KYTC contract 25-2344 bid tabulation

ASPHALT RESURFACING DECOURSEY AVE/E. 30TH ST./JAMES AVE. (KY 16). Let by Kentucky Transportation Cabinet on September 25, 2025. 2 bids received; low bid $518,607 by Riegler Blacktop Inc, -0.7% against the engineer's estimate of $522,093.

Owner
Kentucky Transportation Cabinet
Letting
25 SEP 2025
Pay items
49
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Riegler Blacktop Inc$518,607Low-1.0%
2Eaton Asphalt Paving Co Inc$534,500+3.0%+2.0%
KYTC contract 25-2344: bids by rank

Engineer's estimate: $522,093.

Bid tabulation

LinePay itemUnitQuantity1. Riegler Blacktop Inc2. Eaton Asphalt Paving Co Inc
0010Leveling & wedging PG64-22TON A A114$102.60$143.50
0020Asphalt material for tackTON A A8$1.00$1.00
0030CL3 asph surf 0.38B PG64-22TON A A1,144$102.60$130.00
0040Mobilization for mill & textLS A A1$9,000.00$1,115.00
0050Asphalt pave milling & texturingTON A A1,144$20.00$24.65
0060Base failure repairSQYD A A355$105.00$103.80
0070Base failure repairSQYD A A105$218.00$225.30
0080Standard header curbLF A A100$100.00$89.90
0090Saw-clean-reseal tverse jointLF A A2,181$8.83$9.00
0100Saw-clean-reseal longit jointLF A A5,356$8.83$10.50
0110Temporary signsSQFT A A1,170$11.00$5.00
0120Maintain & control trafficLS A A1$11,250$5,600.00
0130Maintain & control trafficLS A A1$11,250$5,600.00
0140Maintain & control trafficLS A A1$11,250$5,950.00
0150Portable changeable message signEACH A A3$1,500.00$1,326.60
0160Sidewalk-4 in concreteSQYD A A18$250.00$242.30
0170Arrow panelEACH A A2$1,000.00$235.00
0180Pave striping-temp paint-6 inLF A A9,504$0.22$0.22
0190Pave striping-thermo-6 in WLF A A3,758$1.25$1.25
0200Pave striping-thermo-6 in YLF A A6,735$1.25$1.25
0210Pave striping-dur TY 1-6 in WLF A A1,927$8.00$8.00
0220Pave striping-dur TY 1-6 in YLF A A2,769$8.00$8.00
0230Pave marking-thermo R 6 FTEACH A A8$125.00$125.00
0240Pave marking-R/R xbucks 16 inLF A A80$8.00$8.00
0250Pave marking-thermo X-walk-6 inLF A A1,532$4.00$4.00
0260Pave marking-thermo stop bar-24INLF A A491$10.00$10.00
0270Pave marking-thermo curv arrowEACH A A18$120.00$120.00
0280Pave marking-thermo comb arrowEACH A A6$140.00$140.00
0290Pavement marking removalSQFT A A20$12.50$12.50
0300Remove pavement marker type VEACH A A62$185.45$22.00
0310Inlaid pavement marker-MWEACH A A18$36.00$36.00
0320Inlaid pavement marker-byEACH A A217$36.00$36.00
0330Pave mark temp paint stop barLF A A499$7.00$7.00
0340Pave mark temp paint line arrowEACH A A9$65.00$65.00
0350Saw-clean-reseal random cracksLF A A754$10.83$18.00
0360Erosion controlLS A A1$500.00$5,200.00
0370Water blasting existing stripeLF A A4,696$0.95$0.95
0380Qwick curb median separatorLF A A135$115.00$115.00
0390Detectable warningsSQFT A A12$40.00$116.00
0400Pave mark TY 1 tape stop bar-24 inLF A A20$25.00$25.00
0410Reconstruct inletEACH A A1$4,500.00$5,150.00
0420Adjust manhole frame to gradeEACH A A4$1,500.00$955.00
0430SBM alum sheet signs .080 inSQFT A A44$40.00$40.00
0440SBM alum sheet signs .125 inSQFT A A57$40.00$40.00
0450Steel post type 1LF A A100$35.00$35.00
0460Remove signEACH A A1$100.00$319.82
0470Barcode sign inventoryEACH A A14$25.00$25.00
0480Install radar presence detector type AEACH A A17$850.00$850.00
0490DemobilizationLS A A1$8,000.00$8,040.00
KYTC contract 25-2344: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy