International Rigging Group, LLC: MoDOT bid record

International Rigging Group, LLC submitted 10 bids on Missouri DOT contracts in the data, from 22 JAN 2021 to 16 OCT 2026, and was the low bidder on 6 of them (60%). When it was not low, its total sat a median +27% above the low bid.

Owner
Missouri DOT
Low bid volume
$4,415,386
Latest bid
16 OCT 2026
Data through
16 OCT 2026
10Bids
6Low bids
60Win rate, percent
+27%Median gap to the low bid when not low, 4 bids

By year

YearBidsLow bidsWin rate
2021100%
2022100%
2023100%
20242150%
202511100%
202644100%
International Rigging Group, LLC, MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Central3267%
Northeast200%
Kansas City22100%
Southeast22100%
Northwest100%
International Rigging Group, LLC, MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Surface preparation for recoating structural steel7125200SF5531 (56%)$6.00$20.13
Field application of inorganic zinc primer7125210SF4015 (38%)$2.00$4.00
Field application of organic zinc primer7125209SF137 (54%)$2.00$5.00
Finish field coat (system H)7125390ASF75 (71%)$2.00$2.00
Flashing arrow panel6161040EACH104 (40%)$1,350.00$1,000.00
Temporary long-term rumble strips6162002EACH84 (50%)$650.00$1,100.00
Type III moveable barricade6161030EACH54 (80%)$100.00$156.69
Finish field coat (system G)7125370ASF293 (10%)$2.00$2.50
Channelizer (trim line)6161025EACH83 (38%)$16.00$18.00
Intermediate field coat (system H)7125385ASF73 (43%)$3.00$2.25
Construction signs6161005SF122 (17%)$8.00$7.00
Finished field coat (system L)7125397SF211 (5%)$2.36$5.00
International Rigging Group, LLC, MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Thomas Industrial Coatings, Inc.101 of 10
Omega Coatings & Construction, LLC93 of 9
Olympus Painting Contractors, Inc.60 of 6
Steel City Contractors, LLC51 of 5
Southern Road & Bridge, LLC50 of 5
Kalymnos Bridge Painting, LLC30 of 3
Euro Paint, LLC30 of 3
Elite Industrial Painting, Inc.20 of 2
Abhe & Svoboda, Inc.20 of 2
Seminole Equipment, Inc.10 of 1
International Rigging Group, LLC, MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 OCT 2026261016-H02SoutheastJSE0094 - VARIOUS ROUTES - STE GENEVIEVE COUNTY1 of 9$852,987Low, 1.0% under the second
16 OCT 2026261016-H03SoutheastJSE0095 - ROUTE CRD, T, BU 60, DD - BUTLER, DUNKLIN1 of 8$721,623Low, 30% under the second
20 FEB 2026260220-C04Kansas CityJKR0139 - VARIOUS ROUTES - VARIOUS COUNTIES1 of 8$760,760Low, 17% under the second
16 JAN 2026260116-D03CentralJCD0021, JCD0335 - ROUTES 63, 179, U, 54 - BOONE, MONITEAU, COLE COUNTIES1 of 8$748,900Low, 11% under the second
12 DEC 2025251212-C04Kansas CityJKU0012 - STADIUM DRIVE- JACKSON COUNTY1 of 6$674,930Low, 39% under the second
15 MAR 2024240315-B02NortheastJ2P3406 - HIGHWAY 54, 61 - AUDRAIN, RALLS3 of 3$861,851+100%
19 JAN 2024240119-D01CentralJ5P3270B, J5P3460B - US 54 - CAMDEN COUNTY1 of 5$656,186Low, 16% under the second
15 DEC 2023231215-D04CentralJ5S3440B, JCD0012 - ROUTES DD,K - MORGAN, COOPER COUNTIES2 of 8$1,889,702+7.0%
15 APR 2022220415-B03NortheastJ2P3260, J2P3360, J2S3344 - VARIOUS ROUTES - VARIOUS COUNTIES3 of 5$1,242,404+47%
22 JAN 2021210122-A01NorthwestJ1I3020B,J1I3099B,J1P3023B,J1S3181 - VARIOUS ROUTES - VARIOU2 of 7$1,724,506+2.0%
International Rigging Group, LLC: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy