KYTC contract 25-1902 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE GILEAD CHURCH ROAD (KY 1136). Let by Kentucky Transportation Cabinet on July 24, 2025. 3 bids received; low bid $20,464,537 by Louisville Paving Company Inc, -26% against the engineer's estimate of $27,493,766.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 195
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Louisville Paving Company Inc | $20,464,537 | Low | -26% |
| 2 | Scotty'S Contracting & Stone LLC | $21,257,763 | +4.0% | -23% |
| 3 | Cleary Construction Inc | $22,598,000 | +10% | -18% |
Engineer's estimate: $27,493,766.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louisville Paving Company Inc | 2. Scotty'S Contracting & Stone LLC | 3. Cleary Construction Inc |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 53,721 | $30.75 | $32.94 | $32.50 |
| 0020 | Cement stabilized roadbed | SQYD A A | 77,598 | $3.40 | $3.45 | $3.50 |
| 0030 | Traffic bound base | TON A A | 600 | $56.12 | $36.72 | $45.00 |
| 0040 | Asphalt seal aggregate | TON A A | 308.90 | $103.10 | $146.48 | $118.00 |
| 0050 | Asphalt seal coat | TON A A | 37.60 | $885.56 | $878.72 | $1,160.00 |
| 0060 | Leveling & wedging PG64-22 | TON A A | 482 | $99.00 | $134.94 | $140.00 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 47,678 | $86.00 | $89.45 | $100.00 |
| 0080 | CL2 asph surf 0.38D PG64-22 | TON A A | 7,592 | $99.00 | $109.33 | $115.00 |
| 0090 | Asphalt curing seal | TON A A | 78 | $768.61 | $774.04 | $800.00 |
| 0100 | JPC pavement-10 in | SQYD A A | 455 | $143.72 | $143.72 | $143.72 |
| 0110 | Cement | TON A A | 1,481 | $220.00 | $250.00 | $250.00 |
| 0120 | Asphalt pave milling & texturing | TON A A | 83 | $145.36 | $109.48 | $160.00 |
| 0130 | Sand for blotter | TON A A | 194 | $1.00 | $25.07 | $40.00 |
| 0140 | Asphalt material for tack non-tracking | TON A A | 73 | $0.01 | $689.40 | $700.00 |
| 0150 | Crushed aggregate size no 2 | TON A A | 35,500 | $27.25 | $29.25 | $32.00 |
| 0160 | Flume inlet type 1 | EACH A A | 1 | $6,816.61 | $6,300.00 | $6,816.61 |
| 0170 | Flume inlet type 2 | EACH A A | 14 | $5,492.58 | $6,000.00 | $5,492.58 |
| 0180 | Adjust manhole | EACH A A | 1 | $2,382.05 | $2,000.00 | $1,200.00 |
| 0190 | Standard curb and gutter mod | LF A A | 836 | $35.02 | $35.02 | $35.02 |
| 0200 | Lip curb and gutter mod | LF A A | 390 | $40.47 | $40.47 | $40.47 |
| 0210 | Standard integral curb | LF A A | 296 | $26.64 | $26.64 | $26.64 |
| 0220 | Standard header curb | LF A A | 38 | $111.88 | $111.89 | $111.89 |
| 0230 | Mountable median type 6A | SQYD A A | 384 | $136.67 | $136.67 | $136.67 |
| 0240 | Delineator for guardrail BI directional white | EACH A A | 110 | $15.81 | $15.00 | $20.00 |
| 0250 | Barricade-type III | EACH A A | 30 | $100.00 | $256.39 | $132.50 |
| 0260 | Temp ditch | LF A A | 8,750 | $1.77 | $0.01 | $1.00 |
| 0270 | Clean temp ditch | LF A A | 4,375 | $1.77 | $0.01 | $0.01 |
| 0280 | Roadway excavation | CUYD A A | 146,845 | $8.25 | $8.24 | $6.00 |
| 0290 | Granular embankment | CUYD A A | 5,000 | $54.43 | $48.22 | $58.00 |
| 0300 | Embankment in place | CUYD A A | 155,773 | $6.50 | $12.14 | $14.95 |
| 0310 | Water | MGAL A A | 300 | $0.01 | $0.01 | $0.01 |
| 0320 | Guardrail-steel W beam-S face | LF A A | 4,550 | $30.22 | $27.50 | $40.00 |
| 0330 | Guardrail terminal section no 1 | EACH A A | 11 | $77.21 | $90.00 | $150.00 |
| 0340 | Guardrail end treatment type 1 | EACH A A | 12 | $3,609.53 | $3,300.00 | $4,500.00 |
| 0350 | Remove guardrail | LF A A | 1,024 | $3.15 | $4.00 | $3.00 |
| 0360 | Remove guardrail end treatment | EACH A A | 3 | $239.74 | $500.00 | $150.00 |
| 0370 | Temp guardrail | LF A A | 3,500 | $18.95 | $13.50 | $25.00 |
| 0380 | Right-of-way monument type 1 | EACH A A | 119 | $178.77 | $215.00 | $150.00 |
| 0390 | Witness post | EACH A A | 30 | $162.61 | $118.25 | $150.00 |
| 0400 | Fill and cap sinkhole | EACH A A | 5 | $14,341 | $3,892.58 | $7,000.00 |
| 0410 | Channel lining class II | TON A A | 5,784 | $53.89 | $51.00 | $56.00 |
| 0420 | Channel lining class III | TON A A | 4,287 | $56.16 | $60.72 | $60.00 |
| 0430 | Clearing and grubbing | LS A A | 1 | $225,000 | $36,000 | $192,000 |
| 0440 | Temporary signs | SQFT A A | 750 | $5.00 | $7.65 | $7.42 |
| 0450 | Edge key | LF A A | 290 | $15.52 | $61.69 | $32.10 |
| 0460 | Fabric-geotextile class 1 | SQYD A A | 16,230 | $1.55 | $2.16 | $2.50 |
| 0470 | Fabric-geotextile class 2 | SQYD A A | 45,728 | $1.34 | $2.00 | $2.25 |
| 0480 | Maintain & control traffic | LS A A | 1 | $625,000 | $618,195 | $200,000 |
| 0490 | Diversions (by-pass detours) | LS A A | 1 | $10,000 | $49,556 | $40,000 |
| 0500 | Portable changeable message sign | EACH A A | 12 | $7,632.00 | $569.75 | $7,420.00 |
| 0510 | Mobilization for mill & text | LS A A | 1 | $2,500.00 | $4,130.42 | $3,500.00 |
| 0520 | Safeloading | CUYD A A | 48 | $623.88 | $500.00 | $325.00 |
| 0530 | Shoulder rumble strips | LF A A | 31,001 | $0.28 | $0.14 | $0.18 |
| 0540 | Temp silt fence | LF A A | 8,750 | $2.00 | $2.96 | $2.50 |
| 0550 | Silt trap type A | EACH A A | 107 | $0.01 | $0.01 | $350.00 |
| 0560 | Silt trap type B | EACH A A | 107 | $455.89 | $354.56 | $180.00 |
| 0570 | Silt trap type C | EACH A A | 107 | $0.01 | $176.10 | $300.00 |
| 0580 | Clean silt trap type A | EACH A A | 107 | $0.01 | $0.01 | $1.00 |
| 0590 | Clean silt trap type B | EACH A A | 107 | $0.01 | $0.01 | $1.00 |
| 0600 | Clean silt trap type C | EACH A A | 107 | $0.01 | $0.01 | $1.00 |
| 0610 | Staking | LS A A | 1 | $105,516 | $187,050 | $175,000 |
| 0620 | Arrow panel | EACH A A | 8 | $5,088.00 | $398.83 | $2,544.00 |
| 0630 | Erosion control blanket | SQYD A A | 185,751 | $2.05 | $1.85 | $1.68 |
| 0640 | Temp mulch | SQYD A A | 344,156 | $0.20 | $0.25 | $0.28 |
| 0650 | Temp seeding and protection | SQYD A A | 258,117 | $0.25 | $0.35 | $0.31 |
| 0660 | Initial fertilizer | TON A A | 24 | $850.00 | $1,500.00 | $994.00 |
| 0670 | Maintenance fertilizer | TON A A | 15 | $850.00 | $1,500.00 | $994.00 |
| 0680 | Seeding and protection | SQYD A A | 270,732 | $0.30 | $0.42 | $0.46 |
| 0690 | Sodding | SQYD A A | 883 | $8.25 | $8.50 | $6.10 |
| 0700 | Agricultural limestone | TON A A | 282 | $80.00 | $75.00 | $98.00 |
| 0710 | Topsoil furnished and placed | CUYD A A | 100 | $99.64 | $73.74 | $100.00 |
| 0720 | Pave striping-temp paint-4 in | LF A A | 3,500 | $0.30 | $0.30 | $0.30 |
| 0730 | Pave striping-temp paint-6 in | LF A A | 25,000 | $0.33 | $0.33 | $0.33 |
| 0740 | Pave striping-perm paint-4 in | LF A A | 8,509 | $0.32 | $0.32 | $0.32 |
| 0750 | Pave striping-perm paint-6 in | LF A A | 58,841 | $0.34 | $0.34 | $0.34 |
| 0760 | Pave striping-thermo-6 in W | LF A A | 2,964 | $1.40 | $1.40 | $1.40 |
| 0770 | Pave striping-thermo-6 in Y | LF A A | 3,352 | $1.40 | $1.40 | $1.40 |
| 0780 | Pave marking-thermo R 6 FT | EACH A A | 4 | $150.00 | $150.00 | $150.00 |
| 0790 | Pave marking-R/R xbucks 16 in | LF A A | 84 | $12.00 | $12.00 | $12.00 |
| 0800 | Pave marking-thermo stop bar-24IN | LF A A | 204 | $14.00 | $14.00 | $14.00 |
| 0810 | Pave marking-thermo cross-hatch | SQFT A A | 746 | $7.00 | $7.00 | $7.00 |
| 0820 | Pave marking-thermo curv arrow | EACH A A | 19 | $130.00 | $130.00 | $130.00 |
| 0830 | Pave marking-thermo comb arrow | EACH A A | 6 | $250.00 | $250.00 | $250.00 |
| 0840 | Inlaid pavement marker-MW | EACH A A | 59 | $22.00 | $22.00 | $22.00 |
| 0850 | Inlaid pavement marker-by | EACH A A | 231 | $22.00 | $22.00 | $22.00 |
| 0860 | Fuel adjustment | DOLL A A | 176,747 | $1.00 | $1.00 | $1.00 |
| 0870 | Asphalt adjustment | DOLL A A | 217,409 | $1.00 | $1.00 | $1.00 |
| 0880 | Joint adhesive | LF A A | 1,434 | $1.55 | $3.00 | $3.00 |
| 0890 | Temporary pipe | LF A A | 250 | $98.61 | $55.32 | $115.00 |
| 0900 | Object marker TY 3 | EACH A A | 12 | $28.73 | $60.00 | $100.00 |
| 0910 | Centerline rumble strips | LF A A | 14,750 | $0.25 | $0.18 | $0.25 |
| 0920 | Sawcut pavement | LF A A | 1,434 | $2.66 | $1.84 | $1.33 |
| 0930 | Longitudinal edge key | LF A A | 1,434 | $6.28 | $13.87 | $7.49 |
| 0940 | Pave marking-thermo yield bar-36 in | LF A A | 68 | $40.00 | $40.00 | $40.00 |
| 0950 | Water blasting existing stripe | LF A A | 5,000 | $1.25 | $1.25 | $1.25 |
| 0960 | Pave mark-thermo-24 in Y | LF A A | 54 | $14.00 | $14.00 | $14.00 |
| 0970 | Turf reinforcement mat 1 | SQYD A A | 10,811 | $5.00 | $6.50 | $5.68 |
| 0980 | Standard barrier median TY 5-mod | SQYD A A | 540 | $151.35 | $151.35 | $151.35 |
| 0990 | Pave stripe-wet ref tape-6 in Y | LF A A | 1,144 | $10.00 | $10.00 | $10.00 |
| 1000 | Pave stripe-wet ref tape-6 in W | LF A A | 1,239 | $10.00 | $10.00 | $10.00 |
| 1010 | Pave marking-thermo dotted lane exten | LF A A | 154 | $4.00 | $4.00 | $4.00 |
| 1020 | Thrie beam guardrail transition TL-3 | EACH A A | 12 | $3,146.02 | $4,600.00 | $4,000.00 |
| 1030 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $0.01 | $1.00 |
| 1040 | Crushed aggregate size no 2 | TON A A | 29 | $233.87 | $31.02 | $35.00 |
| 1050 | Entrance pipe-15 in | LF A A | 212 | $90.00 | $71.23 | $70.00 |
| 1060 | Entrance pipe-24 in | LF A A | 470 | $102.00 | $88.70 | $100.00 |
| 1070 | Entrance pipe-30 in | LF A A | 84 | $124.00 | $128.69 | $110.00 |
| 1080 | Entrance pipe-24 in equiv | LF A A | 74 | $118.00 | $93.85 | $105.00 |
| 1090 | Entrance pipe-30 in equiv | LF A A | 63 | $142.00 | $138.86 | $125.00 |
| 1100 | Culvert pipe-15 in | LF A A | 86 | $96.00 | $116.04 | $95.00 |
| 1110 | Culvert pipe-18 in | LF A A | 371 | $92.00 | $164.04 | $90.00 |
| 1120 | Culvert pipe-24 in | LF A A | 1,268 | $85.00 | $146.86 | $105.00 |
| 1130 | Culvert pipe-30 in | LF A A | 172 | $107.00 | $169.38 | $200.00 |
| 1140 | Culvert pipe-18 in equiv | LF A A | 58 | $119.00 | $199.92 | $105.00 |
| 1150 | Culvert pipe-30 in equiv | LF A A | 61 | $166.00 | $260.17 | $140.00 |
| 1160 | Perforated pipe-4 in | LF A A | 10,962 | $26.52 | $8.12 | $22.00 |
| 1170 | Non-perforated pipe-4 in | LF A A | 5,144 | $27.34 | $10.43 | $23.00 |
| 1180 | Inspect & certify edge drain system | LS A A | 1 | $7,500.00 | $2,500.00 | $7,500.00 |
| 1190 | Perf pipe headwall TY 3-4 in | EACH A A | 29 | $1,177.47 | $726.09 | $750.00 |
| 1200 | Pipe culvert headwall-18 in | EACH A A | 2 | $1,700.00 | $2,618.10 | $3,000.00 |
| 1210 | Pipe culvert headwall-24 in | EACH A A | 2 | $2,000.00 | $2,727.50 | $3,200.00 |
| 1220 | Pipe culvert headwall-30 in | EACH A A | 2 | $7,000.00 | $4,127.25 | $3,750.00 |
| 1230 | Metal end section TY 3-18 in (equiv) | EACH A A | 2 | $1,400.00 | $1,868.66 | $2,500.00 |
| 1240 | Sloped box outlet type 1-15 in | EACH A A | 2 | $2,300.00 | $2,901.58 | $3,500.00 |
| 1250 | Sloped box outlet type 1-24 in | EACH A A | 17 | $3,000.00 | $4,150.95 | $3,750.00 |
| 1260 | S & F box inlet-outlet-18 in | EACH A A | 4 | $3,000.00 | $3,540.49 | $4,000.00 |
| 1270 | Cored hole drainage box con-4 in | EACH A A | 10 | $350.00 | $500.00 | $500.00 |
| 1280 | Fabric-geotextile class 2 for pipe | SQYD A A | 2,146 | $2.00 | $2.00 | $2.00 |
| 1290 | Entrance pipe-36 in | LF A A | 132 | $184.00 | $192.65 | $150.00 |
| 1300 | Metal end section TY 1-30 in (equiv) | EACH A A | 2 | $3,100.00 | $4,000.00 | $3,500.00 |
| 1310 | Pipeline inspection | LF A A | 1,809 | $2.35 | $3.45 | $2.35 |
| 1320 | Structure granular backfill | CUYD A A | 618.80 | $64.00 | $75.96 | $64.00 |
| 1330 | Armored edge for concrete | LF A A | 92.40 | $90.74 | $99.17 | $90.74 |
| 1340 | Foundation preparation | LS A A | 1 | $6,500.00 | $12,735 | $6,500.00 |
| 1350 | Cyclopean stone rip rap | TON A A | 917 | $58.00 | $44.21 | $58.00 |
| 1360 | Test piles | LF A A | 75 | $213.00 | $109.86 | $213.00 |
| 1370 | Piles-steel HP14X89 | LF A A | 698 | $104.40 | $107.46 | $104.40 |
| 1380 | Pile points-14 in | EACH A A | 22 | $195.00 | $195.30 | $195.00 |
| 1390 | Concrete-class A | CUYD A A | 121.30 | $686.00 | $790.23 | $686.00 |
| 1400 | Concrete-class AA | CUYD A A | 156.30 | $1,231.00 | $1,246.34 | $1,231.00 |
| 1410 | Steel reinforcement-epoxy coated | LB A A | 43,067 | $1.58 | $1.63 | $1.58 |
| 1420 | Precast PC box beam SB42 | LF A A | 480 | $536.70 | $597.34 | $536.70 |
| 1430 | Concrete sealing | SQFT A A | 8,426 | $1.65 | $2.40 | $1.65 |
| 1440 | Deck drain | EACH A A | 4 | $672.00 | $715.10 | $672.00 |
| 1450 | Rail system single slope - 40 in | LF A A | 195.90 | $190.00 | $189.41 | $190.00 |
| 1460 | Mobilization for concrete surf treatment | LS A A | 1 | $500.00 | $1,683.69 | $500.00 |
| 1470 | Structure granular backfill | CUYD A A | 703.50 | $64.00 | $91.02 | $64.00 |
| 1480 | Armored edge for concrete | LF A A | 137.10 | $90.74 | $87.72 | $90.74 |
| 1490 | Foundation preparation | LS A A | 1 | $11,500 | $10,843 | $11,500 |
| 1500 | Cyclopean stone rip rap | TON A A | 1,276 | $58.00 | $45.31 | $58.00 |
| 1510 | Test piles | LF A A | 61 | $215.00 | $111.12 | $215.00 |
| 1520 | Piles-steel HP14X89 | LF A A | 595 | $107.30 | $113.91 | $107.30 |
| 1530 | Pile points-14 in | EACH A A | 24 | $195.00 | $195.30 | $195.00 |
| 1540 | Concrete-class A | CUYD A A | 133.20 | $701.00 | $779.56 | $701.00 |
| 1550 | Concrete-class AA | CUYD A A | 218.30 | $1,089.00 | $995.31 | $1,089.00 |
| 1560 | Steel reinforcement-epoxy coated | LB A A | 56,613 | $1.58 | $1.61 | $1.58 |
| 1570 | Precast PC box beam SB42 | LF A A | 805.50 | $528.00 | $576.42 | $528.00 |
| 1580 | Concrete sealing | SQFT A A | 10,140 | $1.65 | $2.40 | $1.65 |
| 1590 | Deck drain | EACH A A | 8 | $672.00 | $715.10 | $672.00 |
| 1600 | Rail system single slope - 40 in | LF A A | 182.50 | $190.00 | $199.94 | $190.00 |
| 1610 | Mobilization for concrete surf treatment | LS A A | 1 | $500.00 | $1,683.69 | $500.00 |
| 1620 | Structure granular backfill | CUYD A A | 1,209 | $58.00 | $74.21 | $58.00 |
| 1630 | Armored edge for concrete | LF A A | 172 | $96.00 | $97.83 | $96.00 |
| 1640 | Foundation preparation | LS A A | 1 | $15,000 | $12,739 | $15,000 |
| 1650 | Cyclopean stone rip rap | TON A A | 1,356 | $48.00 | $45.31 | $48.00 |
| 1660 | Test piles | LF A A | 76 | $450.00 | $124.10 | $450.00 |
| 1670 | Pre-drilling for piles | LF A A | 420 | $384.00 | $269.60 | $384.00 |
| 1680 | Piles-steel HP14X117 | LF A A | 2,129 | $131.31 | $124.10 | $131.31 |
| 1690 | Pile points-14 in | EACH A A | 59 | $195.00 | $195.30 | $195.00 |
| 1700 | Concrete-class A | CUYD A A | 305.10 | $752.00 | $712.82 | $752.00 |
| 1710 | Concrete-class AA | CUYD A A | 192.30 | $1,200.00 | $1,154.96 | $1,200.00 |
| 1720 | Steel reinforcement-epoxy coated | LB A A | 59,449 | $1.56 | $1.66 | $1.56 |
| 1730 | Precast PC box beam SB42 | LF A A | 505.50 | $533.00 | $573.69 | $533.00 |
| 1740 | Concrete sealing | SQFT A A | 9,805 | $1.65 | $2.40 | $1.65 |
| 1750 | Deck drain | EACH A A | 4 | $672.00 | $715.10 | $672.00 |
| 1760 | Rail system single slope - 40 in | LF A A | 176.50 | $190.00 | $205.18 | $190.00 |
| 1770 | Mobilization for concrete surf treatment | LS A A | 1 | $500.00 | $1,683.69 | $500.00 |
| 1780 | Pole 40 FT MTG HT | EACH A A | 11 | $2,858.00 | $2,946.67 | $2,858.00 |
| 1790 | Bracket 8 FT | EACH A A | 8 | $602.00 | $658.66 | $602.00 |
| 1800 | Bracket 10 FT | EACH A A | 3 | $808.00 | $835.97 | $808.00 |
| 1810 | Pole base | EACH A A | 11 | $3,355.00 | $2,867.10 | $3,355.00 |
| 1820 | Transformer base | EACH A A | 11 | $1,557.00 | $1,641.20 | $1,557.00 |
| 1830 | Lighting control equipment | EACH A A | 1 | $34,740 | $27,986 | $34,740 |
| 1840 | Fused connector kit | EACH A A | 22 | $267.00 | $243.60 | $267.00 |
| 1850 | Trenching and backfilling | LF A A | 1,785 | $4.61 | $11.25 | $4.61 |
| 1860 | Wire-no. 12 | LF A A | 1,815 | $1.87 | $1.77 | $1.87 |
| 1870 | Pole 45 FT wooden | EACH A A | 1 | $2,055.00 | $1,543.69 | $2,055.00 |
| 1880 | Electrical junction box type A | EACH A A | 4 | $2,320.00 | $1,545.72 | $2,320.00 |
| 1890 | Bore and jack conduit | LF A A | 100 | $66.00 | $81.23 | $66.00 |
| 1900 | Wire-no. 10 | LF A A | 8,300 | $2.03 | $2.16 | $2.03 |
| 1910 | LED luminaire | EACH A A | 11 | $825.00 | $932.00 | $825.00 |
| 1920 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,670 | $6.95 | $6.12 | $6.95 |
| 1930 | PVC conduit-2 in-schedule 80 | LF A A | 340 | $9.67 | $8.43 | $9.67 |
| 1940 | Mobilization | LS A A | 1 | $924,312 | $568,726 | $1,038,000 |
| 1950 | Demobilization | LS A A | 1 | $287,150 | $305,300 | $339,568 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.