KYTC contract 26-1110 bid tabulation
ASPHALT PAVEMENT & ROADWAY REHAB I-64 PAVEMENT REHABILITATION SCOTT COUNTY. Let by Kentucky Transportation Cabinet on February 19, 2026. 1 bid received; low bid $14,439,066 by L-M Asphalt Partners LTD D/B/A Ats Construction, +6.2% against the engineer's estimate of $13,591,427.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 19 FEB 2026
- Pay items
- 160
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $14,439,066 | Low | +6.0% |
Engineer's estimate: $13,591,427.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L-M Asphalt Partners LTD D/B/A Ats Construction |
|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,049 | $50.00 |
| 0020 | Asphalt seal aggregate | TON A A | 71 | $160.00 |
| 0030 | Asphalt seal coat | TON A A | 11 | $1,350.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 891 | $98.00 |
| 0050 | Leveling & wedging PG76-22 | TON A A | 339 | $98.00 |
| 0060 | CL4 asph base 1.00D PG64-22 | TON A A | 2,229 | $98.00 |
| 0070 | CL3 asph surf 0.38D PG64-22 | TON A A | 10,001 | $99.80 |
| 0080 | CL4 asph surf 0.38A PG76-22 | TON A A | 26,289 | $135.00 |
| 0090 | Asphalt material for tack | TON A A | 161 | $0.01 |
| 0100 | Joint adhesive | LF A A | 177,664 | $0.40 |
| 0110 | Pave mount infrared temp equipment | SF A A | 2,319,466 | $0.01 |
| 0120 | Delineator for guardrail mono directional white | EACH A A | 8 | $13.00 |
| 0130 | Delineator for guardrail mono directional yello | EACH A A | 40 | $13.00 |
| 0140 | Relocate temp conc barrier | LF A A | 3,672 | $45.00 |
| 0150 | Barricade-type III | EACH A A | 62 | $0.01 |
| 0160 | Embankment in place | CUYD A A | 4,508 | $95.00 |
| 0170 | Guardrail-steel W beam-S face | LF A A | 2,200 | $28.50 |
| 0180 | Guardrail end treatment type 2M | EACH A A | 2 | $2,100.00 |
| 0190 | Remove guardrail | LF A A | 1,668 | $2.50 |
| 0200 | Temporary signs | SQFT A A | 3,500 | $12.72 |
| 0210 | Maintain & control traffic | LS A A | 1 | $290,000 |
| 0220 | Maintain & control traffic | LS A A | 1 | $290,000 |
| 0230 | Maintain & control traffic | LS A A | 1 | $290,000 |
| 0240 | Truck mounted attenuator | EACH A A | 4 | $15,000 |
| 0250 | Portable changeable message sign | EACH A A | 10 | $5,500.00 |
| 0260 | Asphalt pave milling & texturing | TON A A | 30,560 | $26.45 |
| 0270 | Safeloading | CUYD A A | 22 | $190.00 |
| 0280 | Edgeline rumble strips | LF A A | 212,018 | $0.18 |
| 0290 | Staking | LS A A | 1 | $85,000 |
| 0300 | Staking | LS A A | 1 | $85,000 |
| 0310 | Staking | LS A A | 1 | $85,000 |
| 0320 | Relocate crash cushion | EACH A A | 6 | $3,500.00 |
| 0330 | Conc barrier wall type 9T | LF A A | 1,340 | $60.00 |
| 0340 | Base failure repair | SQYD A A | 3,475 | $175.00 |
| 0350 | Initial fertilizer | TON A A | 0.70 | $1,600.00 |
| 0360 | Seeding and protection | SQYD A A | 13,144 | $0.67 |
| 0370 | Agricultural limestone | TON A A | 9 | $85.00 |
| 0380 | Pave striping-temp paint-6 in | LF A A | 189,438 | $0.26 |
| 0390 | Pave striping-thermo-6 in W | LF A A | 123,881 | $1.05 |
| 0400 | Pave striping-thermo-6 in Y | LF A A | 90,393 | $1.05 |
| 0410 | Pave striping-thermo-12 in W | LF A A | 5,445 | $2.50 |
| 0420 | Pave striping-dur TY 1-6 in W | LF A A | 1,128 | $9.00 |
| 0430 | Pave striping-dur TY 1-6 in Y | LF A A | 178 | $10.00 |
| 0440 | Pave marking-thermo cross-hatch | SQFT A A | 3,591 | $4.00 |
| 0450 | Inlaid pavement marker-B W/R | EACH A A | 1,014 | $30.00 |
| 0460 | Inlaid pavement marker-B Y/R | EACH A A | 120 | $30.00 |
| 0470 | Crash cushion TY 6 class T TL3 | EACH A A | 2 | $3,000.00 |
| 0480 | Fuel adjustment | DOLL A A | 20,874 | $1.00 |
| 0490 | Asphalt adjustment | DOLL A A | 161,028 | $1.00 |
| 0500 | Law enforcement officer | HOUR A A | 400 | $100.00 |
| 0510 | Thrie beam to W beam connector | EACH A A | 22 | $350.00 |
| 0520 | Bridge barrier retrofit | LF A A | 1,816 | $241.00 |
| 0530 | High tension cable-rope barrier | LF A A | 314 | $35.00 |
| 0540 | End anchors | EACH A A | 5 | $11,500 |
| 0550 | Remove cable guardrail barrier system | LF A A | 602 | $1.95 |
| 0560 | Pave mark thermo-wrong way arrow | EACH A A | 8 | $375.00 |
| 0570 | Thrie beam guardrail transition TL-3 | EACH A A | 16 | $3,600.00 |
| 0580 | Portable queue warning alert system | MONT A A | 8 | $15,000 |
| 0590 | Queue warning PCMS | MONT A A | 48 | $6,000.00 |
| 0600 | Queue warning portable radar sensors | MONT A A | 48 | $0.01 |
| 0610 | Mobilization for concrete surf treatment | LS A A | 1 | $1,000.00 |
| 0620 | Mobilization for concrete surf treatment | LS A A | 1 | $1,000.00 |
| 0630 | Mobilization for concrete surf treatment | LS A A | 1 | $1,000.00 |
| 0640 | Thrie beam bullnose terminal | EACH A A | 12 | $30,008 |
| 0650 | Connected arrow panel | MONT A A | 16 | $300.00 |
| 0660 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 |
| 0670 | Storm sewer pipe-24 in | LF A A | 49 | $180.00 |
| 0680 | Remove pipe | LF A A | 76 | $50.00 |
| 0690 | Drop box inlet type 5B | EACH A A | 1 | $12,000 |
| 0700 | Drop box inlet type 5C | EACH A A | 1 | $10,000 |
| 0710 | Remove drop box inlet | EACH A A | 4 | $2,000.00 |
| 0720 | Flume inlet type 1 | EACH A A | 4 | $10,000 |
| 0730 | Expan joint replace 4 in | LF A A | 70.60 | $1,275.00 |
| 0740 | Armored edge for concrete | LF A A | 70.60 | $200.00 |
| 0750 | Steel reinforcement | LB A A | 270 | $2.00 |
| 0760 | Clean & paint structural steel | LS A A | 1 | $426,846 |
| 0770 | Bearing retainer | EACH A A | 8 | $840.00 |
| 0780 | Bridge cleaning | LS A A | 1 | $2,500.00 |
| 0790 | Concrete coating | LS A A | 1 | $2,500.00 |
| 0800 | Temporary signs | SQFT A A | 100 | $12.72 |
| 0810 | Maintain & control traffic | LS A A | 1 | $57,000 |
| 0820 | Lane closure | EACH A A | 1 | $0.01 |
| 0830 | Clean & paint structural steel | LS A A | 1 | $274,815 |
| 0840 | Bearing retainer | EACH A A | 12 | $840.00 |
| 0850 | Joint seal replacement | LF A A | 73.60 | $375.00 |
| 0860 | Joint seal replacement | LF A A | 73.60 | $225.00 |
| 0870 | Bridge cleaning | LS A A | 1 | $2,500.00 |
| 0880 | Concrete coating | LS A A | 1 | $2,500.00 |
| 0890 | Temporary signs | SQFT A A | 100 | $12.72 |
| 0900 | Maintain & control traffic | LS A A | 1 | $57,000 |
| 0910 | Lane closure | EACH A A | 1 | $0.01 |
| 0920 | Clean & paint structural steel | LS A A | 1 | $274,815 |
| 0930 | Bearing retainer | EACH A A | 12 | $840.00 |
| 0940 | Joint seal replacement | LF A A | 73.60 | $375.00 |
| 0950 | Joint seal replacement | LF A A | 73.60 | $225.00 |
| 0960 | Bridge cleaning | LS A A | 1 | $2,500.00 |
| 0970 | Concrete coating | LS A A | 1 | $2,500.00 |
| 0980 | Expan joint replace 4 in | LF A A | 78.50 | $1,250.00 |
| 0990 | Armored edge for concrete | LF A A | 78.50 | $200.00 |
| 1000 | Bridge overlay approach pavement | SQYD A A | 873 | $45.00 |
| 1010 | Pave striping-perm paint-4 in | LF A A | 915 | $0.50 |
| 1020 | Steel reinforcement | LB A A | 270 | $2.00 |
| 1030 | Clean & paint structural steel | LS A A | 1 | $169,901 |
| 1040 | Epoxy sand slurry | SQYD A A | 91 | $55.00 |
| 1050 | Conc class M full depth patch | CUYD A A | 1 | $2,500.00 |
| 1060 | Concrete overlay-latex | CUYD A A | 30.20 | $3,500.00 |
| 1070 | Blast cleaning | SQYD A A | 815 | $16.00 |
| 1080 | Machine prep of slab | SQYD A A | 724 | $62.00 |
| 1090 | Partial depth patching | CUYD A A | 25 | $1,500.00 |
| 1100 | Bridge cleaning | LS A A | 1 | $2,500.00 |
| 1110 | Concrete coating | LS A A | 1 | $2,500.00 |
| 1120 | Expan joint replace 4 in | LF A A | 78.50 | $1,250.00 |
| 1130 | Armored edge for concrete | LF A A | 78.50 | $200.00 |
| 1140 | Bridge overlay approach pavement | SQYD A A | 873 | $45.00 |
| 1150 | Pave striping-perm paint-4 in | LF A A | 915 | $0.50 |
| 1160 | Steel reinforcement | LB A A | 270 | $2.00 |
| 1170 | Clean & paint structural steel | LS A A | 1 | $169,901 |
| 1180 | Epoxy sand slurry | SQYD A A | 91 | $55.00 |
| 1190 | Conc class M full depth patch | CUYD A A | 1 | $2,500.00 |
| 1200 | Concrete overlay-latex | CUYD A A | 30.20 | $3,500.00 |
| 1210 | Blast cleaning | SQYD A A | 815 | $16.00 |
| 1220 | Machine prep of slab | SQYD A A | 724 | $62.00 |
| 1230 | Partial depth patching | CUYD A A | 25 | $1,500.00 |
| 1240 | Bridge cleaning | LS A A | 1 | $2,500.00 |
| 1250 | Concrete coating | LS A A | 1 | $2,500.00 |
| 1260 | Remove concrete masonry | CUYD A A | 22 | $385.00 |
| 1270 | Structure excavation-common | CUYD A A | 41 | $10.00 |
| 1280 | Concrete-class A | CUYD A A | 45 | $1,686.00 |
| 1290 | Steel reinforcement | LB A A | 1,301 | $5.00 |
| 1300 | Concrete sealing | SQFT A A | 2,628 | $5.75 |
| 1310 | Misc demo and disposal | LS A A | 1 | $1,000.00 |
| 1320 | Remove concrete masonry | CUYD A A | 22 | $385.00 |
| 1330 | Structure excavation-common | CUYD A A | 40 | $10.00 |
| 1340 | Concrete-class A | CUYD A A | 44 | $1,686.00 |
| 1350 | Steel reinforcement | LB A A | 1,402 | $5.00 |
| 1360 | Concrete sealing | SQFT A A | 3,456 | $5.75 |
| 1370 | Misc demo and disposal | LS A A | 1 | $1,000.00 |
| 1380 | Remove concrete masonry | CUYD A A | 20 | $385.00 |
| 1390 | Structure excavation-common | CUYD A A | 35 | $10.00 |
| 1400 | Concrete-class A | CUYD A A | 41 | $1,686.00 |
| 1410 | Steel reinforcement | LB A A | 1,260 | $5.00 |
| 1420 | Concrete sealing | SQFT A A | 2,511 | $5.75 |
| 1430 | Misc demo and disposal | LS A A | 1 | $1,000.00 |
| 1440 | Remove concrete masonry | CUYD A A | 20 | $385.00 |
| 1450 | Structure excavation-common | CUYD A A | 35 | $10.00 |
| 1460 | Concrete-class A | CUYD A A | 41 | $1,686.00 |
| 1470 | Steel reinforcement | LB A A | 1,260 | $5.00 |
| 1480 | Concrete sealing | SQFT A A | 2,241 | $5.75 |
| 1490 | Misc demo and disposal | LS A A | 1 | $1,000.00 |
| 1500 | Conduit-1 1/4 in | LF A A | 120 | $7.17 |
| 1510 | Conduit-2 in | LF A A | 60 | $9.91 |
| 1520 | Trenching and backfilling | LF A A | 170 | $15.00 |
| 1530 | Piezoelectric sensor | EACH A A | 8 | $3,556.00 |
| 1540 | Loop wire | LF A A | 3,580 | $0.25 |
| 1550 | Loop saw slot and fill | LF A A | 660 | $19.70 |
| 1560 | Galvanized steel cabinet | EACH A A | 2 | $3,675.00 |
| 1570 | Wood post | EACH A A | 4 | $500.00 |
| 1580 | Electrical junction box type A | EACH A A | 4 | $2,700.00 |
| 1590 | Mobilization | LS A A | 1 | $663,000 |
| 1600 | Demobilization | LS A A | 1 | $202,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 19, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.