KYTC contract 25-4403 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE MAIN STREET (US 31E). Let by Kentucky Transportation Cabinet on April 24, 2025, Jefferson, District 5. 3 bids received; low bid $5,477,000 by Mac Construction & Excavating Inc, +11% against the engineer's estimate of $4,928,122.

Owner
Kentucky Transportation Cabinet
Letting
24 APR 2025
Pay items
122
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Mac Construction & Excavating Inc$5,477,000Low+11%
2Hall Contracting of Kentucky Inc$5,615,470+3.0%+14%
3Pace Contracting LLC$5,882,000+7.0%+19%
KYTC contract 25-4403: bids by rank

Engineer's estimate: $4,928,122.

Bid tabulation

LinePay itemUnitQuantity1. Mac Construction & Excavating Inc2. Hall Contracting of Kentucky Inc3. Pace Contracting LLC
0010Dga baseTON A161$140.00$143.98$112.00
0020Leveling & wedging PG64-22TON A143$145.00$119.00$103.00
0030CL3 asph base 1.00D PG64-22TON A15$1,150.00$359.52$518.00
0040CL3 asph surf 0.38B PG64-22TON A3,583$145.00$104.20$103.00
0050Cem conc ent pavement-8 inSQYD A38$116.12$707.67$300.00
0060Mobilization for mill & textLS A1$9,500.00$3,000.00$4,000.00
0070Asphalt pave milling & texturingTON A3,583$36.00$39.50$42.60
0080Fuel adjustmentDOLL A7,024$1.00$1.00$1.00
0090Asphalt adjustmentDOLL A14,829$1.00$1.00$1.00
0100Asphalt material for tack non-trackingTON A20.20$0.01$630.00$0.05
0110Electronic delivery MGMT systemLS A1$0.01$584.17$1.00
0120Standard header curb modLF A991$74.00$59.19$50.00
0130Special header curbLF A201$84.00$145.35$55.00
0140Special header curbLF A24$265.00$329.64$200.00
0150Remove curbLF A1,000$47.00$30.84$25.00
0160Standard barrier median type 4SQYD A12$162.91$1,210.39$350.00
0170Standard barrier median type 4 modSQYD A499$157.29$184.35$184.00
0180Standard barrier median type 4 modSQYD A392$167.54$213.52$195.00
0190Standard barrier median type 4 modSQYD A2,950$138.48$117.00$125.60
0200Remove concrete islandSQYD A30$70.00$223.72$100.00
0210Remove PCC pavementSQYD A93$55.00$63.61$75.00
0220Remove pavementSQYD A3,993$19.00$26.39$32.00
0230Roadway excavationCUYD A15$400.00$520.69$150.00
0240Maintain & control trafficLS A1$581,425$134,035$636,067
0250Portable changeable message signEACH A2$5,000.00$6,552.13$9,500.00
0260Silt trap type CEACH A71$150.00$452.57$75.00
0270Clean silt trap type CEACH A71$25.00$43.41$20.00
0280Sidewalk-4 in concreteSQYD A514$78.41$100.03$100.00
0290Remove concrete sidewalkSQYD A495$93.00$56.54$40.00
0300StakingLS A1$39,000$31,906$342,249
0310Arrow panelEACH A2$2,700.00$3,418.50$3,000.00
0320Tubular markersEACH A22$136.00$256.30$250.00
0330Pave striping-temp paint-6 inLF A4,667$0.26$0.42$0.30
0340Pave striping-temp paint-12 inLF A249$0.52$2.88$1.00
0350Pave striping-thermo-6 in WLF A23,441$1.55$1.79$1.60
0360Pave striping-thermo-6 in YLF A13,658$1.45$1.69$1.50
0370Pave striping-thermo-12 in WLF A3,440$2.80$3.36$3.00
0380Pave striping-temp rem tape-WLF A178$2.75$6.33$3.00
0390Pave striping-dur TY 1-6 in WLF A3,568$6.25$7.28$6.00
0400Pave striping-dur TY 1-6 in YLF A191$6.25$10.10$6.00
0410Pave marking-thermo X-walk-6 inLF A5,129$4.25$4.95$4.00
0420Pave marking-thermo stop bar-24INLF A1,043$13.75$16.21$14.00
0430Pave marking-thermo cross-hatchSQFT A4,084$5.95$6.92$6.00
0440Pave marking-thermo STR arrowEACH A23$135.00$178.60$135.00
0450Pave marking-thermo curv arrowEACH A54$150.00$181.48$150.00
0460Pave marking-thermo comb arrowEACH A37$185.00$226.21$185.00
0470Pave marking-thermo onlyEACH A13$305.00$391.37$305.00
0480Pavement marking removalSQFT A279$15.00$19.13$15.00
0490Law enforcement officerHOUR A200$90.00$99.71$75.00
0500Saw cutLF A5,796$2.50$1.28$1.00
0510Pave marking thermo-bikeEACH A26$285.00$346.67$285.00
0520Pave mark thermo cone cap-solid yellowSQFT A9$10.25$74.99$10.00
0530Water blasting existing stripeLF A837$0.96$1.77$1.00
0540Detectable warningsSQFT A200$55.37$123.32$36.00
0550Pave mark TY 1 tape cross-hatchSQFT A444$36.00$42.31$36.00
0560Pave mark TY 1 tape-straight arrowEACH A6$825.00$1,035.05$825.00
0570Pave mark-thermo-X-walk-24 inLF A5,496$12.95$14.86$13.00
0580Pave mark TY 1 tape-bikeEACH A12$675.00$816.64$675.00
0590Pave mark TY 1 tape-bikeEACH A12$325.00$417.82$325.00
0600Pave mark TY 1 tape-curv arrowEACH A3$925.00$1,243.95$925.00
0610Pave stripe-wet ref tape-6 in YLF A797$6.05$7.61$6.00
0620Pave mark-thermo "bus" 8 FTEACH A1$395.00$1,019.85$395.00
0630Bike pathSQYD A595$116.00$133.14$116.00
0640Pave marking thermo-bike lane arrowEACH A26$125.00$164.35$125.00
0650Pave mark thermo cone cap-solid whiteSQFT A86$10.00$18.02$10.00
0660Pave stripe-contrast tape-6 in BLF A399$6.05$8.32$6.00
0670Pave marking-thermo shared lane markingEACH A5$325.00$484.29$325.00
0680Pave stripe-wet ref cont tape-6 in WLF A906$7.05$8.66$7.00
0690Adjust inletEACH A30$2,600.00$2,095.98$350.00
0700Reconstruct inletEACH A9$7,800.00$3,172.52$1,500.00
0710Adjust manhole frame to gradeEACH A4$1,300.00$2,859.46$375.00
0720PVC pipe-4 inLF A9$250.00$180.72$300.00
0730Trench drainLF A201$528.70$987.71$460.00
0740W valve box adjustEACH A27$600.00$609.49$125.00
0750G valve box adjustEACH A8$600.00$825.65$125.00
0760Remove and reinstall junction boxEACH A1$500.00$29,057$150.00
0770Remove light poleEACH A1$1,000.00$5,210.93$4,073.00
0780Utility coordinationLS A1$75,000$86,032$315,135
0790Temporary signsSQFT A500$6.00$44.34$6.00
0800SBM alum sheet signs .080 inSQFT A1,179.94$44.91$51.66$40.00
0810SBM alum sheet signs .125 inSQFT A8$46.00$123.64$40.00
0820Steel post type 1LF A882$34.84$40.35$40.00
0830Install span mounted signEACH A38$600.00$474.21$603.00
0840Install pole mounted signEACH A1$948.08$1,650.09$1,000.00
0850Remove signEACH A80$388.18$449.45$200.00
0860GMSS type DEACH A98$708.12$812.72$500.00
0870Barcode sign inventoryEACH A199$53.71$64.07$25.00
0880Bracket 8 FTEACH A45$1,000.00$1,726.47$1,504.00
0890Bracket 15 FTEACH A2$1,500.00$2,404.35$1,860.00
0900Pole baseEACH A2$3,500.00$4,558.00$3,750.00
0910Fused connector kitEACH A9$200.00$399.46$295.00
0920Trenching and backfillingLF A322$61.80$26.99$22.00
0930Open cut roadwayLF A80$256.45$241.86$206.00
0940Wire-no. 12LF A6,524$1.67$2.07$1.70
0950Cable-no. 14/7CLF A22,474$3.30$8.34$7.30
0960Messenger-10800 LBLF A3,015$12.00$10.66$9.00
0970Messenger-15400 LBLF A129$12.00$14.92$9.00
0980Messenger-26900 LBLF A101$12.00$16.53$10.00
0990Install steel strain poleEACH A46$16,927$7,068.17$6,192.00
1000Install pedestrian head-LEDEACH A96$1,100.00$541.50$470.00
1010Install LED signal-3 sectionEACH A105$700.00$509.09$442.00
1020Install LED signal-3 sectionEACH A9$850.00$735.61$590.00
1030Install coordinating unitEACH A12$2,500.00$4,958.72$4,310.00
1040Install ped detector-audibleEACH A96$650.00$425.27$368.00
1050Install luminaire poleEACH A2$3,500.00$3,555.24$2,870.00
1060Traffic signal pole baseCUYD A177$350.00$3,515.16$3,082.00
1070Install signal pedestalEACH A3$5,500.00$4,823.12$4,066.00
1080Remove & replace traffic signal boxLS A1$10,000$14,244$12,000
1090Install-beacon controller-2 circuitEACH A1$7,000.00$3,415.08$2,497.00
1100Tether wireLF A3,245$10.00$9.61$8.00
1110LED luminaireEACH A47$1,500.00$2,572.58$2,247.00
1120InstallEACH A1$5,000.12$3,714.77$2,760.00
1130PVC conduit-2 in-schedule 80LF A1,297$1.76$19.21$16.00
1140Install signal controller-TY atcEACH A12$8,000.00$14,205$12,424
1150Remove signal equipmentEACH A12$17,500$24,775$21,700
1160Install radar presence detector type AEACH A46$1,500.00$1,916.49$1,671.00
1170Remove trees or stumpsEACH A4$1,150.00$1,483.57$2,000.00
1180Tree trimmingLF A20$21.90$26.88$75.00
1190Temp mulchSQYD A174$4.00$42.44$100.00
1200Topsoil furnished and placedCUYD A13$250.00$448.78$100.00
1210MobilizationLS A1$240,000$260,885$270,000
1220DemobilizationLS A1$85,000$100,125$91,397
KYTC contract 25-4403: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of April 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy