KYTC contract 25-1900 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY 90 HAPPY VALLEY ROAD MAJOR WIDENING. Let by Kentucky Transportation Cabinet on June 5, 2025. 2 bids received; low bid $6,626,681 by Scotty'S Contracting & Stone LLC, -20% against the engineer's estimate of $8,258,004.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 05 JUN 2025
- Pay items
- 126
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $6,626,681 | Low | -20% |
| 2 | Cleary Construction Inc | $7,760,000 | +17% | -6.0% |
Engineer's estimate: $8,258,004.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 14,683 | $26.56 | $34.00 |
| 0020 | Traffic bound base | TON A A | 340 | $30.49 | $50.00 |
| 0030 | Crushed aggregate size no 2 | TON A A | 19,421 | $25.73 | $30.00 |
| 0040 | Asphalt seal aggregate | TON A A | 275 | $132.76 | $105.00 |
| 0050 | Asphalt seal coat | TON A A | 33 | $816.93 | $1,200.00 |
| 0060 | Leveling & wedging PG64-22 | TON A A | 1,360 | $97.19 | $95.00 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 1,556 | $75.21 | $92.00 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 4,837 | $75.21 | $92.00 |
| 0090 | CL3 asph base 0.75D PG64-22 | TON A A | 3,748 | $81.51 | $85.00 |
| 0100 | CL2 asph surf 0.38D PG64-22 | TON A A | 1,841 | $102.93 | $93.00 |
| 0110 | CL3 asph surf 0.38B PG64-22 | TON A A | 7,192 | $102.93 | $93.00 |
| 0120 | Fabric-geotextile class 1 | SQYD A A | 28,434 | $2.19 | $2.15 |
| 0130 | Fabric-geotextile class 1A | SQYD A A | 34,002 | $3.24 | $3.30 |
| 0140 | Mobilization for mill & text | LS A A | 1 | $4,846.66 | $3,000.00 |
| 0150 | Asphalt pave milling & texturing | TON A A | 802 | $54.39 | $55.85 |
| 0160 | Joint adhesive | LF A A | 6,000 | $1.00 | $1.00 |
| 0170 | Longitudinal edge key | LF A A | 12,797 | $2.49 | $2.06 |
| 0180 | Asphalt material for tack non-tracking | TON A A | 72 | $568.62 | $856.83 |
| 0185 | Void reducing asph membrane | LF A A | 81,825 | $2.75 | $2.90 |
| 0190 | Perforated pipe-4 in | LF A A | 70 | $52.31 | $36.25 |
| 0200 | Non-perforated pipe-4 in | LF A A | 24 | $52.31 | $37.75 |
| 0210 | Perf pipe headwall TY 3-4 in | EACH A A | 2 | $952.62 | $1,850.00 |
| 0220 | Perf pipe headwall TY 4-4 in | EACH A A | 1 | $952.62 | $1,850.00 |
| 0230 | Island header curb type 2 | LF A A | 64 | $60.00 | $143.34 |
| 0240 | Delineator for guardrail BI directional white | EACH A A | 206 | $13.25 | $13.25 |
| 0250 | Barricade-type III | EACH A A | 10 | $313.36 | $159.00 |
| 0260 | Temp ditch | LF A A | 6,136 | $0.01 | $2.50 |
| 0270 | Clean temp ditch | LF A A | 3,068 | $0.01 | $2.50 |
| 0280 | Roadway excavation | CUYD A A | 30,601 | $15.38 | $18.00 |
| 0290 | Granular embankment | CUYD A A | 1,112 | $19.92 | $60.00 |
| 0300 | Guardrail-steel W beam-S face | LF A A | 1,909 | $28.83 | $28.83 |
| 0310 | Guardrail terminal section no 1 | EACH A A | 29 | $82.46 | $82.46 |
| 0320 | Guardrail end treatment type 1 | EACH A A | 30 | $3,252.24 | $3,252.24 |
| 0330 | Guardrail end treatment type 7 | EACH A A | 7 | $1,842.34 | $1,842.34 |
| 0340 | Remove guardrail | LF A A | 18,162 | $2.67 | $2.67 |
| 0350 | Right-of-way monument type 1 | EACH A A | 43 | $221.97 | $126.62 |
| 0360 | Right-of-way monument type 1A | EACH A A | 1 | $221.97 | $126.62 |
| 0370 | Witness post | EACH A A | 37 | $140.84 | $110.33 |
| 0380 | Channel lining class II | TON A A | 3,871 | $43.12 | $57.75 |
| 0390 | Channel lining class III | TON A A | 226 | $64.91 | $73.50 |
| 0400 | Clearing and grubbing | LS A A | 1 | $66,093 | $215,000 |
| 0410 | Temporary signs | SQFT A A | 655 | $7.61 | $7.42 |
| 0420 | Fabric-geotextile class 1 | SQYD A A | 8,073 | $2.91 | $2.25 |
| 0430 | Fabric-geotextile class 2 | SQYD A A | 1,667 | $2.58 | $2.30 |
| 0440 | Maintain & control traffic | LS A A | 1 | $213,094 | $375,000 |
| 0450 | Portable changeable message sign | EACH A A | 4 | $7,976.50 | $5,194.00 |
| 0460 | Safeloading | CUYD A A | 5.60 | $650.00 | $1,000.00 |
| 0470 | Shoulder rumble strips | LF A A | 32,448 | $0.17 | $0.20 |
| 0480 | Temp silt fence | LF A A | 6,136 | $4.12 | $3.00 |
| 0490 | Silt trap type A | EACH A A | 30 | $164.48 | $300.00 |
| 0500 | Silt trap type B | EACH A A | 30 | $164.48 | $300.00 |
| 0510 | Silt trap type C | EACH A A | 30 | $82.25 | $300.00 |
| 0520 | Clean silt trap type A | EACH A A | 30 | $0.01 | $25.00 |
| 0530 | Clean silt trap type B | EACH A A | 30 | $0.01 | $25.00 |
| 0540 | Clean silt trap type C | EACH A A | 30 | $0.01 | $25.00 |
| 0550 | Staking | LS A A | 1 | $48,942 | $175,000 |
| 0560 | Trim & remove trees & brush | LF A A | 10,980 | $19.90 | $13.70 |
| 0570 | Erosion control blanket | SQYD A A | 3,195 | $1.85 | $2.45 |
| 0580 | Temp mulch | SQYD A A | 96,280 | $0.25 | $0.33 |
| 0590 | Temp seeding and protection | SQYD A A | 72,206 | $0.35 | $0.35 |
| 0600 | Initial fertilizer | TON A A | 8.70 | $1,500.00 | $1,492.84 |
| 0610 | Maintenance fertilizer | TON A A | 5.20 | $1,500.00 | $1,492.84 |
| 0620 | Seeding and protection | SQYD A A | 163,644 | $0.42 | $0.60 |
| 0630 | Agricultural limestone | TON A A | 104 | $85.00 | $67.38 |
| 0640 | Pave striping-temp paint-4 in | LF A A | 121,625 | $0.31 | $0.31 |
| 0650 | Pave striping-thermo-6 in W | LF A A | 49,607 | $1.35 | $1.35 |
| 0660 | Pave striping-thermo-6 in Y | LF A A | 56,828 | $1.35 | $1.35 |
| 0670 | Pave striping-thermo-12 in Y | LF A A | 56 | $9.00 | $9.00 |
| 0680 | Pave striping-temp rem tape-B | LF A A | 3,280 | $3.00 | $3.00 |
| 0690 | Pave striping-temp rem tape-W | LF A A | 2,275 | $3.00 | $3.00 |
| 0700 | Pave striping-temp rem tape-Y | LF A A | 2,960 | $3.00 | $3.00 |
| 0710 | Pave marking-thermo X-walk-6 in | LF A A | 258 | $3.00 | $3.00 |
| 0720 | Pave marking-thermo X-walk-12 in | LF A A | 240 | $7.00 | $7.00 |
| 0730 | Pave marking-thermo stop bar-24IN | LF A A | 99 | $15.00 | $15.00 |
| 0740 | Pave marking-thermo cross-hatch | SQFT A A | 2,811 | $6.00 | $6.00 |
| 0750 | Pave marking-thermo curv arrow | EACH A A | 39 | $150.00 | $150.00 |
| 0760 | Pave marking-thermo merge arrow | EACH A A | 12 | $350.00 | $350.00 |
| 0770 | Fuel adjustment | DOLL A A | 28,214 | $1.00 | $1.00 |
| 0780 | Asphalt adjustment | DOLL A A | 80,280 | $1.00 | $1.00 |
| 0790 | Object marker TY 3 | EACH A A | 30 | $35.25 | $35.25 |
| 0800 | Pave mark-paint arrows | EACH A A | 5 | $100.00 | $100.00 |
| 0810 | Centerline rumble strips | LF A A | 12,397 | $0.25 | $0.30 |
| 0820 | G/R steel W beam-S face (7 FT post) | LF A A | 15,617.50 | $29.98 | $29.98 |
| 0830 | Water blasting existing stripe | LF A A | 9,735 | $0.35 | $0.80 |
| 0840 | Pave mark temp paint stop bar-24 in | LF A A | 69 | $5.00 | $5.00 |
| 0850 | Pave mark thermo chevron | SQFT A A | 209 | $6.00 | $6.00 |
| 0860 | Pipeline inspection | LF A A | 587 | $3.41 | $3.41 |
| 0870 | Thrie beam guardrail transition TL-3 | EACH A A | 4 | $4,461.30 | $3,261.30 |
| 0880 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.00 |
| 0890 | Entrance pipe-15 in | LF A A | 583 | $100.24 | $103.00 |
| 0900 | Entrance pipe-18 in | LF A A | 106 | $104.38 | $105.00 |
| 0910 | Entrance pipe-24 in | LF A A | 40 | $204.28 | $148.00 |
| 0920 | Culvert pipe-18 in | LF A A | 32 | $250.37 | $175.00 |
| 0930 | Culvert pipe-24 in | LF A A | 143 | $182.02 | $180.00 |
| 0940 | Culvert pipe-36 in | LF A A | 70 | $203.01 | $215.00 |
| 0950 | Pipe culvert headwall-18 in | EACH A A | 1 | $2,500.00 | $2,900.00 |
| 0960 | Pipe culvert headwall-24 in | EACH A A | 1 | $2,600.00 | $3,100.00 |
| 0970 | Remove pipe | LF A A | 136 | $17.71 | $150.00 |
| 0980 | Metal end section TY 1-15 in | EACH A A | 18 | $1,700.00 | $1,600.00 |
| 0990 | Metal end section TY 1-18 in | EACH A A | 2 | $2,800.00 | $2,500.00 |
| 1000 | Metal end section TY 1-24 in | EACH A A | 2 | $4,800.00 | $3,225.00 |
| 1010 | Metal end section TY 3-18 in | EACH A A | 1 | $1,500.00 | $2,100.00 |
| 1020 | Metal end section TY 3-24 in | EACH A A | 6 | $1,800.00 | $2,310.00 |
| 1030 | Metal end section TY 3-36 in | EACH A A | 3 | $9,000.00 | $5,200.00 |
| 1040 | Metal end section TY 4-24 in | EACH A A | 1 | $5,800.00 | $3,200.00 |
| 1050 | S & F box inlet-outlet-24 in | EACH A A | 2 | $2,500.00 | $4,700.00 |
| 1060 | Drop box inlet type 1 | EACH A A | 3 | $6,000.00 | $7,900.00 |
| 1070 | Drop box inlet type 6F | EACH A A | 1 | $9,500.00 | $11,950 |
| 1080 | Remove inlet | EACH A A | 5 | $605.37 | $750.00 |
| 1090 | Fabric-geotextile class 2 for pipe | SQYD A A | 253 | $2.00 | $2.00 |
| 1100 | Remove headwall | EACH A A | 10 | $727.66 | $750.00 |
| 1110 | Concrete-class A | CUYD A A | 16.20 | $650.00 | $745.00 |
| 1120 | Bore and jack pipe-24 in | LF A A | 111 | $632.82 | $800.00 |
| 1130 | Remove concrete masonry | CUYD A A | 0.60 | $1,000.00 | $12,456 |
| 1140 | Structure excav-solid rock | CUYD A A | 4 | $500.00 | $258.34 |
| 1150 | Foundation preparation | LS A A | 1 | $7,000.00 | $15,000 |
| 1160 | Concrete-class A | CUYD A A | 30 | $1,560.00 | $2,000.00 |
| 1170 | Steel reinforcement | LB A A | 3,875 | $2.00 | $3.00 |
| 1180 | SBM alum sheet signs .080 in | SQFT A A | 322 | $45.91 | $45.91 |
| 1190 | SBM alum sheet signs .125 in | SQFT A A | 40 | $47.54 | $47.54 |
| 1200 | Steel post type 1 | LF A A | 561 | $21.03 | $21.03 |
| 1210 | Steel post mile markers | EACH A A | 2 | $285.41 | $285.41 |
| 1220 | Remove & relocate signs | EACH A A | 4 | $350.99 | $350.99 |
| 1230 | Barcode sign inventory | EACH A A | 54 | $26.66 | $26.66 |
| 1240 | Mobilization | LS A A | 1 | $169,910 | $358,000 |
| 1250 | Demobilization | LS A A | 1 | $96,213 | $109,016 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of June 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.