Pace Contracting LLC: KYTC bid record
Pace Contracting LLC submitted 10 bids on Kentucky Transportation Cabinet contracts in the data, from 23 MAY 2024 to 24 APR 2025, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $0
- Latest bid
- 24 APR 2025
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 9 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 5 | 0 | 0% |
| District 5 | 4 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary signs | SQFT A | 9 | 9 (100%) | $5.00 | $6.44 | |
| Lane closure | EACH A | 7 | 7 (100%) | $750.00 | $3,900.00 | |
| Conc class M full depth patch | CUYD A | 7 | 4 (57%) | $750.00 | $1,075.00 | |
| Epoxy sand slurry | SQYD A | 7 | 3 (43%) | $25.00 | $35.00 | |
| Blast cleaning | SQYD A | 7 | 3 (43%) | $10.00 | $10.00 | |
| Bridge overlay approach pavement | SQYD A | 8 | 2 (25%) | $40.00 | $46.00 | |
| Maintain & control traffic | LS A | 10 | 1 (10%) | $81,500 | $11,500 | |
| Pave striping-perm paint-4 in | LF A | 9 | 1 (11%) | $2.00 | $0.34 | |
| Armored edge for concrete | LF A | 9 | 1 (11%) | $150.00 | $105.84 | |
| Pave striping-temp rem tape-B | LF A | 7 | 1 (14%) | $2.00 | $2.00 | |
| Dga base | TON | 5 | 1 (20%) | $75.00 | $45.00 | |
| Steel reinforcement-epoxy coated | LB | 5 | 1 (20%) | $2.00 | $2.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Services Co Inc | 6 | 5 of 6 |
| Hinkle Construction Services LLC | 5 | 2 of 5 |
| Galusha Contracting LLC | 4 | 4 of 4 |
| Jave LLC | 4 | 3 of 4 |
| Hall Contracting of Kentucky Inc | 4 | 2 of 4 |
| Scott and Murphy Inc | 3 | 2 of 3 |
| E & B Paving LLC | 3 | 2 of 3 |
| Todd Johnson Contracting Inc | 3 | 2 of 3 |
| American Contracting & Services Inc | 2 | 1 of 2 |
| Cambry Contracting Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 APR 2025 | 25-4403 | District 5 | GRADE & DRAIN WITH ASPHALT SURFACE MAIN STREET (US 31E) | 3 of 3 | $5,882,000 | +7.0% |
| 12 DEC 2024 | 24-2904 | District 4 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN HARDIN COUNTY ~ 4 LOCATIONS | 4 of 4 | $1,657,000 | +95% |
| 14 NOV 2024 | 24-2943 | District 7 | BRIDGE REPLACEMENT BIRDIE ROAD (KY 395) | 9 of 9 | $959,000 | +35% |
| 14 NOV 2024 | 24-2906 | District 4 | BRIDGE WITH GRADE & DRAIN SHORT LINE PIKE (KY 1195) | 4 of 7 | $621,000 | +43% |
| 14 NOV 2024 | 24-2954 | District 5 | BRIDGE DECK RESTORATION & WATERPROOFING PRESTON HIGHWAY (KY 61) | 5 of 5 | $3,367,000 | +111% |
| 24 OCT 2024 | 24-2958 | District 4 | BRIDGE SUPERSTRUCTURE REPLACEMENT BOSTON ROAD (KY 62) | 6 of 8 | $549,000 | +20% |
| 18 JUL 2024 | 24-5357 | District 5 | BRIDGE REPLACEMENT I-64 | 2 of 4 | $8,085,048 | +21% |
| 18 JUL 2024 | 24-5356 | District 5 | BRIDGE REPLACEMENT CR 1004 | 2 of 6 | $858,839 | +2.0% |
| 18 JUL 2024 | 24-3038 | District 4 | JPC PAVEMENT BATTLETOWN RD (KY 228) | 2 of 3 | $356,420 | +21% |
| 23 MAY 2024 | 24-5349 | District 4 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 4 | 5 of 6 | $1,821,000 | +20% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.