KYTC contract 25-5378 bid tabulation
BRIDGE REPLACEMENT ROCKPORT FERRY ROAD (CR 1068). Let by Kentucky Transportation Cabinet on April 24, 2025, Daviess, District 2. 3 bids received; low bid $192,379 by Scott and Murphy Inc, +4.8% against the engineer's estimate of $183,655.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 APR 2025
- Pay items
- 20
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scott and Murphy Inc | $192,379 | Low | +5.0% |
| 2 | Mac Construction & Excavating Inc | $300,000 | +56% | +63% |
| 3 | Hinkle Contracting Company LLC | $359,564 | +87% | +96% |
Engineer's estimate: $183,655.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scott and Murphy Inc | 2. Mac Construction & Excavating Inc | 3. Hinkle Contracting Company LLC |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A | 37 | $90.00 | $100.00 | $75.00 |
| 0020 | Asphalt seal aggregate | TON A | 1.42 | $1,200.00 | $3,500.00 | $1,200.00 |
| 0030 | Asphalt seal coat | TON A | 0.17 | $3,500.00 | $1,000.00 | $3,500.00 |
| 0040 | CL2 asph base 1.00D PG64-22 | TON A | 10 | $375.00 | $700.00 | $375.00 |
| 0050 | CL2 asph surf 0.38D PG64-22 | TON A | 11 | $395.00 | $700.00 | $395.00 |
| 0060 | Barricade-type III | EACH A | 2 | $200.00 | $175.00 | $175.00 |
| 0070 | Channel lining class III | TON A | 76 | $70.00 | $114.00 | $145.00 |
| 0080 | Clearing and grubbing | LS A | 1 | $5,700.00 | $33,079 | $12,500 |
| 0090 | Temporary signs | SQFT A | 20 | $26.00 | $15.00 | $40.00 |
| 0100 | Edge key | LF A | 29 | $175.00 | $155.00 | $175.00 |
| 0110 | Fabric-geotextile class 1 | SQYD A | 76 | $5.00 | $12.00 | $20.00 |
| 0120 | Fabric-geotextile class 2 for pipe | SQYD A | 330 | $2.00 | $2.00 | $2.00 |
| 0130 | Maintain & control traffic | LS A | 1 | $600.00 | $4,000.00 | $60,000 |
| 0140 | Portable changeable message sign | EACH A | 1 | $1,400.00 | $1,500.00 | $1,000.00 |
| 0150 | Staking | LS A | 1 | $1,000.00 | $4,500.00 | $5,000.00 |
| 0160 | Remove structure | LS A | 1 | $42,300 | $45,000 | $60,000 |
| 0170 | Earthwork | LS A | 1 | $10,800 | $12,000 | $49,650 |
| 0180 | Erosion control | LS A | 1 | $2,800.00 | $4,500.00 | $20,000 |
| 0190 | Culvert pipe-120 in equiv | LF A | 38 | $2,600.00 | $4,000.00 | $2,985.00 |
| 0200 | Demobilization | LS A | 1 | $2,900.00 | $4,500.00 | $5,390.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.