KYTC contract 25-4403 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE MAIN STREET (US 31E). Let by Kentucky Transportation Cabinet on April 24, 2025, Jefferson, District 5. 3 bids received; low bid $5,477,000 by Mac Construction & Excavating Inc, +11% against the engineer's estimate of $4,928,122.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 APR 2025
- Pay items
- 122
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mac Construction & Excavating Inc | $5,477,000 | Low | +11% |
| 2 | Hall Contracting of Kentucky Inc | $5,615,470 | +3.0% | +14% |
| 3 | Pace Contracting LLC | $5,882,000 | +7.0% | +19% |
Engineer's estimate: $4,928,122.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mac Construction & Excavating Inc | 2. Hall Contracting of Kentucky Inc | 3. Pace Contracting LLC |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A | 161 | $140.00 | $143.98 | $112.00 |
| 0020 | Leveling & wedging PG64-22 | TON A | 143 | $145.00 | $119.00 | $103.00 |
| 0030 | CL3 asph base 1.00D PG64-22 | TON A | 15 | $1,150.00 | $359.52 | $518.00 |
| 0040 | CL3 asph surf 0.38B PG64-22 | TON A | 3,583 | $145.00 | $104.20 | $103.00 |
| 0050 | Cem conc ent pavement-8 in | SQYD A | 38 | $116.12 | $707.67 | $300.00 |
| 0060 | Mobilization for mill & text | LS A | 1 | $9,500.00 | $3,000.00 | $4,000.00 |
| 0070 | Asphalt pave milling & texturing | TON A | 3,583 | $36.00 | $39.50 | $42.60 |
| 0080 | Fuel adjustment | DOLL A | 7,024 | $1.00 | $1.00 | $1.00 |
| 0090 | Asphalt adjustment | DOLL A | 14,829 | $1.00 | $1.00 | $1.00 |
| 0100 | Asphalt material for tack non-tracking | TON A | 20.20 | $0.01 | $630.00 | $0.05 |
| 0110 | Electronic delivery MGMT system | LS A | 1 | $0.01 | $584.17 | $1.00 |
| 0120 | Standard header curb mod | LF A | 991 | $74.00 | $59.19 | $50.00 |
| 0130 | Special header curb | LF A | 201 | $84.00 | $145.35 | $55.00 |
| 0140 | Special header curb | LF A | 24 | $265.00 | $329.64 | $200.00 |
| 0150 | Remove curb | LF A | 1,000 | $47.00 | $30.84 | $25.00 |
| 0160 | Standard barrier median type 4 | SQYD A | 12 | $162.91 | $1,210.39 | $350.00 |
| 0170 | Standard barrier median type 4 mod | SQYD A | 499 | $157.29 | $184.35 | $184.00 |
| 0180 | Standard barrier median type 4 mod | SQYD A | 392 | $167.54 | $213.52 | $195.00 |
| 0190 | Standard barrier median type 4 mod | SQYD A | 2,950 | $138.48 | $117.00 | $125.60 |
| 0200 | Remove concrete island | SQYD A | 30 | $70.00 | $223.72 | $100.00 |
| 0210 | Remove PCC pavement | SQYD A | 93 | $55.00 | $63.61 | $75.00 |
| 0220 | Remove pavement | SQYD A | 3,993 | $19.00 | $26.39 | $32.00 |
| 0230 | Roadway excavation | CUYD A | 15 | $400.00 | $520.69 | $150.00 |
| 0240 | Maintain & control traffic | LS A | 1 | $581,425 | $134,035 | $636,067 |
| 0250 | Portable changeable message sign | EACH A | 2 | $5,000.00 | $6,552.13 | $9,500.00 |
| 0260 | Silt trap type C | EACH A | 71 | $150.00 | $452.57 | $75.00 |
| 0270 | Clean silt trap type C | EACH A | 71 | $25.00 | $43.41 | $20.00 |
| 0280 | Sidewalk-4 in concrete | SQYD A | 514 | $78.41 | $100.03 | $100.00 |
| 0290 | Remove concrete sidewalk | SQYD A | 495 | $93.00 | $56.54 | $40.00 |
| 0300 | Staking | LS A | 1 | $39,000 | $31,906 | $342,249 |
| 0310 | Arrow panel | EACH A | 2 | $2,700.00 | $3,418.50 | $3,000.00 |
| 0320 | Tubular markers | EACH A | 22 | $136.00 | $256.30 | $250.00 |
| 0330 | Pave striping-temp paint-6 in | LF A | 4,667 | $0.26 | $0.42 | $0.30 |
| 0340 | Pave striping-temp paint-12 in | LF A | 249 | $0.52 | $2.88 | $1.00 |
| 0350 | Pave striping-thermo-6 in W | LF A | 23,441 | $1.55 | $1.79 | $1.60 |
| 0360 | Pave striping-thermo-6 in Y | LF A | 13,658 | $1.45 | $1.69 | $1.50 |
| 0370 | Pave striping-thermo-12 in W | LF A | 3,440 | $2.80 | $3.36 | $3.00 |
| 0380 | Pave striping-temp rem tape-W | LF A | 178 | $2.75 | $6.33 | $3.00 |
| 0390 | Pave striping-dur TY 1-6 in W | LF A | 3,568 | $6.25 | $7.28 | $6.00 |
| 0400 | Pave striping-dur TY 1-6 in Y | LF A | 191 | $6.25 | $10.10 | $6.00 |
| 0410 | Pave marking-thermo X-walk-6 in | LF A | 5,129 | $4.25 | $4.95 | $4.00 |
| 0420 | Pave marking-thermo stop bar-24IN | LF A | 1,043 | $13.75 | $16.21 | $14.00 |
| 0430 | Pave marking-thermo cross-hatch | SQFT A | 4,084 | $5.95 | $6.92 | $6.00 |
| 0440 | Pave marking-thermo STR arrow | EACH A | 23 | $135.00 | $178.60 | $135.00 |
| 0450 | Pave marking-thermo curv arrow | EACH A | 54 | $150.00 | $181.48 | $150.00 |
| 0460 | Pave marking-thermo comb arrow | EACH A | 37 | $185.00 | $226.21 | $185.00 |
| 0470 | Pave marking-thermo only | EACH A | 13 | $305.00 | $391.37 | $305.00 |
| 0480 | Pavement marking removal | SQFT A | 279 | $15.00 | $19.13 | $15.00 |
| 0490 | Law enforcement officer | HOUR A | 200 | $90.00 | $99.71 | $75.00 |
| 0500 | Saw cut | LF A | 5,796 | $2.50 | $1.28 | $1.00 |
| 0510 | Pave marking thermo-bike | EACH A | 26 | $285.00 | $346.67 | $285.00 |
| 0520 | Pave mark thermo cone cap-solid yellow | SQFT A | 9 | $10.25 | $74.99 | $10.00 |
| 0530 | Water blasting existing stripe | LF A | 837 | $0.96 | $1.77 | $1.00 |
| 0540 | Detectable warnings | SQFT A | 200 | $55.37 | $123.32 | $36.00 |
| 0550 | Pave mark TY 1 tape cross-hatch | SQFT A | 444 | $36.00 | $42.31 | $36.00 |
| 0560 | Pave mark TY 1 tape-straight arrow | EACH A | 6 | $825.00 | $1,035.05 | $825.00 |
| 0570 | Pave mark-thermo-X-walk-24 in | LF A | 5,496 | $12.95 | $14.86 | $13.00 |
| 0580 | Pave mark TY 1 tape-bike | EACH A | 12 | $675.00 | $816.64 | $675.00 |
| 0590 | Pave mark TY 1 tape-bike | EACH A | 12 | $325.00 | $417.82 | $325.00 |
| 0600 | Pave mark TY 1 tape-curv arrow | EACH A | 3 | $925.00 | $1,243.95 | $925.00 |
| 0610 | Pave stripe-wet ref tape-6 in Y | LF A | 797 | $6.05 | $7.61 | $6.00 |
| 0620 | Pave mark-thermo "bus" 8 FT | EACH A | 1 | $395.00 | $1,019.85 | $395.00 |
| 0630 | Bike path | SQYD A | 595 | $116.00 | $133.14 | $116.00 |
| 0640 | Pave marking thermo-bike lane arrow | EACH A | 26 | $125.00 | $164.35 | $125.00 |
| 0650 | Pave mark thermo cone cap-solid white | SQFT A | 86 | $10.00 | $18.02 | $10.00 |
| 0660 | Pave stripe-contrast tape-6 in B | LF A | 399 | $6.05 | $8.32 | $6.00 |
| 0670 | Pave marking-thermo shared lane marking | EACH A | 5 | $325.00 | $484.29 | $325.00 |
| 0680 | Pave stripe-wet ref cont tape-6 in W | LF A | 906 | $7.05 | $8.66 | $7.00 |
| 0690 | Adjust inlet | EACH A | 30 | $2,600.00 | $2,095.98 | $350.00 |
| 0700 | Reconstruct inlet | EACH A | 9 | $7,800.00 | $3,172.52 | $1,500.00 |
| 0710 | Adjust manhole frame to grade | EACH A | 4 | $1,300.00 | $2,859.46 | $375.00 |
| 0720 | PVC pipe-4 in | LF A | 9 | $250.00 | $180.72 | $300.00 |
| 0730 | Trench drain | LF A | 201 | $528.70 | $987.71 | $460.00 |
| 0740 | W valve box adjust | EACH A | 27 | $600.00 | $609.49 | $125.00 |
| 0750 | G valve box adjust | EACH A | 8 | $600.00 | $825.65 | $125.00 |
| 0760 | Remove and reinstall junction box | EACH A | 1 | $500.00 | $29,057 | $150.00 |
| 0770 | Remove light pole | EACH A | 1 | $1,000.00 | $5,210.93 | $4,073.00 |
| 0780 | Utility coordination | LS A | 1 | $75,000 | $86,032 | $315,135 |
| 0790 | Temporary signs | SQFT A | 500 | $6.00 | $44.34 | $6.00 |
| 0800 | SBM alum sheet signs .080 in | SQFT A | 1,179.94 | $44.91 | $51.66 | $40.00 |
| 0810 | SBM alum sheet signs .125 in | SQFT A | 8 | $46.00 | $123.64 | $40.00 |
| 0820 | Steel post type 1 | LF A | 882 | $34.84 | $40.35 | $40.00 |
| 0830 | Install span mounted sign | EACH A | 38 | $600.00 | $474.21 | $603.00 |
| 0840 | Install pole mounted sign | EACH A | 1 | $948.08 | $1,650.09 | $1,000.00 |
| 0850 | Remove sign | EACH A | 80 | $388.18 | $449.45 | $200.00 |
| 0860 | GMSS type D | EACH A | 98 | $708.12 | $812.72 | $500.00 |
| 0870 | Barcode sign inventory | EACH A | 199 | $53.71 | $64.07 | $25.00 |
| 0880 | Bracket 8 FT | EACH A | 45 | $1,000.00 | $1,726.47 | $1,504.00 |
| 0890 | Bracket 15 FT | EACH A | 2 | $1,500.00 | $2,404.35 | $1,860.00 |
| 0900 | Pole base | EACH A | 2 | $3,500.00 | $4,558.00 | $3,750.00 |
| 0910 | Fused connector kit | EACH A | 9 | $200.00 | $399.46 | $295.00 |
| 0920 | Trenching and backfilling | LF A | 322 | $61.80 | $26.99 | $22.00 |
| 0930 | Open cut roadway | LF A | 80 | $256.45 | $241.86 | $206.00 |
| 0940 | Wire-no. 12 | LF A | 6,524 | $1.67 | $2.07 | $1.70 |
| 0950 | Cable-no. 14/7C | LF A | 22,474 | $3.30 | $8.34 | $7.30 |
| 0960 | Messenger-10800 LB | LF A | 3,015 | $12.00 | $10.66 | $9.00 |
| 0970 | Messenger-15400 LB | LF A | 129 | $12.00 | $14.92 | $9.00 |
| 0980 | Messenger-26900 LB | LF A | 101 | $12.00 | $16.53 | $10.00 |
| 0990 | Install steel strain pole | EACH A | 46 | $16,927 | $7,068.17 | $6,192.00 |
| 1000 | Install pedestrian head-LED | EACH A | 96 | $1,100.00 | $541.50 | $470.00 |
| 1010 | Install LED signal-3 section | EACH A | 105 | $700.00 | $509.09 | $442.00 |
| 1020 | Install LED signal-3 section | EACH A | 9 | $850.00 | $735.61 | $590.00 |
| 1030 | Install coordinating unit | EACH A | 12 | $2,500.00 | $4,958.72 | $4,310.00 |
| 1040 | Install ped detector-audible | EACH A | 96 | $650.00 | $425.27 | $368.00 |
| 1050 | Install luminaire pole | EACH A | 2 | $3,500.00 | $3,555.24 | $2,870.00 |
| 1060 | Traffic signal pole base | CUYD A | 177 | $350.00 | $3,515.16 | $3,082.00 |
| 1070 | Install signal pedestal | EACH A | 3 | $5,500.00 | $4,823.12 | $4,066.00 |
| 1080 | Remove & replace traffic signal box | LS A | 1 | $10,000 | $14,244 | $12,000 |
| 1090 | Install-beacon controller-2 circuit | EACH A | 1 | $7,000.00 | $3,415.08 | $2,497.00 |
| 1100 | Tether wire | LF A | 3,245 | $10.00 | $9.61 | $8.00 |
| 1110 | LED luminaire | EACH A | 47 | $1,500.00 | $2,572.58 | $2,247.00 |
| 1120 | Install | EACH A | 1 | $5,000.12 | $3,714.77 | $2,760.00 |
| 1130 | PVC conduit-2 in-schedule 80 | LF A | 1,297 | $1.76 | $19.21 | $16.00 |
| 1140 | Install signal controller-TY atc | EACH A | 12 | $8,000.00 | $14,205 | $12,424 |
| 1150 | Remove signal equipment | EACH A | 12 | $17,500 | $24,775 | $21,700 |
| 1160 | Install radar presence detector type A | EACH A | 46 | $1,500.00 | $1,916.49 | $1,671.00 |
| 1170 | Remove trees or stumps | EACH A | 4 | $1,150.00 | $1,483.57 | $2,000.00 |
| 1180 | Tree trimming | LF A | 20 | $21.90 | $26.88 | $75.00 |
| 1190 | Temp mulch | SQYD A | 174 | $4.00 | $42.44 | $100.00 |
| 1200 | Topsoil furnished and placed | CUYD A | 13 | $250.00 | $448.78 | $100.00 |
| 1210 | Mobilization | LS A | 1 | $240,000 | $260,885 | $270,000 |
| 1220 | Demobilization | LS A | 1 | $85,000 | $100,125 | $91,397 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.