KYTC contract 25-1113 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE U.S. 79. Let by Kentucky Transportation Cabinet on August 21, 2025. 2 bids received; low bid $7,723,699 by Scotty'S Contracting & Stone LLC, -4.3% against the engineer's estimate of $8,067,223.

Owner
Kentucky Transportation Cabinet
Letting
21 AUG 2025
Pay items
157
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scotty'S Contracting & Stone LLC$7,723,699Low-4.0%
2Cleary Construction Inc$9,375,000+21%+16%
KYTC contract 25-1113: bids by rank

Engineer's estimate: $8,067,223.

Bid tabulation

LinePay itemUnitQuantity1. Scotty'S Contracting & Stone LLC2. Cleary Construction Inc
0010Crushed stone baseTON A A20,304$35.51$35.00
0020Traffic bound baseTON A A165$42.07$50.00
0030Asphalt seal aggregateTON A A370$130.35$95.00
0040Asphalt seal coatTON A A45$847.63$1,000.00
0050Leveling & wedging PG64-22TON A A3,558$95.98$140.00
0060CL3 asph base 1.00D PG64-22TON A A10,422$92.01$116.00
0070CL3 asph surf 0.38B PG64-22TON A A5,050$112.98$160.00
0080Cem conc ent pavement-8 inSQYD A A221$115.23$115.23
0090Asphalt pave milling & texturingTON A A2,145$39.04$15.00
0100Asphalt material for tack non-trackingTON A A34$626.73$700.00
0110Crushed aggregate size no 2TON A A33,945$31.71$36.00
0120Standard curb and gutterLF A A128$58.74$58.74
0130Standard curb and gutter modLF A A680$33.92$33.92
0140Standard header curbLF A A792$51.66$51.66
0150Delineator for guardrail BI directional whiteEACH A A9$16.19$16.19
0160Barricade-type IIIEACH A A4$256.39$159.00
0170Temp ditchLF A A5,831$0.67$1.00
0180Clean temp ditchLF A A2,915$0.01$0.01
0190Roadway excavationCUYD A A31,823$19.84$28.00
0200WaterMGAL A A100$0.01$0.01
0210Guardrail-steel W beam-S faceLF A A1,125$33.34$33.34
0220Guardrail terminal section no 1EACH A A2$90.16$90.16
0230Guardrail end treatment type 1EACH A A3$3,532.73$3,532.73
0240Remove guardrailLF A A432$3.39$3.39
0250Guardrail end treatment type 4AEACH A A7$3,863.84$3,863.84
0260Right-of-way monument type 1EACH A A50$166.61$166.61
0270Witness postEACH A A25$150.06$150.06
0280Channel lining class IITON A A852$51.74$68.00
0290Clearing and grubbingLS A A1$59,640$62,000
0300Temporary signsSQFT A A500$8.08$10.60
0310Edge keyLF A A295$56.95$55.00
0320Fabric-geotextile class 1SQYD A A35,228$2.28$2.50
0330Fabric-geotextile class 1ASQYD A A35,228$2.97$3.75
0340Maintain & control trafficLS A A1$295,314$157,000
0345Portable changeable message signEACH A A4$7,976.50$8,750.00
0350Mobilization for mill & textLS A A1$2,349.72$7,500.00
0360SafeloadingCUYD A A5$600.00$600.00
0370Shoulder rumble stripsLF A A14,541$0.30$0.30
0380Temp silt fenceLF A A5,831$2.53$3.00
0390Silt trap type AEACH A A23$300.47$275.00
0400Silt trap type BEACH A A23$137.61$175.00
0410Silt trap type CEACH A A23$166.09$300.00
0420Clean silt trap type AEACH A A23$135.99$0.01
0430Clean silt trap type BEACH A A23$82.25$0.01
0440Clean silt trap type CEACH A A23$82.25$0.01
0450StakingLS A A1$48,999$150,000
0460Remove structureLS A A1$10,046$2,800.00
0470Erosion control blanketSQYD A A13,590$1.75$3.25
0480Temp mulchSQYD A A71,965$0.20$0.40
0490Temp seeding and protectionSQYD A A53,974$0.30$0.42
0500Initial fertilizerTON A A5.60$1,500.00$1,382.14
0510Maintenance fertilizerTON A A3.40$1,500.00$1,382.14
0520Seeding and protectionSQYD A A46,802$0.42$0.80
0530SoddingSQYD A A1,056$8.50$13.39
0540Agricultural limestoneTON A A67$85.00$87.45
0550Pave striping-temp paint-4 inLF A A3,500$0.52$0.32
0560Pave striping-thermo-6 in WLF A A25,579$1.35$1.35
0570Pave striping-thermo-6 in YLF A A33,582$1.35$1.35
0580Pave striping-thermo-12 in YLF A A587$8.00$8.00
0590Pave marking-thermo stop bar-24INLF A A177$15.00$15.00
0600Pave marking-thermo curv arrowEACH A A28$140.00$140.00
0610Fuel adjustmentDOLL A A54,597$1.00$1.00
0620Asphalt adjustmentDOLL A A74,318$1.00$1.00
0630Object marker TY 3EACH A A8$257.67$257.67
0640Centerline rumble stripsLF A A7,290$0.45$0.45
0650Sawcut pavementLF A A13,075$0.92$1.35
0660Longitudinal edge keyLF A A11,150$3.17$4.45
0670Remove light poleEACH A A4$2,500.00$2,381.10
0680Inlaid pavement markerEACH A A281$23.00$23.00
0690Remove signal equipmentEACH A A2$26,744$12,016
0700Electronic delivery MGMT system - aggLS A A1$0.01$1.00
0710Entrance pipe-15 inLF A A1,004$85.98$95.00
0720Entrance pipe-18 inLF A A44$105.99$180.00
0730Entrance pipe-15 in equivLF A A228$89.05$100.00
0740Entrance pipe-18 in equivLF A A103$91.20$105.00
0750Culvert pipe-18 inLF A A97$213.09$128.00
0760Culvert pipe-42 inLF A A58$416.47$365.00
0770Storm sewer pipe-12 inLF A A316$91.50$125.00
0780Storm sewer pipe-15 inLF A A56$88.16$230.00
0790Storm sewer pipe-18 inLF A A748$122.01$160.00
0800Pipe culvert headwall-18 inEACH A A1$2,060.00$2,500.00
0810Pipe culvert headwall-42 inEACH A A2$5,150.00$4,000.00
0820Remove pipeLF A A30$26.12$40.00
0830Sloped box outlet type 1-18 inEACH A A5$2,800.00$3,000.00
0840Sloped and parallel headwall-12 inEACH A A1$2,200.00$2,750.00
0850S & F box inlet-outlet-18 inEACH A A2$3,500.00$3,000.00
0860Drop box inlet type 1EACH A A2$6,000.00$8,000.00
0870Drop box inlet type 13GEACH A A6$5,700.00$3,750.00
0880Remove drop box inletEACH A A1$1,005.56$900.00
0890Manhole type AEACH A A3$3,500.00$4,000.00
0900Fabric-geotextile class 2 for pipeSQYD A A4,076$2.00$2.00
0910Remove headwallEACH A A2$373.78$750.00
0920Drainage junction box TY BEACH A A1$5,000.00$4,000.00
0930Pipeline inspectionLF A A1,275$2.35$2.35
0940PVC fold and form pipe liner-18 inLF A A180$137.54$193.10
0950Remove headwallEACH A A2$425.00$425.00
0960Structure excav-solid rockCUYD A A13$125.00$125.00
0970Foundation preparationLS A A1$7,500.00$7,500.00
0980Concrete-class ACUYD A A38.20$2,162.00$2,162.00
0990Steel reinforcementLB A A4,030$1.90$1.90
1000S encasement steel open cut range 1LF A A80$489.00$950.00
1010S encasement steel open cut range 1LF A A50$492.00$990.00
1020S lateral short side 04 inchEACH A A1$1,660.00$14,000
1030S manholeEACH A A1$7,510.00$24,000
1040S manholeEACH A A1$8,275.00$28,000
1050S manholeEACH A A2$6,615.00$14,000
1060S manholeEACH A A1$6,460.00$16,000
1070S manhole abandon/removeEACH A A4$1,555.00$2,000.00
1080S pipe PVC 08 inchLF A A139$124.00$190.00
1090S pipe PVC 10 inchLF A A102$108.00$198.00
1100Topsoil and seeding of trenchesLF A A241$15.00$20.00
1110SBM alum sheet signs .080 inSQFT A A307.45$46.21$46.21
1120SBM alum sheet signs .125 inSQFT A A62$47.86$47.86
1130Steel post type 1LF A A626$32.03$32.03
1140Steel post mile markersEACH A A2$432.56$432.56
1150Class A concrete for signsCUYD A A2.50$1,887.68$1,887.68
1160GMSS type DEACH A A5$369.77$369.77
1170Install LED signEACH A A4$985.23$5,163.14
1180W cap existing mainEACH A A3$3,300.00$2,000.00
1190W cap existing mainEACH A A1$3,385.00$3,000.00
1200W cap existing mainEACH A A1$3,500.00$4,000.00
1210W directional boreLF A A62$129.00$150.00
1220W encasement steel bored range 1LF A A120$365.00$375.00
1230W encasement steel bored range 1LF A A100$374.00$420.00
1240W encasement steel bored range 1LF A A60$570.00$470.00
1250W encasement steel open cut range 1LF A A30$264.00$300.00
1260W encasement steel open cut range 1LF A A55$282.00$370.00
1270W fire hydrant assemblyEACH A A2$9,875.00$12,000
1280W fire hydrant relocateEACH A A1$5,105.00$6,000.00
1290W fire hydrant removeEACH A A3$830.00$3,000.00
1300W meter relocateEACH A A4$9,550.00$10,000
1310W meter relocateEACH A A1$4,435.00$4,000.00
1320W meter relocateEACH A A6$2,190.00$2,000.00
1330W pipe ductile iron 04 inchLF A A334$110.00$107.00
1340W pipe PVC 04 inchLF A A1,741$48.00$67.00
1350W pipe PVC 04 inchLF A A325$44.00$75.00
1360W pipe PVC 06 inchLF A A2,550$54.00$72.00
1370W pipe PVC 06 inchLF A A225$64.00$81.00
1380W pipe PVC 08 inchLF A A1,840$62.00$80.00
1390W pipe PVC 08 inchLF A A70$106.00$105.00
1400W tapping sleeve and valve size 1EACH A A1$8,610.00$8,000.00
1410W tie-in 04 inchEACH A A3$3,640.00$2,000.00
1420W tie-in 06 inchEACH A A3$3,850.00$3,000.00
1430W tie-in 08 inchEACH A A2$4,115.00$4,000.00
1440W valve 04 inchEACH A A5$2,045.00$2,000.00
1450W valve 06 inchEACH A A5$2,620.00$3,000.00
1460W valve 08 inchEACH A A1$3,660.00$4,000.00
1470W valve cut-in 06 inchEACH A A1$4,625.00$8,000.00
1480W meter specialEACH A A1$8,360.00$6,000.00
1490W meter specialEACH A A2$1,270.00$1,200.00
1500W blowoff assemblyEACH A A2$4,735.00$3,000.00
1510W valve box removeEACH A A12$460.00$100.00
1520Pavement repairSQYD A A110$109.00$106.00
1530Topsoil and seeding of trenchesLF A A6,393$4.00$6.00
1540Special ditch crossing protectionLF A A25$124.00$100.00
1550MobilizationLS A A1$229,103$432,000
1560DemobilizationLS A A1$111,263$139,635
KYTC contract 25-1113: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of August 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy