KYTC contract 25-2399 bid tabulation
PAVEMENT (WITH ALTERNATES) WENDELL FORD EXPRESSWAY (US 60). Let by Kentucky Transportation Cabinet on November 20, 2025. 2 bids received; low bid $2,159,105 by Hinkle Contracting Company LLC, -0.0% against the engineer's estimate of $2,159,901.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 NOV 2025
- Pay items
- 36
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hinkle Contracting Company LLC | $2,159,105 | Low | 0.0% |
| 2 | Strawser Construction Inc | $2,508,850 | +16% | +16% |
Engineer's estimate: $2,159,901.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hinkle Contracting Company LLC | 2. Strawser Construction Inc |
|---|---|---|---|---|---|
| 0010 | Pave striping-temp paint-4 in | LF A A | 358,000 | $0.17 | |
| 0020 | Microsurfacing-surface course - type A | SQYD A A | 240,500 | $3.58 | |
| 0030 | Microsurfacing-leveling course | SQYD A A | 244,100 | $3.30 | |
| 0040 | Fiber reinforcement for microsurfacing | SQYD A A | 240,500 | $0.38 | |
| 0050 | Leveling & wedging PG64-22 | TON A A | 150 | $115.65 | |
| 0060 | Asphalt material for tack | TON A A | 72 | $300.00 | |
| 0070 | Mobilization for mill & text | LS A A | 1 | $10,000 | |
| 0080 | Asphalt pave milling & texturing | TON A A | 550 | $45.00 | |
| 0090 | Pave striping-temp paint-4 in | LF A A | 180,000 | $0.01 | |
| 0100 | Fiber reinforcement for HMA | TON A A | 10,000 | $8.50 | |
| 0110 | CL4 asph surf no.4A PG64-22 | TON A A | 10,000 | $142.65 | |
| 0120 | Temporary signs | SQFT A A | 1,100 | $12.00 | $14.63 |
| 0130 | Maintain & control traffic | LS A A | 1 | $25,000 | $118,766 |
| 0140 | Portable changeable message sign | EACH A A | 3 | $850.00 | $2,560.00 |
| 0150 | Arrow panel | EACH A A | 2 | $575.00 | $1,740.00 |
| 0160 | Conduit-1 1/4 in | LF A A | 180 | $8.95 | $10.29 |
| 0170 | Conduit-2 in | LF A A | 50 | $7.00 | $8.05 |
| 0180 | Trenching and backfilling | LF A A | 205 | $12.00 | $13.80 |
| 0190 | Piezoelectric sensor | EACH A A | 8 | $2,200.00 | $2,600.00 |
| 0200 | Loop wire | LF A A | 4,050 | $0.40 | $0.46 |
| 0210 | Loop saw slot and fill | LF A A | 960 | $7.00 | $8.05 |
| 0220 | Pave striping removal-6 in | LF A A | 211,000 | $0.48 | $0.52 |
| 0230 | Pave striping-thermo-6 in W | LF A A | 110,000 | $1.40 | $1.27 |
| 0240 | Pave striping-thermo-6 in Y | LF A A | 101,000 | $1.40 | $1.27 |
| 0250 | Pave marking-thermo stop bar-24IN | LF A A | 80 | $20.00 | $11.50 |
| 0260 | Pave marking-thermo STR arrow | EACH A A | 10 | $120.00 | $86.25 |
| 0270 | Pave marking-thermo curv arrow | EACH A A | 19 | $120.00 | $86.25 |
| 0280 | Pave marking-thermo only | EACH A A | 2 | $210.00 | $287.51 |
| 0290 | Remove pavement marker type V | EACH A A | 700 | $10.00 | $12.00 |
| 0300 | Galvanized steel cabinet | EACH A A | 4 | $3,550.00 | $4,100.00 |
| 0310 | Wood post | EACH A A | 10 | $510.00 | $590.00 |
| 0320 | Electrical junction box type A | EACH A A | 4 | $3,500.00 | $4,100.00 |
| 0330 | Law enforcement officer | HOUR A A | 200 | $60.00 | $115.00 |
| 0340 | Electrical junction box-10 X 8 X 4 | EACH A A | 2 | $1,867.00 | $2,150.00 |
| 0350 | Install radar presence detector type A | EACH A A | 5 | $1,945.00 | $2,300.00 |
| 0360 | Demobilization | LS A A | 1 | $31,908 | $41,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.