Comanche Construction, Inc.: MoDOT bid record
Comanche Construction, Inc. submitted 44 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 18 SEP 2026, and was the low bidder on 12 of them (27%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $32,042,464
- Latest bid
- 18 SEP 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 10 | 4 | 40% |
| 2021 | 6 | 1 | 17% |
| 2022 | 9 | 3 | 33% |
| 2023 | 4 | 1 | 25% |
| 2024 | 5 | 1 | 20% |
| 2025 | 5 | 0 | 0% |
| 2026 | 5 | 2 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Kansas City | 17 | 8 | 47% |
| Northwest | 13 | 3 | 23% |
| Southwest | 9 | 1 | 11% |
| Central | 4 | 0 | 0% |
| Northeast | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 6161005 | SF | 37 | 14 (38%) | $6.95 | $7.00 |
| Removal of concrete wearing surface | 2161502 | SF | 15 | 13 (87%) | $2.70 | $3.20 |
| Removal of existing expansion joint seal sealant or | 2165000 | LF | 16 | 12 (75%) | $46.52 | $46.52 |
| Pavement marking removal | 6207001 | LF | 27 | 11 (41%) | $0.58 | $1.04 |
| Flashing arrow panel | 6161040 | EACH | 29 | 10 (34%) | $955.75 | $1,000.00 |
| Half-sole repair | 7040104 | SF | 22 | 9 (41%) | $50.00 | $108.00 |
| MGS guardrail | 6061060 | LF | 17 | 9 (53%) | $23.74 | $30.00 |
| Curb blockout | 7034600 | LF | 14 | 9 (64%) | $116.44 | $129.57 |
| Removal of existing expansion joint & adjacent concrete | 2164500 | LF | 36 | 8 (22%) | $387.29 | $390.00 |
| Reinforcing steel (epoxy coated) | 7101000 | LB | 32 | 8 (25%) | $3.40 | $3.00 |
| Strip seal expansion joint system | 7172001 | LF | 18 | 8 (44%) | $507.92 | $530.00 |
| Relocating temporary traffic barrier | 6175010A | LF | 16 | 8 (50%) | $10.95 | $12.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Phillips Hardy, Inc. | 15 | 5 of 15 |
| Capital Paving & Construction, LLC | 14 | 11 of 14 |
| PCiRoads, LLC | 13 | 10 of 13 |
| Concrete Strategies, LLC | 10 | 2 of 10 |
| Emery Sapp & Sons, Inc. | 9 | 6 of 9 |
| E & C Bridge, LLC | 7 | 7 of 7 |
| Louis-Company, LLC | 7 | 5 of 7 |
| Lehman Construction, LLC | 5 | 1 of 5 |
| Southern Road & Bridge, LLC | 3 | 1 of 3 |
| Olympus Painting Contractors, Inc. | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 260918-C02 | Kansas City | JKU0321-VARIOUS ROUTES-JACKSON, CLAY COUNTIES | 7 of 7 | $1,103,525 | +67% |
| 18 JUN 2026 | 260618-C02 | Kansas City | JKU0140 - ROUTE 150 - JACKSON COUNTY | 3 of 4 | $5,167,848 | +23% |
| 17 APR 2026 | 260417-C01 | Kansas City | J4P3093-VARIOUS ROUTES-JACKSON, CLAY, PLATTE COUNTIES | 1 of 4 | $3,232,644 | Low, 6.0% under the second |
| 17 APR 2026 | 260417-C06 | Kansas City | JKU0125 - ROUTE 291 - CLAY COUNTY | 1 of 3 | $1,997,220 | Low, 33% under the second |
| 20 MAR 2026 | 260320-C05 | Kansas City | JKU0038 - ROUTE 24 - JACKSON COUNTY | 2 of 2 | $3,566,333 | +2.0% |
| 12 DEC 2025 | 251212-A02 | Northwest | JNW0014 - ROUTE E, FF, JJ, OO - MERCER, PUTNAM AND SULLIVAN COUNTIES | 2 of 2 | $3,417,543 | +20% |
| 12 DEC 2025 | 251212-C06 | Kansas City | JKU0095 - ROUTE I-635 - PLATTE COUNTY | 2 of 3 | $2,269,807 | +14% |
| 17 OCT 2025 | 251017-C09 | Kansas City | JKU0451, JKU0453-ROUTE I-435-JACKSON COUNTY | 2 of 2 | $519,887 | +22% |
| 15 AUG 2025 | 250815-A01 | Northwest | 4 Bridge deck replacements | 7 of 7 | $4,759,457 | +91% |
| 15 AUG 2025 | 250815-G03 | Southwest | 2 Bridge rehabilitations | 5 of 6 | $5,294,080 | +66% |
| 13 DEC 2024 | 241213-A01 | Northwest | J1I3262, J1I3280 - ROUTE I-29 - ANDREW, ATCHISON COUNTIES | 3 of 4 | $5,369,970 | +12% |
| 18 OCT 2024 | 241018-C13 | Kansas City | JKU0410-VARIOUS ROUTES-JACKSON, CASS COUNTIES | 2 of 2 | $2,793,382 | +34% |
| 20 SEP 2024 | 240920-C07 | Kansas City | JKU0165 - VARIOUS ROUTES - PLATTE, CLAY COUNTY | 3 of 4 | $749,813 | +38% |
| 16 FEB 2024 | 240216-C01 | Kansas City | J4P3468C - ROUTE 435 - JACKSON COUNTY | 1 of 1 | $1,806,846 | Low |
| 19 JAN 2024 | 240119-G09 | Southwest | J8S3240 - ROUTE 60 - GREENE COUNTY | 2 of 3 | $1,622,201 | +43% |
| 17 NOV 2023 | 231117-C01 | Kansas City | J4P3468B-ROUTE I-35-JACKSON COUNTY | 2 of 2 | $616,974 | +39% |
| 28 APR 2023 | 230428-A04 | Northwest | JNW0121 - ROUTE I-29 - HOLT COUNTY | 5 of 6 | $427,947 | +43% |
| 17 FEB 2023 | 230217-A06 | Northwest | JNW0098 - ROUTE 36 - DEKLAB COUNTY | 2 of 2 | $280,829 | +51% |
| 17 FEB 2023 | 230217-C06 | Kansas City | J4S3383B - ROUTES VARIOUS - JACKSON, CASS COUNTIES | 1 of 1 | $3,019,940 | Low |
| 16 DEC 2022 | 221216-A01 | Northwest | J1I3386 - ROUTE 229 - BUCHANAN | 1 of 4 | $3,960,454 | Low, 1.0% under the second |
| 16 DEC 2022 | 221216-C03 | Kansas City | J4I3486 - ROUTE I-670 - JACKSON COUNTY | 1 of 1 | $1,831,614 | Low |
| 18 NOV 2022 | 221118-D05 | Central | J5S3457 - Route D, Truman Boulevard - Cole County | 3 of 3 | $1,013,604 | +52% |
| 21 OCT 2022 | 221021-A05 | Northwest | J1P3446 - ROUTE 13 - CALDWELL COUNTY | 7 of 7 | $2,801,376 | +37% |
| 17 JUN 2022 | 220617-C03 | Kansas City | JKU0225 - ROUTE 169 - CLAY COUNTY | 2 of 3 | $625,772 | +60% |
| 20 MAY 2022 | 220520-B03 | Northeast | J2M0279 - ROUTE C - RANDOLPH COUNTY | 3 of 5 | $245,990 | +29% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.