Gene Haile Excavating, Inc.: MoDOT bid record

Gene Haile Excavating, Inc. submitted 71 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 24 of them (34%). When it was not low, its total sat a median +16% above the low bid.

Owner
Missouri DOT
Low bid volume
$25,851,792
Latest bid
16 OCT 2026
Data through
16 OCT 2026
71Bids
24Low bids
34Win rate, percent
+16%Median gap to the low bid when not low, 47 bids

By year

YearBidsLow bidsWin rate
202010330%
20213133%
202212433%
202315427%
202414750%
20259333%
20268225%
Gene Haile Excavating, Inc., MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Central331442%
Kansas City1119%
Northeast9333%
Southwest8113%
Northwest6350%
Southeast4250%
Gene Haile Excavating, Inc., MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Placing type 2 rock blanket6113040CY5731 (54%)$15.00$26.00
Type D barrier7034219ALF3830 (79%)$85.50$135.80
Additional mobilization for seeding6181020EACH2929 (100%)$600.00$600.00
Bridge approach slab (minor road)5031011ASY5022 (44%)$126.00$195.00
Permanent erosion control geotextile6240103ASY6121 (34%)$3.00$4.00
Pile point reinforcement7027000EACH3518 (51%)$120.00$155.00
Class B concrete (substructure)7032003CY3817 (45%)$1,000.00$1,300.00
Type H barrier7034216LF2214 (64%)$85.00$126.00
Furnishing type 2 rock blanket6113020CY5713 (23%)$48.00$52.00
Type 1 aggregate for base (4 in. thick)3040143SY5511 (20%)$13.50$14.00
Compacting embankment2036000CY5211 (21%)$6.00$7.65
Silt fence8061019LF7710 (13%)$3.50$3.45
Gene Haile Excavating, Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Gene Haile Excavating, Inc., MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 OCT 2026261016-A02NorthwestJNWM0144 - ROUTE 29 - ANDREW COUNTY2 of 3$364,050+84%
16 OCT 2026261016-D06CentralJCD0229, JCD0302 - ROUTES T, 87 - MONITEAU COUNTY1 of 5$435,919Low, 9.0% under the second
16 OCT 2026261016-D14CentralJST0017C - ROUTE B - COOPER COUNTY2 of 6$1,518,104+12%
16 OCT 2026261016-G07SouthwestJSR0138 - ROUTE N - POLK COUNTY2 of 9$1,144,737+2.0%
18 SEP 2026260918-D08CentralJCD0340 - ROUTE B - DENT COUNTY2 of 6$280,048+27%
18 SEP 2026260918-D11CentralJCD0219B-ROUTE 54 - COLE COUNTY3 of 6$408,478+14%
16 JAN 2026260116-C04Kansas CityJKU0144 - ROUTE D - CASS COUNTY9 of 10$3,547,814+37%
16 JAN 2026260116-D01CentralJ5S3536, J5S3555-ROUTE CC, W-MORGAN, MONITEAU COUNTY1 of 5$1,243,686Low, 8.0% under the second
12 DEC 2025251212-D01CentralJ5P3538 - ROUTE 7 - CAMDEN COUNTY4 of 5$1,625,015+48%
12 DEC 2025251212-D03CentralJ5S3551 - ROUTE AA - COLE COUNTY4 of 6$1,171,818+55%
12 DEC 2025251212-D04CentralJCD0074 - ROUTE 179 - COLE COUNTY3 of 7$626,985+27%
14 NOV 2025251114-H09SoutheastJSEM0114 - ROUTE 95 - WRIGHT COUNTY2 of 6$482,668+39%
19 SEP 2025250919-H03SoutheastJ9S3691-ROUTE AF-WRIGHT COUNTY1 of 8$1,925,438Low, 4.0% under the second
15 AUG 2025250815-A01Northwest4 Bridge deck replacements4 of 7$3,450,861+39%
16 MAY 2025250516-D03Central2 Bridge deck replacements5 of 7$2,979,204+37%
21 FEB 2025250221-B01NortheastJ2S2160 - ROUTE J - MACON COUNTY1 of 3$1,825,000Low, 9.0% under the second
21 FEB 2025250221-B03NortheastJNE0053, JNE0154 - ROUTE K - MONTGOMERY1 of 10$3,932,449Low, 12% under the second
13 DEC 2024241213-D02CentralJCD0113 - ROUTES 87 - MONITEAU COUNTY2 of 5$1,630,760+11%
15 NOV 2024241115-B02NortheastJ2S3195, J2S3314 - ROUTE ZZ, K - MONTOGMERY, AUDRAIN COUNTIES3 of 8$2,116,193+3.0%
15 NOV 2024241115-D05CentralJCD0057, JCD0115-ROUTE U, 179-MONITEAU COUNTY2 of 5$1,220,596+11%
20 SEP 2024240920-D10CentralJCD0177 - ROUTE MM - CAMDEN COUNTY1 of 3$461,629Low, 12% under the second
20 SEP 2024240920-H01SoutheastJ9P3687 - ROUTE 19 - SHANNON COUNTY6 of 7$2,711,937+38%
13 AUG 2024240813-B05NortheastJNE0171 - ROUTE U - WARREN COUNTY7 of 10$2,540,047+71%
21 JUN 2024240621-C01Kansas CityJ3S3204 - ROUTE M - PETTIS COUNTY3 of 9$1,343,496+3.0%
17 MAY 2024240517-D01CentralJ5P3420 - ROUTE 19 - DENT COUNTY1 of 6$1,430,780Low, 8.0% under the second
Gene Haile Excavating, Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy