KYTC contract 26-2010 bid tabulation
WATERBOURNE PAINT STRIPING VARIOUS ROUTES IN DISTRICT 10. Let by Kentucky Transportation Cabinet on February 19, 2026. 4 bids received; low bid $1,678,000 by Pavement Marking Specialist LLC, -26% against the engineer's estimate of $2,276,833.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 19 FEB 2026
- Pay items
- 12
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Pavement Marking Specialist LLC | $1,678,000 | Low | -26% |
| 2 | Reynolds-Central Seal A Joint Venture | $1,737,000 | +4.0% | -24% |
| 3 | Oglesby Construction Inc | $1,744,361 | +4.0% | -23% |
| 4 | Mullen'S Markings Inc | $1,916,352 | +14% | -16% |
Engineer's estimate: $2,276,833.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pavement Marking Specialist LLC | 2. Reynolds-Central Seal A Joint Venture | 3. Oglesby Construction Inc | 4. Mullen'S Markings Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Quality control | LS | 1 | $20,000 | $25,000 | $20,000 | $30,000 |
| 0020 | Maintain & control traffic | LS | 1 | $15,000 | $40,000 | $40,000 | $60,000 |
| 0030 | Pave striping-WB paint-4 in W | MI | 281.94 | $430.00 | $445.00 | $445.00 | $468.60 |
| 0040 | Pave striping-WB paint-4 in W | MI | 722.02 | $430.00 | $445.00 | $445.00 | $468.60 |
| 0050 | Pave striping-WB paint-4 in Y | MI | 568.50 | $441.00 | $465.00 | $480.00 | $485.76 |
| 0060 | Pave striping-WB paint-4 in Y | MI | 785.44 | $441.00 | $465.00 | $480.00 | $485.76 |
| 0070 | Law enforcement officer | HR | 24 | $80.00 | $105.00 | $100.00 | $80.00 |
| 0080 | Water blasting existing stripe | LF | 500 | $5.00 | $3.00 | $3.00 | $3.00 |
| 0090 | Retroreflectometer | EACH | 2 | $27,000 | $30,000 | $30,000 | $35,000 |
| 0100 | Durable waterborne marking-6 in W | MI | 258.49 | $1,049.00 | $975.00 | $960.00 | $1,191.36 |
| 0110 | Durable waterborne marking-6 in Y | MI | 241.62 | $1,072.00 | $1,050.00 | $1,025.00 | $1,193.96 |
| 0120 | Demobilization | LS | 1 | $25,620 | $25,910 | $28,000 | $28,350 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 19, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.