Olympus Painting Contractors, Inc.: MoDOT bid record

Olympus Painting Contractors, Inc. submitted 19 bids on Missouri DOT contracts in the data, from 18 DEC 2020 to 16 OCT 2026, and was the low bidder on 2 of them (11%). When it was not low, its total sat a median +65% above the low bid.

Owner
Missouri DOT
Low bid volume
$3,322,502
Latest bid
16 OCT 2026
Data through
16 OCT 2026
19Bids
2Low bids
11Win rate, percent
+65%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
2020100%
20227114%
20233133%
2024200%
2025200%
2026400%
Olympus Painting Contractors, Inc., MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Central6117%
Northeast4125%
Southwest300%
Southeast300%
St. Louis200%
Kansas City100%
Olympus Painting Contractors, Inc., MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Advanced warning rail system6161008EACH145 (36%)$81.00$51.40
Channelizer (trim line)6161025EACH164 (25%)$22.09$18.00
Truck or trailer mounted attenuator (TMA)6123000AEACH94 (44%)$6,000.00$1,000.00
Temporary removable marking tape 4 in., white6205301BLF54 (80%)$1.70$2.00
Field application of inorganic zinc primer7125210SF313 (10%)$4.00$4.00
Field application of organic zinc primer7125209SF213 (14%)$3.00$5.00
Construction signs6161005SF192 (11%)$12.00$7.00
Flashing arrow panel6161040EACH142 (14%)$1,220.00$1,000.00
Directional indicator barricade6161033EACH92 (22%)$90.00$72.00
Surface preparation for recoating structural steel7125200SF521 (2%)$14.00$20.13
Pavement marking removal6207001LF91 (11%)$1.20$1.04
Type III moveable barricade6161030EACH71 (14%)$162.00$156.69
Olympus Painting Contractors, Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Thomas Industrial Coatings, Inc.93 of 9
Southern Road & Bridge, LLC72 of 7
Omega Coatings & Construction, LLC76 of 7
Steel City Contractors, LLC63 of 6
International Rigging Group, LLC66 of 6
Phillips Hardy, Inc.44 of 4
Comanche Construction, Inc.33 of 3
Lehman Construction, LLC31 of 3
PCiRoads, LLC33 of 3
Kalymnos Bridge Painting, LLC33 of 3
Olympus Painting Contractors, Inc., MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 OCT 2026261016-D07CentralJCD0230, JCD0260-VARIOUS ROUTES-VARIOUS COUNTIES5 of 7$2,087,209+86%
16 OCT 2026261016-H02SoutheastJSE0094 - VARIOUS ROUTES - STE GENEVIEVE COUNTY5 of 9$1,765,511+107%
16 OCT 2026261016-H03SoutheastJSE0095 - ROUTE CRD, T, BU 60, DD - BUTLER, DUNKLIN4 of 8$1,525,806+111%
16 JAN 2026260116-D03CentralJCD0021, JCD0335 - ROUTES 63, 179, U, 54 - BOONE, MONITEAU, COLE COUNTIES5 of 8$1,745,180+133%
12 DEC 2025251212-C04Kansas CityJKU0012 - STADIUM DRIVE- JACKSON COUNTY3 of 6$1,113,656+65%
14 NOV 2025251114-F07St. LouisJSLM0087 - ROUTE D - FRANKLIN COUNTY4 of 4$625,778+51%
15 NOV 2024241115-F02St. LouisJ6I3571-I-70-ST LOUIS COUNTY2 of 3$7,862,650+3.0%
16 FEB 2024240216-G10SouthwestJSR0045 - ROUTE I-49, 66 - JASPER, NEWTON COUNTIES3 of 3$1,647,430+58%
15 DEC 2023231215-D04CentralJ5S3440B, JCD0012 - ROUTES DD,K - MORGAN, COOPER COUNTIES5 of 8$2,544,959+45%
20 OCT 2023231020-B06NortheastJNE0022 - ROUTE 19 - MONTGOMERY COUNTY2 of 4$2,032,399+20%
20 JAN 2023230120-D01CentralJ5I3483 - ROUTE I-44 - LACLEDE, PULASKI COUNTY1 of 3$2,503,703Low, 45% under the second
18 NOV 2022221118-D09CentralJCD0039 - ROUTE 50 - COLE COUNTY3 of 4$794,160+25%
20 MAY 2022220520-B01NortheastJ2I3366 - ROUTE I-72 - MARION COUNTY1 of 2$818,799Low, 3.0% under the second
20 MAY 2022220520-B03NortheastJ2M0279 - ROUTE C - RANDOLPH COUNTY5 of 5$416,042+118%
20 MAY 2022220520-D01CentralJ5P3596 - ROUTE 17 - PULASKI5 of 5$395,532+64%
20 MAY 2022220520-G10SouthwestJ7P3532B - ROUTE I-44 - JASPER COUNTY4 of 4$526,460+94%
20 MAY 2022220520-H05SoutheastJ9P3585 - ROUTE 51 - PERRY COUNTY2 of 2$9,141,689+168%
15 APR 2022220415-B03NortheastJ2P3260, J2P3360, J2S3344 - VARIOUS ROUTES - VARIOUS COUNTIES4 of 5$1,446,221+71%
18 DEC 2020201218-G01SouthwestJ7P3105D,J7P3190L - ROUTE 65 - TANEY COUNTY7 of 7$2,050,682+25%
Olympus Painting Contractors, Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.