KYTC contract 26-2098 bid tabulation
PAVEMENT (WITH ALTERNATES) BYPASS ROAD (US 68). Let by Kentucky Transportation Cabinet on February 19, 2026. 4 bids received; low bid $1,218,556 by Rogers Group Inc, +2.0% against the engineer's estimate of $1,194,101.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 19 FEB 2026
- Pay items
- 18
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rogers Group Inc | $1,218,556 | Low | +2.0% |
| 2 | Strawser Construction Inc | $1,246,632 | +2.0% | +4.0% |
| 3 | Central Paving Company of Paducah | $1,297,533 | +6.0% | +9.0% |
| 4 | Asphalt Paving Systems Inc | $2,410,994 | +98% | +102% |
Engineer's estimate: $1,194,101.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group Inc | 2. Strawser Construction Inc | 3. Central Paving Company of Paducah | 4. Asphalt Paving Systems Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Pave striping-temp paint-4 in | LF A A | 120,000 | $0.15 | $0.36 | ||
| 0020 | Microsurfacing-leveling course | SQYD A A | 165,049 | $2.31 | $4.44 | ||
| 0030 | Microsurfacing-surface course - type B | SQYD A A | 165,049 | $3.31 | $4.43 | ||
| 0040 | Asphalt material for tack | TON A A | 69 | $1,034.85 | $950.00 | ||
| 0050 | Mobilization for mill & text | LS A A | 1 | $1,029.99 | $17,500 | ||
| 0060 | Asphalt pave milling & texturing | TON A A | 60 | $173.04 | $90.00 | ||
| 0070 | Pave striping-temp paint-4 in | LF A A | 10,000 | $0.30 | $0.35 | ||
| 0080 | CL3 asph surf no.4B PG64-22 | TON A A | 6,805 | $120.19 | $128.50 | ||
| 0090 | Temporary signs | SQFT A A | 270 | $8.48 | $17.00 | $12.00 | $16.80 |
| 0100 | Maintain & control traffic | LS A A | 1 | $14,068 | $83,647 | $26,500 | $71,750 |
| 0110 | Portable changeable message sign | EACH A A | 2 | $750.00 | $850.00 | $4,500.00 | $840.00 |
| 0120 | Arrow panel | EACH A A | 2 | $510.00 | $580.00 | $1,500.00 | $570.00 |
| 0130 | Pave striping removal-6 in | LF A A | 120,000 | $0.48 | $0.40 | $0.55 | $0.58 |
| 0140 | Pave striping-thermo-6 in W | LF A A | 60,000 | $1.40 | $1.15 | $1.55 | $1.68 |
| 0150 | Pave striping-thermo-6 in Y | LF A A | 60,000 | $1.40 | $1.15 | $1.55 | $1.68 |
| 0160 | Pave marking-thermo curv arrow | EACH A A | 40 | $110.00 | $70.00 | $135.00 | $132.00 |
| 0170 | Pave marking-thermo comb arrow | EACH A A | 8 | $200.00 | $145.00 | $250.00 | $240.00 |
| 0180 | Demobilization | LS A A | 1 | $64,369 | $20,000 | $30,000 | $546,303 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 19, 2026. Compiled by Mirage Metrics.