KYTC contract 25-3019 bid tabulation
ASPHALT RESURFACING VARIOUS ROADS IN HANCOCK CO. Let by Kentucky Transportation Cabinet on March 20, 2025, Hancock, District 2. 2 bids received; low bid $266,335 by Hinkle Contracting Company LLC, -25% against the engineer's estimate of $353,020.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 MAR 2025
- Pay items
- 14
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hinkle Contracting Company LLC | $266,335 | Low | -25% |
| 2 | Scotty'S Contracting & Stone LLC | $289,649 | +9.0% | -18% |
Engineer's estimate: $353,020.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hinkle Contracting Company LLC | 2. Scotty'S Contracting & Stone LLC |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A | 235 | $57.00 | $57.90 |
| 0020 | Leveling & wedging PG64-22 | TON A | 170 | $88.00 | $97.50 |
| 0030 | CL2 asph surf 0.38D PG64-22 | TON A | 2,205 | $88.00 | $97.50 |
| 0040 | Temporary signs | SQFT A | 950 | $0.01 | $4.50 |
| 0050 | Maintain & control traffic | LS A | 1 | $6,500.00 | $5,025.00 |
| 0060 | Maintain & control traffic | LS A | 1 | $6,500.00 | $2,575.00 |
| 0070 | Mobilization for mill & text | LS A | 1 | $4,000.00 | $4,250.00 |
| 0080 | Mobilization for mill & text | LS A | 1 | $4,000.00 | $1,850.00 |
| 0090 | Asphalt pave milling & texturing | TON A | 60 | $135.00 | $57.00 |
| 0100 | Pave striping-temp paint-4 in | LF A | 3,000 | $0.01 | $0.01 |
| 0110 | Pave striping-perm paint-4 in | LF A | 30,720 | $0.34 | $0.34 |
| 0120 | Pave marking-thermo stop bar-24IN | LF A | 14 | $20.00 | $20.00 |
| 0130 | Asphalt material for tack non-tracking | TON A | 14 | $10.00 | $575.00 |
| 0140 | Demobilization | LS A | 1 | $3,935.99 | $4,280.54 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.