.00 |
| 0920 | Pave marking-thermo only | EACH A A | 2 | $503.49 | $500.00 | $500.00 | $500.00 |
| 0930 | Inlaid pavement marker-MW | EACH A A | 115 | $23.16 | $23.00 | $23.00 | $23.00 |
| 0940 | Inlaid pavement marker-by | EACH A A | 78 | $23.16 | $23.00 | $23.00 | $23.00 |
| 0950 | Fuel adjustment | DOLL A A | 101,350 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0960 | Asphalt adjustment | DOLL A A | 125,545 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0970 | Object marker TY 3 | EACH A A | 6 | $38.14 | $37.87 | $37.87 | $100.00 |
| 0980 | Centerline rumble strips | LF A A | 16,850 | $0.30 | $0.17 | $0.30 | $0.30 |
| 0990 | Longitudinal edge key | LF A A | 15,436 | $5.46 | $2.79 | $2.43 | $3.65 |
| 1000 | G/R steel W beam-S face (7 FT post) | LF A A | 3,112.50 | $31.12 | $30.90 | $30.90 | $39.00 |
| 1010 | Pave marking-thermo yield bar-36 in | LF A A | 98 | $25.17 | $25.00 | $25.00 | $25.00 |
| 1020 | Water blasting existing stripe | LF A A | 2,293 | $3.02 | $3.00 | $3.00 | $3.00 |
| 1030 | Detectable warnings | SQFT A A | 160 | $47.02 | $46.69 | $46.69 | $46.69 |
| 1040 | Pave mark-thermo-X-walk-24 in | LF A A | 450 | $15.10 | $15.00 | $15.00 | $15.00 |
| 1050 | Turf reinforcement mat 1 | SQYD A A | 11,711 | $5.70 | $6.50 | $10.31 | $5.66 |
| 1060 | Landscaping | LS A A | 1 | $55,711 | $54,797 | $54,797 | $55,325 |
| 1070 | Pave mark-thermo-yield | EACH A A | 8 | $453.14 | $450.00 | $450.00 | $450.00 |
| 1080 | Roundabout arrow | EACH A A | 28 | $503.49 | $500.00 | $500.00 | $500.00 |
| 1090 | Fence-special | LF A A | 50 | $9.67 | $12.75 | $12.56 | $50.00 |
| 1100 | R/W monument type 3 | EACH A A | 5 | $192.60 | $376.25 | $191.26 | $150.00 |
| 1110 | Pave marking-thermo dotted lane exten | LF A A | 62 | $10.07 | $10.00 | $10.00 | $10.00 |
| 1120 | Remove signal equipment | EACH A A | 1 | $5,326.76 | $5,326.76 | $5,326.76 | $5,326.76 |
| 1130 | Electronic delivery MGMT system - agg | LS A A | 1 | $1,006.98 | $0.01 | $0.01 | $1.29 |
| 1140 | Entrance pipe-15 in | LF A A | 3,038 | $47.88 | $72.33 | $90.38 | $80.00 |
| 1150 | Entrance pipe-18 in | LF A A | 424 | $70.69 | $87.73 | $95.06 | $85.00 |
| 1160 | Culvert pipe-18 in | LF A A | 1,983 | $170.44 | $130.07 | $90.79 | $125.00 |
| 1170 | Culvert pipe-24 in | LF A A | 325 | $176.21 | $173.88 | $124.45 | $155.00 |
| 1180 | Storm sewer pipe-15 in | LF A A | 242 | $149.19 | $184.22 | $100.34 | $85.00 |
| 1190 | Storm sewer pipe-18 in | LF A A | 53 | $133.68 | $231.03 | $471.12 | $130.00 |
| 1200 | Pipe culvert headwall-18 in | EACH A A | 20 | $1,631.29 | $2,200.00 | $1,927.18 | $3,250.00 |
| 1210 | Pipe culvert headwall-24 in | EACH A A | 1 | $1,749.80 | $2,500.00 | $2,026.34 | $3,500.00 |
| 1220 | Remove pipe | LF A A | 16 | $45.96 | $159.27 | $81.70 | $135.00 |
| 1230 | Sloped box outlet type 1-18 in | EACH A A | 2 | $2,044.33 | $3,000.00 | $2,472.79 | $4,750.00 |
| 1240 | S & F box inlet-outlet-18 in | EACH A A | 15 | $2,730.77 | $3,600.00 | $2,672.29 | $4,850.00 |
| 1250 | S & F box inlet-outlet-24 in | EACH A A | 9 | $3,920.59 | $5,000.00 | $3,490.58 | $5,800.00 |
| 1260 | Curb box inlet type A | EACH A A | 8 | $5,634.84 | $6,800.00 | $6,677.85 | $9,850.00 |
| 1270 | Drop box inlet type 3 | EACH A A | 6 | $4,941.53 | $4,000.00 | $5,250.02 | $10,000 |
| 1280 | Drop box inlet type 3 mod | EACH A A | 2 | $4,235.09 | $3,200.00 | $5,406.02 | $8,500.00 |
| 1290 | Drop box inlet type 12A | LF A A | 2 | $3,670.66 | $1,500.00 | $5,000.00 | $2,500.00 |
| 1300 | Cap drop box inlet | EACH A A | 2 | $1,048.11 | $2,000.00 | $1,816.79 | $3,500.00 |
| 1310 | Junction box | EACH A A | 1 | $2,073.66 | $3,600.00 | $2,427.27 | $4,750.00 |
| 1320 | Fabric-geotextile class 2 for pipe | SQYD A A | 408 | $2.00 | $2.00 | $2.00 | $2.00 |
| 1330 | Clean pipe structure | EACH A A | 23 | $906.28 | $900.00 | $900.00 | $900.00 |
| 1340 | Pipeline inspection | LF A A | 2,312 | $2.37 | $2.35 | $2.35 | $2.35 |
| 1350 | Structure excav-solid rock | CUYD A A | 33.20 | $198.98 | $350.00 | $145.00 | $195.00 |
| 1360 | Foundation preparation | LS A A | 1 | $19,066 | $18,000 | $37,000 | $30,000 |
| 1370 | Concrete-class A | CUYD A A | 84.60 | $885.25 | $1,833.00 | $1,845.60 | $2,400.00 |
| 1380 | Steel reinforcement | LB A A | 9,503 | $2.05 | $2.00 | $1.56 | $2.00 |
| 1390 | Saw-clean-reseal random cracks | LF A A | 30 | $79.63 | $125.00 | $45.00 | $150.00 |
| 1400 | Lightweight cellular concrete fill | CUYD A A | 360 | $234.77 | $209.00 | $53.75 | $300.00 |
| 1410 | Concrete patching | SQFT A A | 2.50 | $477.76 | $550.00 | $900.00 | $1,500.00 |
| 1420 | SBM alum sheet signs .080 in | SQFT A A | 591 | $47.32 | $39.00 | $46.99 | $50.00 |
| 1430 | SBM alum sheet signs .125 in | SQFT A A | 42 | $48.98 | $42.00 | $48.64 | $50.00 |
| 1440 | Steel post type 1 | LF A A | 733 | $31.06 | $32.00 | $30.84 | $30.00 |
| 1450 | GMSS type D | EACH A A | 18 | $443.90 | $750.00 | $440.82 | $750.00 |
| 1460 | Barcode sign inventory | EACH A A | 122 | $47.95 | $12.00 | $47.62 | $25.00 |
| 1470 | Trenching and backfilling | LF A A | 2,550 | $12.65 | $12.65 | $12.65 | $12.65 |
| 1480 | Electrical junction box type A | EACH A A | 8 | $1,722.99 | $1,722.99 | $1,722.99 | $1,722.99 |
| 1490 | Bore and jack conduit | LF A A | 750 | $22.67 | $22.67 | $22.67 | $22.67 |
| 1500 | PVC conduit-2 in-schedule 80 | LF A A | 2,800 | $14.06 | $14.06 | $14.06 | $14.06 |
| 1510 | Mobilization | LS A A | 1 | $173,000 | $364,629 | $675,000 | $699,000 |
| 1520 | Demobilization | LS A A | 1 | $170,000 | $182,917 | $205,000 | $211,555 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.