MoDOT contract 261016-D14 bid tabulation

JST0017C - ROUTE B - COOPER COUNTY. Let by Missouri DOT on October 16, 2026, Cooper, Central. 6 bids received; low bid $1,351,479 by Capital Paving & Construction, LLC.

Owner
Missouri DOT
Letting
16 OCT 2026
Pay items
69
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Capital Paving & Construction, LLC$1,351,479Low
2Gene Haile Excavating, Inc.$1,518,104+12%
3Stockman Construction Corp.$1,671,274+24%
4Sam Gaines Construction, Inc.$1,922,508+42%
5Hardy Construction, LLC$2,020,692+50%
6Emery Sapp & Sons, Inc.$2,289,054+69%
MoDOT contract 261016-D14: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Capital Paving & Construction, LLC2. Gene Haile Excavating, Inc.3. Stockman Construction Corp.4. Sam Gaines Construction, Inc.5. Hardy Construction, LLC6. Emery Sapp & Sons, Inc.
0010Removal of improvements (2022010)LS1$63,672$80,000$150,000$100,000$110,000$120,000
0020Unclassified excavation (2035000)CY2,898$11.94$15.00$45.00$40.00$101.00$55.00
0030Compacting embankment (2036000)CY940$12.31$6.00$13.00$30.00$13.00$9.50
0040Compacting in cut (2037075)STA5$996.16$1,000.00$1,500.00$5,000.00$2,570.00$8,900.00
0050Class 3 excavation (2063000)CY165$29.21$40.00$30.00$45.00$45.50$40.00
0060Type 5 aggregate for base (4 in. thick) (3040504)SY2,434$13.07$11.00$10.25$15.00$17.00$17.00
0070Type 5 aggregate for base (6 in. thick) (3040506)SY4,808$13.59$12.50$13.25$19.00$26.00$27.00
0080Type A2 shoulder (4010150)SY316.30$76.22$75.00$136.00$90.00$153.00$172.00
0090Bituminous pavement mixture PG64-22, (BP-2) (4011211)TON990$180.00$205.00$151.00$147.55$180.00$180.00
0100Concrete pavement (9 1/2 in. non-reinforced, 15 FT. joints) (5021333)SY4,272$96.88$112.00$110.00$131.00$110.00$153.00
0110Misc.8 in. tinted concrete truck apron (5029905)SY394.80$108.70$175.00$130.00$145.00$120.00$180.00
0120Concrete curb ramp (6081010)SY108.40$232.88$115.00$115.00$75.00$168.00$265.00
0130Truncated domes (6081012)SF210$36.96$37.50$28.00$40.00$32.00$30.00
0140Paved approach, 8 in. (6085008)SY191.60$119.43$180.00$120.00$120.00$101.00$125.00
0150Concrete sidewalk, 4 in. (6086004)SY209.70$75.40$122.00$90.00$75.00$98.50$180.00
0160Misc.3 in. tinted concrete median strip (6089905)SY86.60$179.11$95.00$135.00$95.00$150.00$260.00
0170Misc.6 in. tinted concrete median strip (6089905)SY241.40$127.25$98.00$155.00$145.00$160.00$333.00
0180Concrete curb (over 6 in. height) type S (6091011)LF223$52.52$70.00$70.00$100.00$83.00$105.00
0190Integral curb (over 6 in. height) type A (6092021)LF795$28.47$25.00$45.00$45.00$30.00$7.00
0200Rock lining (6097000)CY4$157.70$250.00$370.00$175.00$160.00$225.00
0210Misc.apwa type CG-1 dry curb (6099903)LF220$72.36$50.00$70.00$85.00$81.00$110.00
0220Misc.apwa type CG-2 dry curb (6099903)LF375$63.22$55.00$70.00$75.00$69.00$105.00
0230Manhole frame and cover, type 3 (6143013)EACH1$538.20$500.00$450.00$1,500.00$600.00$750.00
0240Construction signs (6161005)SF447$8.00$9.00$7.70$7.50$7.50$9.50
0250Relocated signs (6161010)SF32$8.00$9.00$9.25$9.00$9.00$9.50
0260Channelizer (trim-line) (6161025)EACH75$31.00$35.00$16.45$16.00$16.00$36.00
0270Type 3 moveable barricade (6161030)EACH10$170.00$190.00$103.00$100.00$100.00$200.00
0280Changeable message sign with communication interface, contractor furnished retained (6161099)EACH2$5,000.00$5,250.00$7,712.00$7,500.00$7,500.00$6,000.00
0290Mobilization (6181000)LS1$81,135$116,665$102,000$150,000$208,000$250,000
0300Additional mobilization for seeding (6181020)EACH2$600.00$600.00$600.00$600.00$600.00$600.00
0310Preformed thermoplastic pavement marking, 6 in. white (6200009)LF180$7.00$8.00$10.30$10.00$10.00$8.00
0320Preformed thermoplastic pavement marking, 24 in. white (6200015)LF236$21.00$24.00$28.28$27.50$27.50$25.00
0330Preformed thermoplastic pavement marking, 24 in. yellow (6200018)LF147$21.00$24.00$18.00$17.50$17.50$25.00
0340Preformed thermoplastic pavement marking, left/right arrow (6200021)EACH2$250.00$275.00$411.00$400.00$400.00$290.00
0350Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A)EACH55$65.00$70.00$31.00$30.00$30.00$75.00
0360Preformed thermoplastic pavement marking, combination STR/LT/RT fish hook arrow (6200051)EACH4$300.00$350.00$1,285.00$1,250.00$1,250.00$350.00
0370Temporary removable marking tape, 24 in., white (6205309)LF128$3.00$4.00$28.30$27.50$27.50$3.50
03806 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B)LF1,345$0.85$1.00$1.40$1.35$1.35$1.00
03906 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B)LF486$0.85$1.00$1.40$1.35$1.35$1.00
04004 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF200$0.50$1.00$1.20$1.15$1.15$0.60
04104 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF1,491$0.50$1.00$1.20$1.15$1.15$0.60
0420Pavement marking removal (6207001)LF5,241$0.85$1.00$1.20$1.15$1.15$1.00
04304 in temporary pavement marking paint (6208076)LF15,831$0.50$1.00$1.20$1.15$1.15$0.60
0440Contractor furnished surveying and staking (6274000)LS1$7,500.00$17,500$21,000$60,000$15,000$45,000
045015 in. pipe group A (7261015)LF75$91.80$70.00$101.00$125.00$173.00$108.00
046018 in. pipe group A (7261018)LF286$103.34$80.00$115.00$175.00$130.00$132.00
0470Precast concrete drop inlet 5 FT X 3 FT (7311053)FT5$906.58$1,000.00$1,400.00$7,500.00$2,200.00$1,200.00
048015 in. or allowed substitute group A flared end section (7320615A)EACH2$1,528.86$500.00$1,560.00$1,800.00$1,650.00$1,700.00
049018 in. or allowed substitute group A flared end section (7320618A)EACH3$1,014.86$625.00$1,850.00$2,500.00$2,350.00$950.00
0500Mulching (8025006)ACRE0.70$500.00$500.00$515.00$3,000.00$700.00$580.00
0510Turf type tall fescue sodding (8031000A)SY3,965$11.25$12.30$11.60$15.00$12.00$13.00
0520Sediment trap excavation (8061003)CY10$50.00$50.00$90.00$100.00$37.50$75.00
0530Sediment trap rock (8061004)CY10$30.00$50.00$152.00$500.00$100.00$230.00
0540Alternate ditch check (8061006)LF168$3.00$3.50$3.10$32.00$4.00$3.50
0550Curb inlet check (8061007A)EACH6$50.00$55.00$156.00$100.00$64.00$60.00
0560Temporary seeding (8061017)ACRE0.70$500.00$550.00$515.00$5,000.00$650.00$580.00
0570Silt fence (8061019)LF281$3.00$3.50$4.00$4.00$4.00$3.50
0580Type 3B erosion control blanket (8064140)SY11$10.00$11.00$10.30$30.00$12.50$12.00
0590Conduit, 4 in. rigid, in trench (9013004)LF122$30.00$33.00$30.85$30.00$30.00$35.00
0600Pull box, preformed class 1 (9016110)EACH2$2,100.00$2,300.00$2,160.00$2,100.00$2,100.00$2,450.00
0610Misc.conduit, 1.5 in. rigid, in trench (9019903)LF617$20.00$22.00$20.60$20.00$20.00$24.00
0620Concrete footings, embedded (9031010)CY0.40$600.00$660.00$1,030.00$1,000.00$1,000.00$700.00
0630Pipe posts (9031220)LB190$12.00$13.50$15.40$15.00$15.00$14.00
0640Breakaway assembly (perforated square steel tube) (9031241)EACH18$220.00$240.00$360.00$350.00$350.00$255.00
06502.5 in. PSST post - 12 GA. (9031280)LF384$20.00$22.00$20.60$20.00$20.00$24.00
0660Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A)EACH16$125.00$140.00$257.00$250.00$250.00$145.00
0670Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285)EACH18$250.00$20.00$309.00$300.00$300.00$290.00
0680SH-flat sheet (9035004A)SF115$30.00$33.00$20.60$20.00$20.00$35.00
0690SHF-flat sheet fluorescent (9035069A)SF146$40.00$44.00$20.60$20.00$20.00$47.00
MoDOT contract 261016-D14: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of October 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy