KYTC contract 25-1902 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE GILEAD CHURCH ROAD (KY 1136). Let by Kentucky Transportation Cabinet on July 24, 2025. 3 bids received; low bid $20,464,537 by Louisville Paving Company Inc, -26% against the engineer's estimate of $27,493,766.

Owner
Kentucky Transportation Cabinet
Letting
24 JUL 2025
Pay items
195
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Louisville Paving Company Inc$20,464,537Low-26%
2Scotty'S Contracting & Stone LLC$21,257,763+4.0%-23%
3Cleary Construction Inc$22,598,000+10%-18%
KYTC contract 25-1902: bids by rank

Engineer's estimate: $27,493,766.

Bid tabulation

LinePay itemUnitQuantity1. Louisville Paving Company Inc2. Scotty'S Contracting & Stone LLC3. Cleary Construction Inc
0010Crushed stone baseTON A A53,721$30.75$32.94$32.50
0020Cement stabilized roadbedSQYD A A77,598$3.40$3.45$3.50
0030Traffic bound baseTON A A600$56.12$36.72$45.00
0040Asphalt seal aggregateTON A A308.90$103.10$146.48$118.00
0050Asphalt seal coatTON A A37.60$885.56$878.72$1,160.00
0060Leveling & wedging PG64-22TON A A482$99.00$134.94$140.00
0070CL2 asph base 1.00D PG64-22TON A A47,678$86.00$89.45$100.00
0080CL2 asph surf 0.38D PG64-22TON A A7,592$99.00$109.33$115.00
0090Asphalt curing sealTON A A78$768.61$774.04$800.00
0100JPC pavement-10 inSQYD A A455$143.72$143.72$143.72
0110CementTON A A1,481$220.00$250.00$250.00
0120Asphalt pave milling & texturingTON A A83$145.36$109.48$160.00
0130Sand for blotterTON A A194$1.00$25.07$40.00
0140Asphalt material for tack non-trackingTON A A73$0.01$689.40$700.00
0150Crushed aggregate size no 2TON A A35,500$27.25$29.25$32.00
0160Flume inlet type 1EACH A A1$6,816.61$6,300.00$6,816.61
0170Flume inlet type 2EACH A A14$5,492.58$6,000.00$5,492.58
0180Adjust manholeEACH A A1$2,382.05$2,000.00$1,200.00
0190Standard curb and gutter modLF A A836$35.02$35.02$35.02
0200Lip curb and gutter modLF A A390$40.47$40.47$40.47
0210Standard integral curbLF A A296$26.64$26.64$26.64
0220Standard header curbLF A A38$111.88$111.89$111.89
0230Mountable median type 6ASQYD A A384$136.67$136.67$136.67
0240Delineator for guardrail BI directional whiteEACH A A110$15.81$15.00$20.00
0250Barricade-type IIIEACH A A30$100.00$256.39$132.50
0260Temp ditchLF A A8,750$1.77$0.01$1.00
0270Clean temp ditchLF A A4,375$1.77$0.01$0.01
0280Roadway excavationCUYD A A146,845$8.25$8.24$6.00
0290Granular embankmentCUYD A A5,000$54.43$48.22$58.00
0300Embankment in placeCUYD A A155,773$6.50$12.14$14.95
0310WaterMGAL A A300$0.01$0.01$0.01
0320Guardrail-steel W beam-S faceLF A A4,550$30.22$27.50$40.00
0330Guardrail terminal section no 1EACH A A11$77.21$90.00$150.00
0340Guardrail end treatment type 1EACH A A12$3,609.53$3,300.00$4,500.00
0350Remove guardrailLF A A1,024$3.15$4.00$3.00
0360Remove guardrail end treatmentEACH A A3$239.74$500.00$150.00
0370Temp guardrailLF A A3,500$18.95$13.50$25.00
0380Right-of-way monument type 1EACH A A119$178.77$215.00$150.00
0390Witness postEACH A A30$162.61$118.25$150.00
0400Fill and cap sinkholeEACH A A5$14,341$3,892.58$7,000.00
0410Channel lining class IITON A A5,784$53.89$51.00$56.00
0420Channel lining class IIITON A A4,287$56.16$60.72$60.00
0430Clearing and grubbingLS A A1$225,000$36,000$192,000
0440Temporary signsSQFT A A750$5.00$7.65$7.42
0450Edge keyLF A A290$15.52$61.69$32.10
0460Fabric-geotextile class 1SQYD A A16,230$1.55$2.16$2.50
0470Fabric-geotextile class 2SQYD A A45,728$1.34$2.00$2.25
0480Maintain & control trafficLS A A1$625,000$618,195$200,000
0490Diversions (by-pass detours)LS A A1$10,000$49,556$40,000
0500Portable changeable message signEACH A A12$7,632.00$569.75$7,420.00
0510Mobilization for mill & textLS A A1$2,500.00$4,130.42$3,500.00
0520SafeloadingCUYD A A48$623.88$500.00$325.00
0530Shoulder rumble stripsLF A A31,001$0.28$0.14$0.18
0540Temp silt fenceLF A A8,750$2.00$2.96$2.50
0550Silt trap type AEACH A A107$0.01$0.01$350.00
0560Silt trap type BEACH A A107$455.89$354.56$180.00
0570Silt trap type CEACH A A107$0.01$176.10$300.00
0580Clean silt trap type AEACH A A107$0.01$0.01$1.00
0590Clean silt trap type BEACH A A107$0.01$0.01$1.00
0600Clean silt trap type CEACH A A107$0.01$0.01$1.00
0610StakingLS A A1$105,516$187,050$175,000
0620Arrow panelEACH A A8$5,088.00$398.83$2,544.00
0630Erosion control blanketSQYD A A185,751$2.05$1.85$1.68
0640Temp mulchSQYD A A344,156$0.20$0.25$0.28
0650Temp seeding and protectionSQYD A A258,117$0.25$0.35$0.31
0660Initial fertilizerTON A A24$850.00$1,500.00$994.00
0670Maintenance fertilizerTON A A15$850.00$1,500.00$994.00
0680Seeding and protectionSQYD A A270,732$0.30$0.42$0.46
0690SoddingSQYD A A883$8.25$8.50$6.10
0700Agricultural limestoneTON A A282$80.00$75.00$98.00
0710Topsoil furnished and placedCUYD A A100$99.64$73.74$100.00
0720Pave striping-temp paint-4 inLF A A3,500$0.30$0.30$0.30
0730Pave striping-temp paint-6 inLF A A25,000$0.33$0.33$0.33
0740Pave striping-perm paint-4 inLF A A8,509$0.32$0.32$0.32
0750Pave striping-perm paint-6 inLF A A58,841$0.34$0.34$0.34
0760Pave striping-thermo-6 in WLF A A2,964$1.40$1.40$1.40
0770Pave striping-thermo-6 in YLF A A3,352$1.40$1.40$1.40
0780Pave marking-thermo R 6 FTEACH A A4$150.00$150.00$150.00
0790Pave marking-R/R xbucks 16 inLF A A84$12.00$12.00$12.00
0800Pave marking-thermo stop bar-24INLF A A204$14.00$14.00$14.00
0810Pave marking-thermo cross-hatchSQFT A A746$7.00$7.00$7.00
0820Pave marking-thermo curv arrowEACH A A19$130.00$130.00$130.00
0830Pave marking-thermo comb arrowEACH A A6$250.00$250.00$250.00
0840Inlaid pavement marker-MWEACH A A59$22.00$22.00$22.00
0850Inlaid pavement marker-byEACH A A231$22.00$22.00$22.00
0860Fuel adjustmentDOLL A A176,747$1.00$1.00$1.00
0870Asphalt adjustmentDOLL A A217,409$1.00$1.00$1.00
0880Joint adhesiveLF A A1,434$1.55$3.00$3.00
0890Temporary pipeLF A A250$98.61$55.32$115.00
0900Object marker TY 3EACH A A12$28.73$60.00$100.00
0910Centerline rumble stripsLF A A14,750$0.25$0.18$0.25
0920Sawcut pavementLF A A1,434$2.66$1.84$1.33
0930Longitudinal edge keyLF A A1,434$6.28$13.87$7.49
0940Pave marking-thermo yield bar-36 inLF A A68$40.00$40.00$40.00
0950Water blasting existing stripeLF A A5,000$1.25$1.25$1.25
0960Pave mark-thermo-24 in YLF A A54$14.00$14.00$14.00
0970Turf reinforcement mat 1SQYD A A10,811$5.00$6.50$5.68
0980Standard barrier median TY 5-modSQYD A A540$151.35$151.35$151.35
0990Pave stripe-wet ref tape-6 in YLF A A1,144$10.00$10.00$10.00
1000Pave stripe-wet ref tape-6 in WLF A A1,239$10.00$10.00$10.00
1010Pave marking-thermo dotted lane extenLF A A154$4.00$4.00$4.00
1020Thrie beam guardrail transition TL-3EACH A A12$3,146.02$4,600.00$4,000.00
1030Electronic delivery MGMT system - aggLS A A1$0.01$0.01$1.00
1040Crushed aggregate size no 2TON A A29$233.87$31.02$35.00
1050Entrance pipe-15 inLF A A212$90.00$71.23$70.00
1060Entrance pipe-24 inLF A A470$102.00$88.70$100.00
1070Entrance pipe-30 inLF A A84$124.00$128.69$110.00
1080Entrance pipe-24 in equivLF A A74$118.00$93.85$105.00
1090Entrance pipe-30 in equivLF A A63$142.00$138.86$125.00
1100Culvert pipe-15 inLF A A86$96.00$116.04$95.00
1110Culvert pipe-18 inLF A A371$92.00$164.04$90.00
1120Culvert pipe-24 inLF A A1,268$85.00$146.86$105.00
1130Culvert pipe-30 inLF A A172$107.00$169.38$200.00
1140Culvert pipe-18 in equivLF A A58$119.00$199.92$105.00
1150Culvert pipe-30 in equivLF A A61$166.00$260.17$140.00
1160Perforated pipe-4 inLF A A10,962$26.52$8.12$22.00
1170Non-perforated pipe-4 inLF A A5,144$27.34$10.43$23.00
1180Inspect & certify edge drain systemLS A A1$7,500.00$2,500.00$7,500.00
1190Perf pipe headwall TY 3-4 inEACH A A29$1,177.47$726.09$750.00
1200Pipe culvert headwall-18 inEACH A A2$1,700.00$2,618.10$3,000.00
1210Pipe culvert headwall-24 inEACH A A2$2,000.00$2,727.50$3,200.00
1220Pipe culvert headwall-30 inEACH A A2$7,000.00$4,127.25$3,750.00
1230Metal end section TY 3-18 in (equiv)EACH A A2$1,400.00$1,868.66$2,500.00
1240Sloped box outlet type 1-15 inEACH A A2$2,300.00$2,901.58$3,500.00
1250Sloped box outlet type 1-24 inEACH A A17$3,000.00$4,150.95$3,750.00
1260S & F box inlet-outlet-18 inEACH A A4$3,000.00$3,540.49$4,000.00
1270Cored hole drainage box con-4 inEACH A A10$350.00$500.00$500.00
1280Fabric-geotextile class 2 for pipeSQYD A A2,146$2.00$2.00$2.00
1290Entrance pipe-36 inLF A A132$184.00$192.65$150.00
1300Metal end section TY 1-30 in (equiv)EACH A A2$3,100.00$4,000.00$3,500.00
1310Pipeline inspectionLF A A1,809$2.35$3.45$2.35
1320Structure granular backfillCUYD A A618.80$64.00$75.96$64.00
1330Armored edge for concreteLF A A92.40$90.74$99.17$90.74
1340Foundation preparationLS A A1$6,500.00$12,735$6,500.00
1350Cyclopean stone rip rapTON A A917$58.00$44.21$58.00
1360Test pilesLF A A75$213.00$109.86$213.00
1370Piles-steel HP14X89LF A A698$104.40$107.46$104.40
1380Pile points-14 inEACH A A22$195.00$195.30$195.00
1390Concrete-class ACUYD A A121.30$686.00$790.23$686.00
1400Concrete-class AACUYD A A156.30$1,231.00$1,246.34$1,231.00
1410Steel reinforcement-epoxy coatedLB A A43,067$1.58$1.63$1.58
1420Precast PC box beam SB42LF A A480$536.70$597.34$536.70
1430Concrete sealingSQFT A A8,426$1.65$2.40$1.65
1440Deck drainEACH A A4$672.00$715.10$672.00
1450Rail system single slope - 40 inLF A A195.90$190.00$189.41$190.00
1460Mobilization for concrete surf treatmentLS A A1$500.00$1,683.69$500.00
1470Structure granular backfillCUYD A A703.50$64.00$91.02$64.00
1480Armored edge for concreteLF A A137.10$90.74$87.72$90.74
1490Foundation preparationLS A A1$11,500$10,843$11,500
1500Cyclopean stone rip rapTON A A1,276$58.00$45.31$58.00
1510Test pilesLF A A61$215.00$111.12$215.00
1520Piles-steel HP14X89LF A A595$107.30$113.91$107.30
1530Pile points-14 inEACH A A24$195.00$195.30$195.00
1540Concrete-class ACUYD A A133.20$701.00$779.56$701.00
1550Concrete-class AACUYD A A218.30$1,089.00$995.31$1,089.00
1560Steel reinforcement-epoxy coatedLB A A56,613$1.58$1.61$1.58
1570Precast PC box beam SB42LF A A805.50$528.00$576.42$528.00
1580Concrete sealingSQFT A A10,140$1.65$2.40$1.65
1590Deck drainEACH A A8$672.00$715.10$672.00
1600Rail system single slope - 40 inLF A A182.50$190.00$199.94$190.00
1610Mobilization for concrete surf treatmentLS A A1$500.00$1,683.69$500.00
1620Structure granular backfillCUYD A A1,209$58.00$74.21$58.00
1630Armored edge for concreteLF A A172$96.00$97.83$96.00
1640Foundation preparationLS A A1$15,000$12,739$15,000
1650Cyclopean stone rip rapTON A A1,356$48.00$45.31$48.00
1660Test pilesLF A A76$450.00$124.10$450.00
1670Pre-drilling for pilesLF A A420$384.00$269.60$384.00
1680Piles-steel HP14X117LF A A2,129$131.31$124.10$131.31
1690Pile points-14 inEACH A A59$195.00$195.30$195.00
1700Concrete-class ACUYD A A305.10$752.00$712.82$752.00
1710Concrete-class AACUYD A A192.30$1,200.00$1,154.96$1,200.00
1720Steel reinforcement-epoxy coatedLB A A59,449$1.56$1.66$1.56
1730Precast PC box beam SB42LF A A505.50$533.00$573.69$533.00
1740Concrete sealingSQFT A A9,805$1.65$2.40$1.65
1750Deck drainEACH A A4$672.00$715.10$672.00
1760Rail system single slope - 40 inLF A A176.50$190.00$205.18$190.00
1770Mobilization for concrete surf treatmentLS A A1$500.00$1,683.69$500.00
1780Pole 40 FT MTG HTEACH A A11$2,858.00$2,946.67$2,858.00
1790Bracket 8 FTEACH A A8$602.00$658.66$602.00
1800Bracket 10 FTEACH A A3$808.00$835.97$808.00
1810Pole baseEACH A A11$3,355.00$2,867.10$3,355.00
1820Transformer baseEACH A A11$1,557.00$1,641.20$1,557.00
1830Lighting control equipmentEACH A A1$34,740$27,986$34,740
1840Fused connector kitEACH A A22$267.00$243.60$267.00
1850Trenching and backfillingLF A A1,785$4.61$11.25$4.61
1860Wire-no. 12LF A A1,815$1.87$1.77$1.87
1870Pole 45 FT woodenEACH A A1$2,055.00$1,543.69$2,055.00
1880Electrical junction box type AEACH A A4$2,320.00$1,545.72$2,320.00
1890Bore and jack conduitLF A A100$66.00$81.23$66.00
1900Wire-no. 10LF A A8,300$2.03$2.16$2.03
1910LED luminaireEACH A A11$825.00$932.00$825.00
1920PVC conduit-1 1/4 in-schedule 80LF A A1,670$6.95$6.12$6.95
1930PVC conduit-2 in-schedule 80LF A A340$9.67$8.43$9.67
1940MobilizationLS A A1$924,312$568,726$1,038,000
1950DemobilizationLS A A1$287,150$305,300$339,568
KYTC contract 25-1902: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy