Capital Paving & Construction, LLC: MoDOT bid record
Capital Paving & Construction, LLC submitted 388 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 108 of them (28%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $398,713,768
- Latest bid
- 16 OCT 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 61 | 19 | 31% |
| 2021 | 61 | 14 | 23% |
| 2022 | 44 | 11 | 25% |
| 2023 | 64 | 16 | 25% |
| 2024 | 84 | 31 | 37% |
| 2025 | 42 | 7 | 17% |
| 2026 | 32 | 10 | 31% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Central | 129 | 47 | 36% |
| Southwest | 89 | 20 | 22% |
| Northwest | 52 | 16 | 31% |
| Northeast | 50 | 10 | 20% |
| Kansas City | 43 | 14 | 33% |
| Southeast | 22 | 1 | 5% |
| St. Louis | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 6161005 | SF | 468 | 234 (50%) | $6.50 | $7.00 |
| Tack coat | 4071005 | GAL | 395 | 190 (48%) | $2.69 | $2.90 |
| Channelizer (trim line) | 6161025 | EACH | 344 | 185 (54%) | $18.00 | $18.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 308 | 180 (58%) | $0.15 | $0.20 |
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 260 | 142 (55%) | $3,191.28 | $3,300.00 |
| 4 in. yellow standard waterborne pavement marking paint, type P beads | 6206001C | LF | 234 | 138 (59%) | $0.15 | $0.25 |
| Bituminous shoulder rumble strip | 6261000A | STA | 145 | 116 (80%) | $11.00 | $20.00 |
| MGS guardrail | 6061060 | LF | 213 | 115 (54%) | $28.34 | $30.00 |
| Advanced warning rail system | 6161008 | EACH | 247 | 111 (45%) | $53.89 | $51.40 |
| Gravel (A) or crushed stone (B) | 3105002 | TON | 303 | 106 (35%) | $62.25 | $55.00 |
| Preformed thermoplastic pavement marking, 24 in. white | 6200015 | LF | 179 | 106 (59%) | $23.00 | $23.50 |
| Shaping slopes, class III | 2153000 | 100F | 183 | 104 (57%) | $1,200.00 | $1,200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emery Sapp & Sons, Inc. | 234 | 116 of 234 |
| Magruder Paving, LLC | 67 | 41 of 67 |
| Phillips Hardy, Inc. | 58 | 29 of 58 |
| APAC-Central, Inc. | 51 | 34 of 51 |
| Pace Construction Company, LLC | 45 | 36 of 45 |
| Lehman Construction, LLC | 32 | 19 of 32 |
| Gene Haile Excavating, Inc. | 29 | 22 of 29 |
| Christensen Construction Co. | 28 | 15 of 28 |
| Concrete Strategies, LLC | 25 | 9 of 25 |
| Radmacher Brothers Excavating Co., Inc. | 25 | 12 of 25 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2026 | 261016-B03 | Northeast | JNE0107 - ROUTE 154 - RALLS, PIKE COUNTIES | 4 of 4 | $1,993,153 | +70% |
| 16 OCT 2026 | 261016-B04 | Northeast | JNE0235 - ROUTE 61 - LINCOLN COUNTY | 4 of 5 | $12,143,097 | +35% |
| 16 OCT 2026 | 261016-D01 | Central | JCD0088-ROUTE 63-PHELPS, TEXAS COUNTIES | 3 of 5 | $11,436,666 | +20% |
| 16 OCT 2026 | 261016-D02 | Central | JCD0188-ROUTE W-HOWARD COUNTY | 1 of 2 | $730,052 | Low, 9.0% under the second |
| 16 OCT 2026 | 261016-D03 | Central | JCD0189 - ROUTE M - COOPER COUNTY | 1 of 2 | $905,653 | Low, 12% under the second |
| 16 OCT 2026 | 261016-D04 | Central | JCD0199 - ROUTE 5 - HOWARD COUNTY | 1 of 2 | $327,331 | Low, 25% under the second |
| 16 OCT 2026 | 261016-D08 | Central | JCD0255-ROUTES CC, J, C, P-CRAWFORD, DENT, TEXAS, PULASKI COUNTIES | 2 of 3 | $4,007,357 | +12% |
| 16 OCT 2026 | 261016-D12 | Central | JCD0303 - ROUTE P, JJ - DENT, CRAWFORD COUNTIES | 3 of 3 | $746,890 | +8.0% |
| 16 OCT 2026 | 261016-D13 | Central | JCD0329-ROUTE 87-COOPER, MONITEAU COUNTY | 2 of 3 | $3,437,026 | +6.0% |
| 16 OCT 2026 | 261016-D14 | Central | JST0017C - ROUTE B - COOPER COUNTY | 1 of 6 | $1,351,479 | Low, 12% under the second |
| 16 OCT 2026 | 261016-G01 | Southwest | J7P3533B, J7P3533C, JSR0038, JSR0228 - ROUTES 248, 160, F - TANEY, STONE COUNTIES | 2 of 3 | $8,200,000 | +9.0% |
| 16 OCT 2026 | 261016-G07 | Southwest | JSR0138 - ROUTE N - POLK COUNTY | 9 of 9 | $1,503,235 | +34% |
| 16 OCT 2026 | 261016-G10 | Southwest | JSR0270, JSR0346-ROUTE 65-TANEY COUNTY | 3 of 3 | $11,717,388 | +14% |
| 18 SEP 2026 | 260918-A01 | Northwest | 19 BRIDGE REHABILITATIONS | 2 of 2 | $3,602,917 | +46% |
| 18 SEP 2026 | 260918-B02 | Northeast | JNE0024, JNE0254 - ROUTE 11, 6 - ADAIR, KNOX, LINN, AND SULLIVAN COUNTIES | 5 of 5 | $6,208,866 | +44% |
| 18 SEP 2026 | 260918-D01 | Central | JCD0178 - ROUTES MM, TT, F, O - CAMDEN AND MORGAN COUNTIES | 3 of 3 | $4,235,557 | +3.0% |
| 18 SEP 2026 | 260918-D03 | Central | JCD0184 - VARIOUS ROUTES - COLE COUNTY | 1 of 1 | $1,128,062 | Low |
| 18 SEP 2026 | 260918-D04 | Central | JCD0185 - ROUTE A, Y - GASCONADE COUNTY | 1 of 3 | $2,593,302 | Low, 0.0% under the second |
| 18 SEP 2026 | 260918-D05 | Central | JCD0190 - ROUTE 163 - BOONE COUNTY | 2 of 2 | $919,106 | +6.0% |
| 18 SEP 2026 | 260918-D06 | Central | JCD0191, JCD0198 - ROUTE MM, DD - BOONE COUNTY | 2 of 2 | $1,542,622 | +4.0% |
| 18 SEP 2026 | 260918-D07 | Central | JCD0214 - ROUTE 50 - MONITEAU COUNTY | 2 of 5 | $1,052,656 | +24% |
| 18 SEP 2026 | 260918-G02 | Southwest | JSR0028, JSR0033, JSR0442, JSR0487 - VARIOUS ROUTES, VARIOUS COUNTIES | 4 of 4 | $9,802,494 | +31% |
| 18 JUN 2026 | 260618-A04 | Northwest | JNWM0131-VARIOUS ROUTES-VARIOUS COUNTIES | 3 of 3 | $7,533,089 | +20% |
| 18 JUN 2026 | 260618-D05 | Central | JCD0204 - ROUTE 63 - BOONE COUNTY | 1 of 4 | $1,510,984 | Low, 18% under the second |
| 15 MAY 2026 | 260515-D03 | Central | JCD0135-ROUTE 47-WASHINGTON COUNTY | 4 of 4 | $8,605,485 | +35% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.