E & C Bridge, LLC: MoDOT bid record

E & C Bridge, LLC submitted 76 bids on Missouri DOT contracts in the data, from 20 MAR 2020 to 16 OCT 2026, and was the low bidder on 31 of them (41%). When it was not low, its total sat a median +10% above the low bid.

Owner
Missouri DOT
Low bid volume
$39,521,483
Latest bid
16 OCT 2026
Data through
16 OCT 2026
76Bids
31Low bids
41Win rate, percent
+10%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
202010550%
2021200%
202216850%
202311218%
202414857%
202513646%
202610220%
E & C Bridge, LLC, MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Central461941%
Northeast12433%
Kansas City7343%
Northwest7343%
Southwest3133%
Southeast11100%
E & C Bridge, LLC, MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Slab drain7123610EACH7756 (73%)$375.00$492.09
Silt fence8061019LF7350 (68%)$3.00$3.45
Construction signs6161005SF8247 (57%)$7.25$7.00
Sediment removal8061016CY7346 (63%)$10.00$25.69
Type A crashworthy end terminal (MASH)6063014EACH5441 (76%)$3,300.00$3,300.00
Furnishing type 2 rock blanket6113020CY7237 (51%)$50.00$52.00
MGS bridge approach transition section (regular/no curb)6061069EACH4936 (73%)$3,875.00$3,800.00
MGS guardrail6061060LF4436 (82%)$30.00$30.00
Advanced warning rail system6161008EACH6434 (53%)$47.50$51.40
Rock ditch check8061005LF5334 (64%)$16.00$20.00
Type III moveable barricade6161030EACH6032 (53%)$147.50$156.69
4 in. yellow standard waterborne pavement marking paint, type P beads6206001CLF4632 (70%)$0.82$0.25
E & C Bridge, LLC, MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

E & C Bridge, LLC, MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 OCT 2026261016-D06CentralJCD0229, JCD0302 - ROUTES T, 87 - MONITEAU COUNTY4 of 5$499,031+14%
16 OCT 2026261016-G07SouthwestJSR0138 - ROUTE N - POLK COUNTY7 of 9$1,241,128+10%
15 MAY 2026260515-C13Kansas CityJ3P3206-ROUTE 65-PETTIS COUNTY1 of 3$2,824,492Low, 34% under the second
15 MAY 2026260515-D02CentralJCD0023, JCD0024 - ROUTE 87 - COOPER COUNTY2 of 3$819,327+59%
15 MAY 2026260515-D05CentralJCD0228 - ROUTE A - WASHINGTON COUNTY2 of 6$2,319,042+2.0%
17 APR 2026260417-D05CentralJ5S3559 - ROUTE B - DENT COUNTY2 of 5$1,099,860+10%
20 MAR 2026260320-D02CentralJCD0073 - ROUTE H - CALLAWAY COUNTY1 of 3$621,377Low, 12% under the second
20 FEB 2026260220-A02NorthwestJNW0144 - ROUTE U - CALDWELL COUNTY3 of 4$1,759,584+23%
16 JAN 2026260116-C02Kansas CityJKR0101 - ROUTE 50 - JOHNSON COUNTY2 of 2$4,112,430+11%
16 JAN 2026260116-D01CentralJ5S3536, J5S3555-ROUTE CC, W-MORGAN, MONITEAU COUNTY3 of 5$1,359,490+9.0%
12 DEC 2025251212-A02NorthwestJNW0014 - ROUTE E, FF, JJ, OO - MERCER, PUTNAM AND SULLIVAN COUNTIES1 of 2$2,849,029Low, 20% under the second
12 DEC 2025251212-B03NortheastJNE0051 - ROUTE J - LINCOLN COUNTY3 of 5$2,022,877+7.0%
12 DEC 2025251212-D01CentralJ5P3538 - ROUTE 7 - CAMDEN COUNTY1 of 5$1,099,995Low, 29% under the second
12 DEC 2025251212-D03CentralJ5S3551 - ROUTE AA - COLE COUNTY1 of 6$755,965Low, 29% under the second
12 DEC 2025251212-D04CentralJCD0074 - ROUTE 179 - COLE COUNTY1 of 7$492,322Low, 20% under the second
19 SEP 2025250919-B02NortheastJNE0052, JNE0152 - ROUTES B, W - PIKE COUNTY3 of 4$2,428,035+8.0%
15 AUG 2025250815-A01Northwest4 Bridge deck replacements1 of 7$2,489,470Low, 28% under the second
20 JUN 2025250620-C01Kansas CityJKR0102 - ROUTE 50 - JOHNSON COUNTY2 of 5$1,265,979+2.0%
16 MAY 2025250516-D03Central2 Bridge deck replacements2 of 7$2,479,915+14%
21 FEB 2025250221-B03NortheastJNE0053, JNE0154 - ROUTE K - MONTGOMERY7 of 10$4,728,692+20%
21 FEB 2025250221-D02CentralJ5S3533 - ROUTES OR I-44 - CRAWFORD COUNTY1 of 5$579,283Low, 28% under the second
17 JAN 2025250117-B03NortheastJNE0123 - ROUTE RA - MONTGOMERY COUNTY2 of 3$320,066+10%
17 JAN 2025250117-D02CentralJ5P3560, JCD0157 - ROUTE 54 - COLE COUNTY2 of 3$2,995,045+5.0%
13 DEC 2024241213-D4ACentralJ5P3523, J5P3525 - ROUTE 50, 54 - COLE COUNTY1 of 3$4,994,404Low, 5.0% under the second
13 DEC 2024241213-D4BCentralJCD0075 - ROUTE 50, 54 - COLE COUNTY1 of 4$355,779Low, 12% under the second
E & C Bridge, LLC: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.