KYTC contract 25-2065 bid tabulation
ASPHALT RESURFACING CARROLLTON - WARSAW ROAD (US 42). Let by Kentucky Transportation Cabinet on February 20, 2025, Gallatin, District 6. 4 bids received; low bid $579,412 by Mac Construction & Excavating Inc, -14% against the engineer's estimate of $676,233.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 FEB 2025
- Pay items
- 23
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mac Construction & Excavating Inc | $579,412 | Low | -14% |
| 2 | Eaton Asphalt Paving Co Inc | $598,353 | +3.0% | -12% |
| 3 | Hinkle Contracting Company LLC | $605,533 | +5.0% | -10% |
| 4 | Riegler Blacktop Inc | $637,493 | +10% | -6.0% |
Engineer's estimate: $676,233.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mac Construction & Excavating Inc | 2. Eaton Asphalt Paving Co Inc | 3. Hinkle Contracting Company LLC | 4. Riegler Blacktop Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A | 300 | $46.00 | $46.00 | $43.00 | $75.00 |
| 0020 | Leveling & wedging PG64-22 | TON A | 892 | $96.00 | $92.00 | $93.85 | $89.00 |
| 0030 | CL2 asph surf 0.38D PG64-22 | TON A | 4,085 | $83.00 | $92.00 | $93.85 | $98.00 |
| 0040 | Asphalt material for tack | TON A | 40 | $0.01 | $1.00 | $1.00 | $1.00 |
| 0050 | Temporary signs | SQFT A | 290 | $8.56 | $5.00 | $4.25 | $8.50 |
| 0060 | Maintain & control traffic | LS A | 1 | $2,500.00 | $22,575 | $9,550.00 | $18,200 |
| 0070 | Mobilization for mill & text | LS A | 1 | $2,950.00 | $5,500.00 | $2,950.00 | $7,700.00 |
| 0080 | Asphalt pave milling & texturing | TON A | 100 | $17.35 | $1.00 | $55.00 | $50.00 |
| 0090 | Edgeline rumble strips | LF A | 33,370 | $0.20 | $0.18 | $0.18 | $0.18 |
| 0100 | Base failure repair | SQYD A | 70 | $138.00 | $68.00 | $120.00 | $120.00 |
| 0110 | Pave striping-temp paint-4 in | LF A | 30,000 | $0.18 | $0.18 | $0.18 | $0.18 |
| 0120 | Pave striping-perm paint-6 in | LF A | 77,050 | $0.26 | $0.24 | $0.24 | $0.24 |
| 0130 | Pave marking-thermo stop bar-24IN | LF A | 24 | $10.00 | $12.50 | $12.50 | $12.50 |
| 0140 | Pave marking-thermo cross-hatch | SQFT A | 4,435 | $3.00 | $3.25 | $3.25 | $3.25 |
| 0150 | Pave marking-thermo STR arrow | EACH A | 1 | $100.00 | $115.00 | $115.00 | $115.00 |
| 0160 | Pave marking-thermo curv arrow | EACH A | 30 | $115.00 | $100.00 | $100.00 | $100.00 |
| 0170 | Pave marking-thermo only | EACH A | 14 | $275.00 | $300.00 | $300.00 | $300.00 |
| 0180 | Fuel adjustment | DOLL A | 7,747 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0190 | Asphalt adjustment | DOLL A | 19,458 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0200 | Centerline rumble strips | LF A | 16,685 | $0.28 | $0.20 | $0.20 | $0.20 |
| 0210 | Adjust drainage structure | EACH A | 1 | $782.53 | $1,200.00 | $6,450.00 | $1,500.00 |
| 0220 | Electronic delivery MGMT system | LS A | 1 | $4,475.26 | $0.01 | $1.00 | $1.00 |
| 0230 | Demobilization | LS A | 1 | $31,410 | $8,575.00 | $8,948.76 | $9,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.