KYTC contract 25-2192 bid tabulation
ASPHALT RESURFACING SHELBYVILLE ROAD (US 60). Let by Kentucky Transportation Cabinet on May 22, 2025. 3 bids received; low bid $588,455 by Louisville Paving Company Inc, -27% against the engineer's estimate of $809,539.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 MAY 2025
- Pay items
- 44
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Louisville Paving Company Inc | $588,455 | Low | -27% |
| 2 | Hall Contracting of Kentucky Inc | $717,000 | +22% | -11% |
| 3 | E & B Paving LLC | $722,800 | +23% | -11% |
Engineer's estimate: $809,539.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louisville Paving Company Inc | 2. Hall Contracting of Kentucky Inc | 3. E & B Paving LLC |
|---|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 405 | $89.00 | $82.00 | $100.00 |
| 0020 | CL4 asph surf 0.38A PG76-22 | TON A A | 3,095 | $89.00 | $98.00 | $100.00 |
| 0030 | Temporary signs | SQFT A A | 230 | $4.00 | $4.00 | $7.00 |
| 0040 | Maintain & control traffic | LS A A | 1 | $41,000 | $60,050 | $41,682 |
| 0050 | Portable changeable message sign | EACH A A | 4 | $600.00 | $600.00 | $500.00 |
| 0060 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $7,500.00 | $2,500.00 |
| 0070 | Asphalt pave milling & texturing | TON A A | 2,410 | $13.50 | $27.00 | $28.84 |
| 0080 | Arrow panel | EACH A A | 4 | $400.00 | $500.00 | $300.00 |
| 0090 | Base failure repair | SQYD A A | 365 | $60.00 | $65.00 | $100.00 |
| 0100 | Conduit-2 in | LF A A | 15 | $19.93 | $8.93 | $8.93 |
| 0110 | Electrical junction box type B | EACH A A | 1 | $1,155.75 | $2,000.00 | $2,000.00 |
| 0120 | Trenching and backfilling | LF A A | 10 | $9.83 | $10.00 | $10.00 |
| 0130 | Loop wire | LF A A | 1,900 | $1.51 | $0.25 | $0.25 |
| 0140 | Loop saw slot and fill | LF A A | 280 | $15.95 | $10.00 | $10.00 |
| 0150 | Remove and replace sidewalk | SQYD A A | 2 | $1,250.00 | $800.00 | $2,200.00 |
| 0160 | Pave striping-temp paint-4 in | LF A A | 57,976 | $0.27 | $0.27 | $0.27 |
| 0170 | Pave striping-thermo-6 in W | LF A A | 18,000 | $1.40 | $1.40 | $1.40 |
| 0180 | Pave striping-thermo-6 in Y | LF A A | 10,000 | $1.40 | $1.40 | $1.40 |
| 0190 | Pave striping-thermo-12 in W | LF A A | 1,250 | $3.00 | $3.00 | $3.00 |
| 0200 | Pave striping-thermo-12 in Y | LF A A | 20 | $3.25 | $3.25 | $3.25 |
| 0210 | Pave marking-thermo X-walk-6 in | LF A A | 985 | $4.25 | $4.25 | $4.25 |
| 0220 | Pave marking-thermo stop bar-24IN | LF A A | 456 | $14.00 | $14.00 | $14.00 |
| 0230 | Pave marking-thermo cross-hatch | SQFT A A | 210 | $5.95 | $5.95 | $5.95 |
| 0240 | Pave marking-thermo STR arrow | EACH A A | 12 | $135.00 | $135.00 | $135.00 |
| 0250 | Pave marking-thermo curv arrow | EACH A A | 83 | $155.00 | $155.00 | $155.00 |
| 0260 | Pave marking-thermo only | EACH A A | 3 | $305.00 | $305.00 | $305.00 |
| 0270 | Remove pavement marker type V | EACH A A | 450 | $7.50 | $7.00 | $1.87 |
| 0280 | Fuel adjustment | DOLL A A | 4,818 | $1.00 | $1.00 | $1.00 |
| 0290 | Asphalt adjustment | DOLL A A | 12,100 | $1.00 | $1.00 | $1.00 |
| 0300 | Galvanized steel cabinet | EACH A A | 1 | $1,163.83 | $999.95 | $999.95 |
| 0310 | Wood post | EACH A A | 2 | $473.78 | $500.00 | $500.00 |
| 0320 | Law enforcement officer | HOUR A A | 550 | $1.00 | $80.00 | $75.00 |
| 0330 | Pave mark thermo cone cap-solid yellow | SQFT A A | 360 | $6.95 | $6.95 | $6.95 |
| 0340 | Pave marking-thermo yield bar-36 in | LF A A | 30 | $34.00 | $34.00 | $34.00 |
| 0350 | Pavement marking-thermo letters | EACH A A | 10 | $250.00 | $250.00 | $250.00 |
| 0360 | Pave mark-thermo-X-walk-24 in | LF A A | 810 | $14.00 | $14.00 | $14.00 |
| 0370 | Pave mark thermo chevron | SQFT A A | 1,250 | $5.95 | $5.95 | $5.95 |
| 0380 | Pave marking-thermo dotted lane exten | LF A A | 465 | $4.05 | $4.05 | $4.05 |
| 0390 | Pave mark thermo-wrong way arrow | EACH A A | 2 | $500.00 | $500.00 | $500.00 |
| 0400 | Pave marking-thermo elong route shield | EACH A A | 2 | $3,450.00 | $3,450.00 | $3,450.00 |
| 0410 | Asphalt material for tack non-tracking | TON A A | 19 | $0.01 | $0.01 | $0.10 |
| 0420 | Install radar presence detector type A | EACH A A | 10 | $927.67 | $1,441.11 | $1,441.11 |
| 0430 | Electronic delivery MGMT system | LS A A | 1 | $1.00 | $1.00 | $1.06 |
| 0440 | Demobilization | LS A A | 1 | $9,008.70 | $10,755 | $12,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.