ASPHALT RESURFACING GLEN LILY RD (KY 2665). Let by Kentucky Transportation Cabinet on July 24, 2025. 2 bids received; low bid $1,129,547 by Scotty'S Contracting & Stone LLC, +4.8% against the engineer's estimate of $1,077,689.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 30
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $1,129,547 | Low | +5.0% |
| 2 | Cleary Construction Inc | $1,278,350 | +13% | +19% |
Engineer's estimate: $1,077,689.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Traffic bound base | TON A A | 100 | $29.23 | $60.00 |
| 0020 | Asphalt seal aggregate | TON A A | 500 | $89.85 | $107.00 |
| 0030 | Asphalt seal coat | TON A A | 56 | $743.91 | $1,180.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 254 | $120.02 | $107.00 |
| 0050 | CL2 asph surf 0.38D PG64-22 | TON A A | 5,100 | $85.60 | $107.00 |
| 0060 | Entrance pipe-15 in | LF A A | 795 | $127.60 | $85.25 |
| 0070 | Culvert pipe-18 in | LF A A | 65 | $429.86 | $295.00 |
| 0080 | Storm sewer pipe-15 in | LF A A | 75 | $210.28 | $169.00 |
| 0090 | Remove pipe | LF A A | 50 | $34.19 | $43.00 |
| 0100 | Junction box-15 in | EACH A A | 1 | $2,415.74 | $3,300.00 |
| 0110 | Frame and lid TY 1 | EACH A A | 1 | $724.72 | $1,850.00 |
| 0120 | Delineator for barrier wall-B/W | EACH A A | 14 | $79.12 | $18.50 |
| 0130 | Site preparation | EACH A A | 1 | $75,828 | $45,600 |
| 0140 | Channel lining class II | TON A A | 300 | $90.78 | $45.00 |
| 0150 | Clearing and grubbing | LS A A | 1 | $124,500 | $172,000 |
| 0160 | Temporary signs | SQFT A A | 310 | $5.74 | $5.00 |
| 0170 | Maintain & control traffic | LS A A | 1 | $53,244 | $64,300 |
| 0180 | Mobilization for mill & text | LS A A | 1 | $1,991.57 | $7,000.00 |
| 0190 | Asphalt pave milling & texturing | TON A A | 100 | $95.74 | $40.00 |
| 0200 | Base failure repair | SQYD A A | 450 | $100.41 | $68.00 |
| 0210 | Pave striping-temp paint-4 in | LF A A | 58,000 | $0.01 | $0.31 |
| 0220 | Pave striping-perm paint-4 in | LF A A | 58,000 | $0.32 | $0.32 |
| 0230 | Pave marking-thermo stop bar-24IN | LF A A | 24 | $15.00 | $15.00 |
| 0240 | Pave marking-thermo curv arrow | EACH A A | 1 | $250.00 | $250.00 |
| 0250 | Pave marking-thermo comb arrow | EACH A A | 1 | $350.00 | $350.00 |
| 0260 | Fuel adjustment | DOLL A A | 8,334 | $1.00 | $1.00 |
| 0270 | Asphalt adjustment | DOLL A A | 20,932 | $1.00 | $1.00 |
| 0280 | Asphalt material for tack non-tracking | TON A A | 30 | $564.06 | $795.25 |
| 0290 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.00 |
| 0300 | Demobilization | LS A A | 1 | $16,261 | $43,535 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.