MoDOT contract 250314-C14 bid tabulation

JKU0370-VARIOUS ROUTES-JACKSON, CLAY COUNTIES. Let by Missouri DOT on March 14, 2025, Jackson, Kansas City. 2 bids received; low bid $306,132 by WJ Surface Treatments, LLC.

Owner
Missouri DOT
Letting
14 MAR 2025
Pay items
11
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1WJ Surface Treatments, LLC$306,132Low
2The Truesdell Corporation of Wisconsin, Inc.dba Truesdell Corporation$439,439+44%
MoDOT contract 250314-C14: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. WJ Surface Treatments, LLC2. The Truesdell Corporation of Wisconsin, Inc.dba Truesdell Corporation
0010Misc.high friction surface treatment- bauxite (4139905)SY9,395$20.68$23.50
0020Construction signs (6161005)SF490$8.18$8.00
0030Channelizer (trim line) (6161025)EACH70$19.80$19.00
0040Type III moveable barricade (6161030)EACH4$137.50$133.00
0050Flashing arrow panel (6161040)EACH2$817.50$400.00
0060Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A)EACH4$1,907.50$1,860.00
0070Mobilization (6181000)LS1$8,000.00$102,213
00806 in. white high build waterborne pavement marking paint, type L beads (6205902A)LF4,663$0.66$0.65
00906 in. yellow high build waterborne pavement marking paint, type L beads (6205903A)LF2,808$0.66$0.65
010012 in. white high build waterborne pavement marking paint, type L beads (6205906A)LF1,954$1.92$1.85
0105Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY9,395$8.51$10.00
MoDOT contract 250314-C14: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of March 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy