KYTC contract 25-2080 bid tabulation

ASPHALT RESURFACING HARDIN COUNTY (KY 361 & US 31W). Let by Kentucky Transportation Cabinet on March 20, 2025, Hardin, District 4. 4 bids received; low bid $3,125,410 by Scotty'S Contracting & Stone LLC, -20% against the engineer's estimate of $3,924,449.

Owner
Kentucky Transportation Cabinet
Letting
20 MAR 2025
Pay items
50
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scotty'S Contracting & Stone LLC$3,125,410Low-20%
2Mac Construction & Excavating Inc$3,138,8200.0%-20%
3Louisville Paving Company Inc$3,284,131+5.0%-16%
4Flynn Brothers Contracting Inc$3,345,773+7.0%-15%
KYTC contract 25-2080: bids by rank

Engineer's estimate: $3,924,449.

Bid tabulation

LinePay itemUnitQuantity1. Scotty'S Contracting & Stone LLC2. Mac Construction & Excavating Inc3. Louisville Paving Company Inc4. Flynn Brothers Contracting Inc
0010Dga baseTON A1,445$36.25$37.00$42.00$49.25
0020Leveling & wedging PG64-22TON A1,489$82.27$88.00$86.00$77.50
0030CL2 asph surf 0.38D PG64-22TON A2,695$81.47$87.00$86.00$81.30
0040CL2 asph surf 0.38B PG64-22TON A11,710$83.40$89.00$86.00$80.00
0050Asphalt material for tackTON A166$0.01$0.01$0.01$355.50
0060Temporary signsSQFT A700$4.00$7.50$4.00$6.42
0070Maintain & control trafficLS A1$44,436$34,000$64,000$105,625
0080Maintain & control trafficLS A1$52,654$34,000$64,000$115,261
0090Portable changeable message signEACH A4$1,994.13$1,400.00$600.00$535.00
0100Mobilization for mill & textLS A1$2,362.42$2,000.00$2,500.00$829.25
0110Mobilization for mill & textLS A1$2,362.42$2,000.00$2,500.00$829.25
0120Asphalt pave milling & texturingTON A14,095$9.82$0.01$15.26$19.00
0130Edgeline rumble stripsLF A93,950$0.23$0.15$0.25$0.16
0140Sidewalk-4 in concreteSQYD A40$354.00$372.02$105.00$245.00
0150Arrow panelEACH A4$1,196.48$925.00$350.00$428.00
0160Conduit-1 1/4 inLF A150$13.04$13.04$13.04$7.56
0170Conduit-2 inLF A30$16.90$16.90$16.90$10.44
0180Trenching and backfillingLF A150$6.67$6.67$6.67$10.70
0190Piezoelectric sensorEACH A4$2,093.56$2,093.56$2,093.56$3,745.00
0200Loop wireLF A3,860$0.78$0.78$0.78$0.27
0210Loop saw slot and fillLF A880$27.33$27.33$27.33$23.17
0220Pave striping-temp paint-4 inLF A257,241$0.31$0.31$0.31$0.33
0230Pave striping-perm paint-6 inLF A139,932$0.32$0.32$0.32$0.34
0240Pave striping-thermo-6 in WLF A54,847$1.25$1.25$1.25$1.34
0250Pave striping-thermo-6 in YLF A35,102$1.25$1.25$1.25$1.34
0260Pave striping-thermo-12 in WLF A4,561$6.00$6.00$6.00$6.42
0270Pave striping-thermo-12 in YLF A46$6.00$6.00$6.00$6.42
0280Pave marking-thermo X-walk-6 inLF A824$3.75$3.75$3.75$4.01
0290Pave marking-thermo stop bar-24INLF A904$14.00$14.00$14.00$14.98
0300Pave marking-thermo curv arrowEACH A114$130.00$130.00$130.00$139.10
0310Pave marking-thermo comb arrowEACH A4$200.00$200.00$4.00$214.00
0320Pave marking-thermo merge arrowEACH A4$350.00$350.00$350.00$374.50
0330Remove pavement marker type VEACH A1,285$7.16$4.50$15.00$5.35
0340Fuel adjustmentDOLL A40,165$1.00$1.00$1.00$1.00
0350Asphalt adjustmentDOLL A99,575$1.00$1.00$1.00$1.00
0360Galvanized steel cabinetEACH A2$878.37$878.37$878.37$1,068.72
0370Wood postEACH A6$506.77$506.77$506.77$3,210.00
0380Electrical junction box type AEACH A2$1,524.22$1,524.22$1,524.22$1,070.00
0390Centerline rumble stripsLF A18,506$0.20$0.20$0.20$0.21
0400Electrical junction box-10 X 8 X 4EACH A2$441.36$441.36$441.36$2,695.87
0410Pave marking-thermo yield bar-36 inLF A12$30.00$30.00$30.00$32.10
0420CL3 asph surf 0.38A PG64-22TON A9,575$85.37$85.00$91.00$85.79
0430Detectable warningsSQFT A16$57.00$51.10$34.00$53.50
0440Detectable warningsSQFT A40$57.00$59.49$36.00$64.20
0450Pave mark thermo-wrong way arrowEACH A4$300.00$300.00$300.00$321.00
0460Pave marking-thermo U-turnEACH A8$300.00$300.00$300.00$321.00
0470Electronic delivery MGMT systemLS A1$0.01$1,000.00$1.00$1.00
0480Electronic delivery MGMT systemLS A1$0.01$1,000.00$1.00$1.00
0500MobilizationLS A1$97,910$122,376$40,000$3,980.40
0510DemobilizationLS A1$42,676$122,376$49,980$51,156
KYTC contract 25-2080: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy