KYTC contract 25-2017 bid tabulation

PAVEMENT (WITH ALTERNATES) PURCHASE PARKWAY (FULTON, HICKMAN, & GRAVES COUNTIES). Let by Kentucky Transportation Cabinet on January 23, 2025, Fulton, Graves, Hickman, District 1. 2 bids received; low bid $5,847,117 by Strawser Construction Inc, -3.7% against the engineer's estimate of $6,072,358.

Owner
Kentucky Transportation Cabinet
Letting
23 JAN 2025
Pay items
32
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Strawser Construction Inc$5,847,117Low-4.0%
2Jim Smith Contracting Company LLC$6,467,542+11%+7.0%
KYTC contract 25-2017: bids by rank

Engineer's estimate: $6,072,358.

Bid tabulation

LinePay itemUnitQuantity1. Strawser Construction Inc2. Jim Smith Contracting Company LLC
0010Pave striping-temp paint-4 inLF A1,008,000$0.11
0020Microsurfacing-surface course - type ASQYD A614,272$3.56
0030Microsurfacing-leveling courseSQYD A651,278$2.73
0040Fiber reinforcement for microsurfacingSQYD A614,272$0.57
0050Leveling & wedging PG64-22TON A1,527$159.00
0060Asphalt material for tackTON A274$750.00
0070Mobilization for mill & textLS A1$2,000.00
0080Mobilization for mill & textLS A1$2,000.00
0090Mobilization for mill & textLS A1$2,000.00
0100Asphalt pave milling & texturingTON A730$165.00
0110Pave striping-temp paint-4 inLF A545,000$0.10
0120CL3 asph surf no.4A PG64-22TON A25,355$159.00
0130Fiber reinforcement for surf no.4TON A25,355$8.30
0140Temporary signsSQFT A3,120$16.68$7.00
0150Maintain & control trafficLS A1$51,012$45,000
0160Maintain & control trafficLS A1$51,012$180,000
0170Maintain & control trafficLS A1$51,012$80,000
0180Arrow panelEACH A12$1,700.00$500.00
0190Pave striping removal-6 inLF A503,000$0.34$0.30
0200Pave striping-thermo-6 in WLF A301,000$1.08$0.96
0210Pave striping-thermo-6 in YLF A202,000$1.08$0.96
0220Law enforcement officerHOUR A82$95.55$100.00
0230Overband crack sealingLB A78,000$1.60$1.53
0240Inlaid pavement markerEACH A5,150$21.36$19.00
0250Remove pavement markerEACH A5,150$8.00$10.00
0260Queue protection vehicleHOUR A100$113.20$80.00
0270Furnish queue protection vehiclesMONT A5$5,302.30$8,000.00
0280Portable queue warning alert systemMONT A3$2,442.63$3,299.05
0290Queue warning PCMSMONT A12$835.00$0.01
0300Queue warning portable radar sensorsMONT A12$330.00$0.01
0310MobilizationLS A1$46,046$200,000
0320DemobilizationLS A1$92,543$95,000
KYTC contract 25-2017: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of January 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy