KYTC contract 25-2105 bid tabulation

ASPHALT RESURFACING SUMMER SHADE ROAD (KY 90). Let by Kentucky Transportation Cabinet on March 20, 2025, Metcalfe, District 3. 2 bids received; low bid $1,052,466 by Scotty'S Contracting & Stone LLC, -7.3% against the engineer's estimate of $1,134,989.

Owner
Kentucky Transportation Cabinet
Letting
20 MAR 2025
Pay items
22
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scotty'S Contracting & Stone LLC$1,052,466Low-7.0%
2Cleary Construction Inc$1,074,000+2.0%-5.0%
KYTC contract 25-2105: bids by rank

Engineer's estimate: $1,134,989.

Bid tabulation

LinePay itemUnitQuantity1. Scotty'S Contracting & Stone LLC2. Cleary Construction Inc
0010Dga baseTON A315$49.05$40.00
0020Leveling & wedging PG64-22TON A1,212$92.47$104.00
0030CL3 asph surf 0.38B PG64-22TON A5,900$100.81$109.00
0040Temporary signsSQFT A590$4.00$5.00
0050Maintain & control trafficLS A1$25,177$10,000
0060Mobilization for mill & textLS A1$3,410.75$9,000.00
0070Asphalt pave milling & texturingTON A1,465$14.94$18.20
0080Edgeline rumble stripsLF A36,443$0.25$0.20
0090Base failure repairSQYD A230$111.14$82.00
0100Pave striping-temp paint-4 inLF A60,733$0.31$0.31
0110Pave striping-thermo-6 in WLF A53,445$1.35$1.35
0120Pave striping-thermo-6 in YLF A48,586$1.35$1.35
0130Pave striping-dur TY 1-6 in WLF A130$9.00$9.00
0140Pave striping-dur TY 1-6 in YLF A85$9.00$9.00
0150Pave marking-thermo stop bar-24INLF A44$15.00$15.00
0160Pave marking-thermo merge arrowEACH A2$500.00$500.00
0170Fuel adjustmentDOLL A10,558$1.00$1.00
0180Asphalt adjustmentDOLL A26,518$1.00$1.00
0190Centerline rumble stripsLF A18,221$0.22$0.22
0200Asphalt material for tack non-trackingTON A40$660.00$0.01
0210Electronic delivery MGMT systemLS A1$0.01$1.00
0220DemobilizationLS A1$15,006$16,240
KYTC contract 25-2105: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy