KYTC contract 26-2185 bid tabulation
ASPHALT RESURFACING RICHMOND ROAD (US 25). Let by Kentucky Transportation Cabinet on September 3, 2026. 2 bids received; low bid $739,008 by L-M Asphalt Partners LTD D/B/A Ats Construction, -13% against the engineer's estimate of $850,017.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 03 SEP 2026
- Pay items
- 34
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $739,008 | Low | -13% |
| 2 | Louisville Paving Company Inc | $799,000 | +8.0% | -6.0% |
Engineer's estimate: $850,017.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L-M Asphalt Partners LTD D/B/A Ats Construction | 2. Louisville Paving Company Inc |
|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 675 | $105.00 | $112.00 |
| 0020 | Temporary signs | SQFT A A | 790 | $8.48 | $5.00 |
| 0030 | Maintain & control traffic | LS A A | 1 | $11,500 | $65,100 |
| 0040 | Portable changeable message sign | EACH A A | 3 | $662.50 | $636.00 |
| 0050 | Mobilization for mill & text | LS A A | 1 | $2,000.00 | $7,150.00 |
| 0060 | Asphalt pave milling & texturing | TON A A | 3,520 | $27.50 | $23.25 |
| 0070 | Arrow panel | EACH A A | 2 | $397.50 | $424.00 |
| 0080 | Base failure repair | SQYD A A | 535 | $78.00 | $58.00 |
| 0090 | Conduit-1 1/4 in | LF A A | 15 | $17.63 | $17.63 |
| 0100 | Trenching and backfilling | LF A A | 10 | $39.93 | $39.93 |
| 0110 | Piezoelectric sensor | EACH A A | 4 | $3,143.98 | $3,143.98 |
| 0120 | Loop wire | LF A A | 700 | $1.15 | $1.15 |
| 0130 | Loop saw slot and fill | LF A A | 175 | $42.76 | $42.76 |
| 0140 | Remove and replace sidewalk | SQYD A A | 2 | $1,181.79 | $525.00 |
| 0150 | Pave striping-temp paint-6 in | LF A A | 32,500 | $0.13 | $0.13 |
| 0160 | Pave striping-thermo-6 in W | LF A A | 20,500 | $0.82 | $0.82 |
| 0170 | Pave striping-thermo-6 in Y | LF A A | 12,000 | $0.82 | $0.82 |
| 0180 | Pave marking-thermo X-walk-12 in | LF A A | 1,075 | $3.20 | $3.20 |
| 0190 | Pave marking-thermo stop bar-24IN | LF A A | 264 | $6.90 | $6.90 |
| 0200 | Pave marking-thermo cross-hatch | SQFT A A | 100 | $2.50 | $2.50 |
| 0210 | Pave marking-thermo curv arrow | EACH A A | 16 | $95.00 | $95.00 |
| 0220 | Fuel adjustment | DOLL A A | 5,215 | $1.00 | $1.00 |
| 0230 | Asphalt adjustment | DOLL A A | 13,097 | $1.00 | $1.00 |
| 0240 | Wood post | EACH A A | 1 | $713.17 | $713.17 |
| 0250 | Law enforcement officer | HOUR A A | 120 | $80.00 | $80.00 |
| 0260 | Electrical junction box-10 X 8 X 4 | EACH A A | 1 | $594.53 | $594.53 |
| 0270 | Pave marking thermo-bike | EACH A A | 16 | $205.00 | $205.00 |
| 0280 | Pave mark thermo cone cap-solid yellow | SQFT A A | 50 | $6.20 | $6.20 |
| 0290 | CL3 asph surf 0.38A PG64-22 | TON A A | 3,520 | $105.00 | $112.00 |
| 0300 | Pave marking thermo-bike lane arrow | EACH A A | 16 | $145.00 | $145.00 |
| 0310 | Pave marking-thermo dotted lane exten | LF A A | 260 | $2.65 | $2.65 |
| 0320 | Asphalt material for tack non-tracking | TON A A | 24 | $0.01 | $0.01 |
| 0330 | Install radar presence detector type A | EACH A A | 19 | $1,508.11 | $1,508.11 |
| 0340 | Demobilization | LS A A | 1 | $10,750 | $12,377 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 3, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.