MoDOT contract 260220-C04 bid tabulation
JKR0139 - VARIOUS ROUTES - VARIOUS COUNTIES. Let by Missouri DOT on February 20, 2026, Johnson, Kansas City. 8 bids received; low bid $760,760 by International Rigging Group, LLC.
- Owner
- Missouri DOT
- Letting
- 20 FEB 2026
- Pay items
- 22
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | International Rigging Group, LLC | $760,760 | Low |
| 2 | Omega Coatings & Construction, LLC | $889,992 | +17% |
| 3 | American Industrial Coatings Inc. | $1,045,465 | +37% |
| 4 | Kalymnos Bridge Painting, LLC | $1,284,589 | +69% |
| 5 | Thomas Industrial Coatings, Inc. | $1,559,800 | +105% |
| 6 | Envirologics, Inc. dba Blast It Clean | $1,777,340 | +134% |
| 7 | Euro Paint, LLC | $1,934,676 | +154% |
| 8 | Southern Road & Bridge, LLC | $2,242,185 | +195% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. International Rigging Group, LLC | 2. Omega Coatings & Construction, LLC | 3. American Industrial Coatings Inc. | 4. Kalymnos Bridge Painting, LLC | 5. Thomas Industrial Coatings, Inc. | 6. Envirologics, Inc. dba Blast It Clean |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Construction signs (6161005) | SF | 494 | $10.00 | $7.25 | $10.00 | $10.05 | $9.00 | $10.00 |
| 0020 | Channelizer (cone) (6161022) | EACH | 75 | $40.00 | $18.00 | $75.00 | $25.92 | $15.00 | $13.33 |
| 0030 | Flashing arrow panel (6161040) | EACH | 1 | $3,500.00 | $1,050.00 | $2,000.00 | $2,680.00 | $1,000.00 | $2,000.00 |
| 0035 | Mobilization (6181000) | LS | 1 | $10,000 | $75,000 | $50,000 | $70,000 | $150,339 | $12,000 |
| 0040 | Surface preparation for recoating structural steel (7125200) | SF | 10,500 | $5.00 | $7.10 | $9.00 | $8.00 | $18.00 | $15.00 |
| 0050 | Field application of inorganic zinc primer (7125210) | SF | 10,500 | $3.70 | $3.25 | $4.00 | $5.00 | $3.15 | $7.00 |
| 0060 | Finished field coat (system L) (7125397) | SF | 10,500 | $3.50 | $3.00 | $3.00 | $5.00 | $2.00 | $7.00 |
| 0070 | Surface preparation for recoating structural steel (7125200) | SF | 3,600 | $5.00 | $7.10 | $9.00 | $12.00 | $18.00 | $15.00 |
| 0080 | Field application of inorganic zinc primer (7125210) | SF | 3,600 | $3.70 | $3.25 | $4.00 | $8.00 | $3.15 | $7.00 |
| 0090 | Finished field coat (system L) (7125397) | SF | 3,600 | $3.50 | $3.00 | $3.00 | $8.00 | $2.00 | $7.00 |
| 0100 | Surface preparation for recoating structural steel (7125200) | SF | 19,000 | $5.00 | $7.10 | $9.00 | $8.00 | $18.00 | $15.00 |
| 0110 | Field application of inorganic zinc primer (7125210) | SF | 19,000 | $3.70 | $3.25 | $4.00 | $5.00 | $3.15 | $7.00 |
| 0120 | Finished field coat (system L) (7125397) | SF | 19,000 | $3.50 | $3.00 | $3.70 | $5.00 | $2.00 | $7.00 |
| 0130 | Surface preparation for recoating structural steel (7125200) | SF | 8,800 | $5.00 | $7.10 | $9.00 | $10.00 | $18.00 | $15.00 |
| 0140 | Field application of inorganic zinc primer (7125210) | SF | 8,800 | $3.70 | $3.25 | $4.00 | $6.00 | $3.15 | $7.00 |
| 0150 | Finished field coat (system L) (7125397) | SF | 8,800 | $3.50 | $3.00 | $3.00 | $6.00 | $2.00 | $7.00 |
| 0160 | Surface preparation for recoating structural steel (7125200) | SF | 14,400 | $5.00 | $7.10 | $9.00 | $8.00 | $18.00 | $15.00 |
| 0170 | Field application of inorganic zinc primer (7125210) | SF | 14,400 | $3.70 | $3.25 | $4.00 | $5.00 | $3.15 | $7.00 |
| 0180 | Finished field coat (system L) (7125397) | SF | 14,400 | $3.50 | $3.00 | $3.00 | $5.00 | $2.00 | $7.00 |
| 0190 | Surface preparation for recoating structural steel (7125200) | SF | 4,300 | $5.00 | $7.10 | $9.00 | $12.00 | $18.00 | $15.00 |
| 0200 | Field application of inorganic zinc primer (7125210) | SF | 4,300 | $3.70 | $3.25 | $4.00 | $8.00 | $3.15 | $7.00 |
| 0210 | Finished field coat (system L) (7125397) | SF | 4,300 | $3.50 | $3.00 | $3.00 | $8.00 | $2.00 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of February 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.