KYTC contract 25-1119 bid tabulation
ASPHALT PAVEMENT & ROADWAY REHAB US 421. Let by Kentucky Transportation Cabinet on October 23, 2025. 1 bid received; low bid $5,299,557 by Mountain Enterprises Inc, -4.5% against the engineer's estimate of $5,547,410.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 OCT 2025
- Pay items
- 70
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mountain Enterprises Inc | $5,299,557 | Low | -4.0% |
Engineer's estimate: $5,547,410.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Enterprises Inc |
|---|---|---|---|---|
| 0010 | Asphalt seal aggregate | TON A A | 127 | $103.75 |
| 0020 | Asphalt seal coat | TON A A | 15 | $725.00 |
| 0030 | Leveling & wedging PG76-22 | TON A A | 1,500 | $140.25 |
| 0040 | CL3 asph base 1.00D PG64-22 | TON A A | 8,915 | $121.75 |
| 0050 | CL2 asph base 0.75D PG64-22 | TON A A | 2,019 | $121.75 |
| 0060 | CL3 asph base 0.75D PG76-22 | TON A A | 7,378 | $129.75 |
| 0070 | CL2 asph surf 0.38D PG64-22 | TON A A | 1,350 | $140.25 |
| 0080 | CL3 asph surf 0.38A PG76-22 | TON A A | 4,611 | $159.75 |
| 0090 | Asphalt pave milling & texturing | TON A A | 22,142 | $19.15 |
| 0100 | Asphalt material for tack non-tracking | TON A A | 44 | $660.00 |
| 0110 | Standard header curb | LF A A | 30 | $101.25 |
| 0120 | Delineator for guardrail mono directional white | EACH A A | 118 | $17.87 |
| 0130 | Barricade-type III | EACH A A | 4 | $215.00 |
| 0140 | Embankment in place | CUYD A A | 32 | $189.50 |
| 0150 | Guardrail terminal section no 1 | EACH A A | 2 | $90.16 |
| 0160 | Guardrail end treatment type 1 | EACH A A | 4 | $3,532.73 |
| 0170 | Guardrail end treatment type 2M | EACH A A | 6 | $1,899.86 |
| 0180 | Remove guardrail | LF A A | 5,887.50 | $4.38 |
| 0190 | Channel lining class II | TON A A | 30 | $127.75 |
| 0200 | Temporary signs | SQFT A A | 3,000 | $14.85 |
| 0210 | Maintain & control traffic | LS A A | 1 | $106,625 |
| 0220 | Truck mounted attenuator | EACH A A | 2 | $14,250 |
| 0230 | Portable changeable message sign | EACH A A | 4 | $2,700.00 |
| 0240 | Mobilization for mill & text | LS A A | 1 | $4,800.00 |
| 0250 | Shouldering | LF A A | 8,184 | $9.50 |
| 0260 | Sidewalk-4 in concrete | SQYD A A | 14 | $375.00 |
| 0270 | Arrow panel | EACH A A | 2 | $2,250.00 |
| 0280 | Initial fertilizer | TON A A | 0.01 | $1,748.00 |
| 0290 | Maintenance fertilizer | TON A A | 0.01 | $1,748.00 |
| 0300 | Seeding and protection | SQYD A A | 97 | $5.02 |
| 0310 | Pave striping-temp paint-6 in | LF A A | 49,104 | $0.30 |
| 0320 | Pave striping-thermo-6 in W | LF A A | 21,455 | $1.30 |
| 0330 | Pave striping-thermo-6 in Y | LF A A | 14,476 | $1.30 |
| 0340 | Pave marking-R/R xbucks 16 in | LF A A | 85 | $8.00 |
| 0350 | Pave marking-thermo X-walk-12 in | LF A A | 1,115 | $7.00 |
| 0360 | Pave marking-thermo stop bar-24IN | LF A A | 852 | $10.00 |
| 0370 | Pave marking-thermo curv arrow | EACH A A | 22 | $125.00 |
| 0380 | Pave marking-thermo comb arrow | EACH A A | 2 | $150.00 |
| 0390 | Inlaid pavement marker-B W/R | EACH A A | 195 | $38.00 |
| 0400 | Inlaid pavement marker-B Y/R | EACH A A | 181 | $38.00 |
| 0410 | Fuel adjustment | DOLL A A | 37,782 | $1.00 |
| 0420 | Asphalt adjustment | DOLL A A | 94,898 | $1.00 |
| 0430 | Object marker TY 3 | EACH A A | 4 | $46.00 |
| 0440 | Replace grate | EACH A A | 1 | $1,575.00 |
| 0450 | Shoulder milling/trenching | SQYD A A | 12,236 | $10.95 |
| 0460 | Reconstruct curb box inlet | EACH A A | 5 | $4,700.00 |
| 0470 | G/R steel W beam-S face (7 FT post) | LF A A | 5,600 | $30.08 |
| 0480 | Water blasting existing stripe | LF A A | 16,368 | $0.75 |
| 0490 | Detectable warnings | SQFT A A | 17 | $107.25 |
| 0500 | Pave marking-thermo dotted lane exten | LF A A | 408 | $7.00 |
| 0510 | Pave mount infrared temp equipment | SF A A | 1,729,647 | $0.02 |
| 0520 | Remove signal equipment | EACH A A | 3 | $4,526.50 |
| 0530 | Thrie beam guardrail transition TL-2 | EACH A A | 6 | $3,036.05 |
| 0540 | Install radar presence detector type A | EACH A A | 3 | $1,200.00 |
| 0550 | Portable queue warning alert system | MONT A A | 7 | $1,537.00 |
| 0560 | Queue warning PCMS | MONT A A | 42 | $742.00 |
| 0570 | Queue warning portable radar sensors | MONT A A | 42 | $291.50 |
| 0580 | Connected arrow panel | MONT A A | 6 | $2,750.00 |
| 0590 | Conduit-1 1/4 in | LF A A | 90 | $7.15 |
| 0600 | Conduit-2 in | LF A A | 35 | $9.95 |
| 0610 | Trenching and backfilling | LF A A | 110 | $10.20 |
| 0620 | Piezoelectric sensor | EACH A A | 4 | $1,600.00 |
| 0630 | Loop wire | LF A A | 2,650 | $0.25 |
| 0640 | Loop saw slot and fill | LF A A | 580 | $8.00 |
| 0650 | Galvanized steel cabinet | EACH A A | 2 | $2,500.00 |
| 0660 | Wood post | EACH A A | 5 | $500.00 |
| 0670 | Electrical junction box type A | EACH A A | 2 | $1,800.00 |
| 0680 | Electrical junction box-10 X 8 X 4 | EACH A A | 1 | $1,000.00 |
| 0690 | Mobilization | LS A A | 1 | $229,000 |
| 0700 | Demobilization | LS A A | 1 | $78,240 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way