Gene Haile Excavating, Inc.: MoDOT bid record
Gene Haile Excavating, Inc. submitted 71 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 24 of them (34%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $25,851,792
- Latest bid
- 16 OCT 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 10 | 3 | 30% |
| 2021 | 3 | 1 | 33% |
| 2022 | 12 | 4 | 33% |
| 2023 | 15 | 4 | 27% |
| 2024 | 14 | 7 | 50% |
| 2025 | 9 | 3 | 33% |
| 2026 | 8 | 2 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Central | 33 | 14 | 42% |
| Kansas City | 11 | 1 | 9% |
| Northeast | 9 | 3 | 33% |
| Southwest | 8 | 1 | 13% |
| Northwest | 6 | 3 | 50% |
| Southeast | 4 | 2 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Placing type 2 rock blanket | 6113040 | CY | 57 | 31 (54%) | $15.00 | $26.00 |
| Type D barrier | 7034219A | LF | 38 | 30 (79%) | $85.50 | $135.80 |
| Additional mobilization for seeding | 6181020 | EACH | 29 | 29 (100%) | $600.00 | $600.00 |
| Bridge approach slab (minor road) | 5031011A | SY | 50 | 22 (44%) | $126.00 | $195.00 |
| Permanent erosion control geotextile | 6240103A | SY | 61 | 21 (34%) | $3.00 | $4.00 |
| Pile point reinforcement | 7027000 | EACH | 35 | 18 (51%) | $120.00 | $155.00 |
| Class B concrete (substructure) | 7032003 | CY | 38 | 17 (45%) | $1,000.00 | $1,300.00 |
| Type H barrier | 7034216 | LF | 22 | 14 (64%) | $85.00 | $126.00 |
| Furnishing type 2 rock blanket | 6113020 | CY | 57 | 13 (23%) | $48.00 | $52.00 |
| Type 1 aggregate for base (4 in. thick) | 3040143 | SY | 55 | 11 (20%) | $13.50 | $14.00 |
| Compacting embankment | 2036000 | CY | 52 | 11 (21%) | $6.00 | $7.65 |
| Silt fence | 8061019 | LF | 77 | 10 (13%) | $3.50 | $3.45 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E & C Bridge, LLC | 35 | 20 of 35 |
| Mera Excavating, LLC | 30 | 8 of 30 |
| Don Schnieders Excavating Company, Inc. | 29 | 7 of 29 |
| Capital Paving & Construction, LLC | 29 | 7 of 29 |
| Emery Sapp & Sons, Inc. | 24 | 8 of 24 |
| Widel, Inc. | 20 | 12 of 20 |
| S & A Equipment & Builders, LLC | 18 | 4 of 18 |
| Phillips Hardy, Inc. | 16 | 3 of 16 |
| Lehman Construction, LLC | 13 | 4 of 13 |
| West Plains Bridge & Grading, LLC | 11 | 4 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2026 | 261016-A02 | Northwest | JNWM0144 - ROUTE 29 - ANDREW COUNTY | 2 of 3 | $364,050 | +84% |
| 16 OCT 2026 | 261016-D06 | Central | JCD0229, JCD0302 - ROUTES T, 87 - MONITEAU COUNTY | 1 of 5 | $435,919 | Low, 9.0% under the second |
| 16 OCT 2026 | 261016-D14 | Central | JST0017C - ROUTE B - COOPER COUNTY | 2 of 6 | $1,518,104 | +12% |
| 16 OCT 2026 | 261016-G07 | Southwest | JSR0138 - ROUTE N - POLK COUNTY | 2 of 9 | $1,144,737 | +2.0% |
| 18 SEP 2026 | 260918-D08 | Central | JCD0340 - ROUTE B - DENT COUNTY | 2 of 6 | $280,048 | +27% |
| 18 SEP 2026 | 260918-D11 | Central | JCD0219B-ROUTE 54 - COLE COUNTY | 3 of 6 | $408,478 | +14% |
| 16 JAN 2026 | 260116-C04 | Kansas City | JKU0144 - ROUTE D - CASS COUNTY | 9 of 10 | $3,547,814 | +37% |
| 16 JAN 2026 | 260116-D01 | Central | J5S3536, J5S3555-ROUTE CC, W-MORGAN, MONITEAU COUNTY | 1 of 5 | $1,243,686 | Low, 8.0% under the second |
| 12 DEC 2025 | 251212-D01 | Central | J5P3538 - ROUTE 7 - CAMDEN COUNTY | 4 of 5 | $1,625,015 | +48% |
| 12 DEC 2025 | 251212-D03 | Central | J5S3551 - ROUTE AA - COLE COUNTY | 4 of 6 | $1,171,818 | +55% |
| 12 DEC 2025 | 251212-D04 | Central | JCD0074 - ROUTE 179 - COLE COUNTY | 3 of 7 | $626,985 | +27% |
| 14 NOV 2025 | 251114-H09 | Southeast | JSEM0114 - ROUTE 95 - WRIGHT COUNTY | 2 of 6 | $482,668 | +39% |
| 19 SEP 2025 | 250919-H03 | Southeast | J9S3691-ROUTE AF-WRIGHT COUNTY | 1 of 8 | $1,925,438 | Low, 4.0% under the second |
| 15 AUG 2025 | 250815-A01 | Northwest | 4 Bridge deck replacements | 4 of 7 | $3,450,861 | +39% |
| 16 MAY 2025 | 250516-D03 | Central | 2 Bridge deck replacements | 5 of 7 | $2,979,204 | +37% |
| 21 FEB 2025 | 250221-B01 | Northeast | J2S2160 - ROUTE J - MACON COUNTY | 1 of 3 | $1,825,000 | Low, 9.0% under the second |
| 21 FEB 2025 | 250221-B03 | Northeast | JNE0053, JNE0154 - ROUTE K - MONTGOMERY | 1 of 10 | $3,932,449 | Low, 12% under the second |
| 13 DEC 2024 | 241213-D02 | Central | JCD0113 - ROUTES 87 - MONITEAU COUNTY | 2 of 5 | $1,630,760 | +11% |
| 15 NOV 2024 | 241115-B02 | Northeast | J2S3195, J2S3314 - ROUTE ZZ, K - MONTOGMERY, AUDRAIN COUNTIES | 3 of 8 | $2,116,193 | +3.0% |
| 15 NOV 2024 | 241115-D05 | Central | JCD0057, JCD0115-ROUTE U, 179-MONITEAU COUNTY | 2 of 5 | $1,220,596 | +11% |
| 20 SEP 2024 | 240920-D10 | Central | JCD0177 - ROUTE MM - CAMDEN COUNTY | 1 of 3 | $461,629 | Low, 12% under the second |
| 20 SEP 2024 | 240920-H01 | Southeast | J9P3687 - ROUTE 19 - SHANNON COUNTY | 6 of 7 | $2,711,937 | +38% |
| 13 AUG 2024 | 240813-B05 | Northeast | JNE0171 - ROUTE U - WARREN COUNTY | 7 of 10 | $2,540,047 | +71% |
| 21 JUN 2024 | 240621-C01 | Kansas City | J3S3204 - ROUTE M - PETTIS COUNTY | 3 of 9 | $1,343,496 | +3.0% |
| 17 MAY 2024 | 240517-D01 | Central | J5P3420 - ROUTE 19 - DENT COUNTY | 1 of 6 | $1,430,780 | Low, 8.0% under the second |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.