MoDOT contract 250919-F04 bid tabulation
JSL0246-ROUTE 67-ST CHARLES COUNTY. Let by Missouri DOT on September 19, 2025, St Charles, St. Louis. 2 bids received; low bid $590,368 by KCI Construction Company.
- Owner
- Missouri DOT
- Letting
- 19 SEP 2025
- Pay items
- 15
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | KCI Construction Company | $590,368 | Low |
| 2 | CSD Environmental Services, Inc. | $2,378,200 | +303% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. KCI Construction Company | 2. CSD Environmental Services, Inc. |
|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 18 | $11,575 | $89,330 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $3,500.00 | $3,429.00 |
| 0030 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $2,500.00 | $6,500.00 |
| 0040 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $40,000 | $96,500 |
| 0050 | Mobilization (6181000) | LS | 1 | $40,212 | $120,239 |
| 0060 | Contractor furnished surveying and staking (6274000) | LS | 1 | $15,000 | $19,250 |
| 0070 | Mulching (8025006) | ACRE | 18 | $2,000.00 | $4,250.00 |
| 0080 | Rock ditch check (8061005) | LF | 300 | $20.00 | $45.00 |
| 0090 | Sediment removal (8061016) | CY | 183 | $15.00 | $102.00 |
| 0100 | Temporary seeding (8061017) | ACRE | 18 | $880.00 | $2,250.00 |
| 0110 | Silt fence (8061019) | LF | 19,853 | $2.70 | $8.00 |
| 0120 | Misc.modified shaping slopes class III (2159910) | 100F | 3 | $1,200.00 | $5,297.00 |
| 0130 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 4,038 | $36.00 | $44.40 |
| 0140 | MGS end anchor (6061080) | EACH | 2 | $1,800.00 | $6,257.00 |
| 0150 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 3 | $3,850.00 | $720.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.