MoDOT contract 251017-C04 bid tabulation

JKU0042 - ROUTE 78 - JACKSON COUNTY. Let by Missouri DOT on October 17, 2025, Jackson, Kansas City. 4 bids received; low bid $6,418,895 by Ideker, Inc..

Owner
Missouri DOT
Letting
17 OCT 2025
Pay items
59
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ideker, Inc.$6,418,895Low
2Superior Bowen Asphalt Company, LLC$6,767,390+5.0%
3J. M. Fahey Construction Co.$7,868,428+23%
4Emery Sapp & Sons, Inc.$8,184,940+28%
MoDOT contract 251017-C04: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ideker, Inc.2. Superior Bowen Asphalt Company, LLC3. J. M. Fahey Construction Co.4. Emery Sapp & Sons, Inc.
0020Removal of improvements (2022010)LS1$544,225$544,225$366,075$400,000
0030Class 3 excavation (2063000)CY5$50.00$50.00$375.00$31.00
0040Class 3 excavation in rock (2063100)CY5$130.00$130.00$588.00$380.00
0050Culvert cleanout (2063500)EACH28$1,644.40$704.40$608.50$350.00
0060Misc.modified linear grading class 2 (2079909)STA7.10$1,005.00$1,005.00$1,032.50$3,200.00
0070Type 5 aggregate for base (6 in. thick) (3040506)SY207$37.55$37.55$38.25$26.00
0080Bituminous pavement mixture PG64-22, (BP-2) (4011211)TON515$109.81$110.00$111.00$160.00
0090Asphaltic concrete mixture PG 70-22 (SP095C mix) (4030003)TON36,765.90$75.27$92.80$112.00$112.00
0105Tack coat - non-tracking (4071007)GAL23,071$4.20$4.25$3.75$4.50
0110Misc.curb inlet top replacement (6049902)EACH10$4,463.65$4,463.65$3,356.00$5,400.00
0120Misc.sanitary manhole adjustment (6049902)EACH12$3,250.00$1,210.92$1,821.00$900.00
0130Pipe aggregate pavement edge drain (6053030A)LF441$41.90$41.90$55.00$30.00
01404 in. concrete median strip (6083004)SY10,564.30$44.60$44.60$55.00$54.00
01506 in. concrete median strip (6083006)SY760.40$60.90$60.90$75.00$74.00
0160Paved approach, 8 in. (6085008)SY216.80$114.10$114.10$190.00$138.00
0170Concrete curb (6 in. height and under) type S (6091010)LF15,000$22.40$22.40$36.50$27.00
0180Concrete gutter type A (6091041)LF16$82.70$82.70$120.00$100.00
0190Curb and gutter type A (6091051)LF622$30.65$30.65$50.00$37.00
0200Truck mounted attenuator (TMA) (6123001)LS2$2,500.00$5,100.00$5,280.00$15,000
0220Furnishing and placing concrete material for full depth pavement repair (6131010)SY2,674$181.75$181.75$210.00$220.00
0230Subgrade compaction (6 in. depth) (pavement repair) (6131012)SY267$1.00$1.00$10.50$1.00
0240Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013)SY267$1.00$1.00$21.00$1.00
0250Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014)LF12,033$1.45$1.45$5.00$1.50
0260Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015)EACH10,028$4.45$4.45$10.00$5.30
0290Manhole frame and cover, type 3 (6143013)EACH1$590.00$590.00$1,143.00$1,500.00
0300Construction signs (6161005)SF720$6.50$6.50$7.00$8.00
0310Channelizer (trim-line) (6161025)EACH300$18.00$22.00$24.00$22.00
0320Type 3 moveable barricade (6161030)EACH10$145.00$190.00$210.00$175.00
0330Flashing arrow panel (6161040)EACH2$2,450.00$2,000.00$2,200.00$3,000.00
0340Mobilization (6181000)LS1$472,739$500,000$350,000$571,500
0350Preformed thermoplastic pavement marking, 6 in. white (6200009)LF1,585$5.50$4.50$5.00$7.00
0360Preformed thermoplastic pavement marking, 24 in. white (6200015)LF630$20.00$20.00$22.00$25.00
0370Preformed thermoplastic pavement marking, left/right arrow (6200021)EACH97$225.00$190.00$210.00$270.00
03806 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B)LF100,054$0.28$0.27$0.30$0.34
03906 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B)LF79,588$0.28$0.30$0.35$0.34
0400Pavement marking removal (symbols) (6207002)EACH4$95.00$85.00$94.00$115.00
0410Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY232,435$2.76$1.60$2.25$3.15
0420Modified coldmilling (depth transitions) (6224010)SY444$39.08$19.10$12.75$15.00
0430Precast concrete drop inlet 5 FT X 3 FT (7311053)FT4$1,565.00$1,565.00$2,063.00$1,700.00
0440Mulching (8025006)ACRE0.20$7,500.00$7,500.00$12,723$8,500.00
0450Topsoil (8041000)CY163$60.50$60.50$113.00$300.00
0460Seeding - cool season grasses (8051000A)ACRE0.20$7,500.00$7,500.00$12,440$9,000.00
0470Curb inlet check (8061007A)EACH2$130.00$200.00$200.00$240.00
0480Temporary seeding (8061017)ACRE0.20$5,000.00$5,000.00$10,500$6,000.00
0490MGS guardrail (6061060)LF713$22.00$22.00$31.00$26.00
0500MGS end anchor (6061080)EACH2$1,071.00$1,071.00$1,660.00$1,200.00
0515Type A crashworthy end terminal (MASH) (6063014)EACH2$2,650.00$2,650.00$3,651.00$3,100.00
0517Changeable message sign with communication interface, contractor furnished retained (6161099)EACH2$4,250.00$5,800.00$6,400.00$5,000.00
0520Base, concrete (9029100)CY0.50$6,428.00$6,428.00$7,715.00$8,300.00
0530Misc.traffic signal adjustment (9029901)LS1$4,544.00$4,544.00$3,680.00$4,000.00
0540Misc.pull box adjustment (9029902)EACH2$11,864$11,864$10,696$10,000
0550Concrete footings, embedded (9031010)CY1.50$714.00$714.00$1,383.00$800.00
0560Pipe posts (9031220)LB210$6.00$6.00$8.80$8.00
0570Breakaway assembly (perforated square steel tube) (9031241)EACH5$179.00$179.00$498.00$215.00
05802 in. PSST post - 12 GA. (9031270A)LF49$17.00$17.00$24.25$20.00
0590Concrete post anchor for 2 in. PSST. - 7 GA. (9031274)EACH5$244.00$244.00$221.25$290.00
06002.5 in. PSST post - 12 GA. (9031280)LF55$18.00$18.00$25.50$20.00
0610Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285)EACH5$273.00$273.00$232.25$325.00
0620SH-flat sheet (9035004A)SF195$21.00$21.00$23.25$25.00
MoDOT contract 251017-C04: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of October 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy