MoDOT contract 250919-B02 bid tabulation
JNE0052, JNE0152 - ROUTES B, W - PIKE COUNTY. Let by Missouri DOT on September 19, 2025, Pike, Northeast. 4 bids received; low bid $2,246,715 by Bleigh Construction Company.
- Owner
- Missouri DOT
- Letting
- 19 SEP 2025
- Pay items
- 90
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bleigh Construction Company | $2,246,715 | Low |
| 2 | Louis-Company, LLC | $2,425,332 | +8.0% |
| 3 | E & C Bridge, LLC | $2,428,035 | +8.0% |
| 4 | Emery Sapp & Sons, Inc. | $2,875,889 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bleigh Construction Company | 2. Louis-Company, LLC | 3. E & C Bridge, LLC | 4. Emery Sapp & Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $9,500.00 | $13,121 | $12,000 | $14,800 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $22,300 | $10,097 | $25,000 | $14,490 |
| 0030 | Class A excavation (2031000) | CY | 1,455 | $17.00 | $21.16 | $25.00 | $9.00 |
| 0040 | Embankment in place (2035500) | CY | 262 | $31.00 | $68.94 | $30.00 | $33.00 |
| 0050 | Compacting embankment (2036000) | CY | 1,288 | $4.80 | $5.05 | $10.00 | $7.00 |
| 0060 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 5 | $1,400.00 | $1,197.22 | $1,750.00 | $1,200.00 |
| 0070 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 1,052 | $10.00 | $15.51 | $10.75 | $25.00 |
| 0080 | Misc.optional pavement (4019905) | SY | 1,051 | $79.00 | $100.86 | $79.00 | $113.50 |
| 0090 | Furnishing type 2 rock blanket (6113020) | CY | 523 | $44.00 | $82.40 | $45.00 | $58.00 |
| 0100 | Placing type 2 rock blanket (6113040) | CY | 523 | $21.00 | $21.26 | $25.00 | $28.50 |
| 0110 | Construction signs (6161005) | SF | 148 | $7.00 | $9.26 | $20.00 | $7.90 |
| 0120 | Relocated signs (6161010) | SF | 64 | $7.00 | $9.26 | $15.00 | $7.90 |
| 0130 | Type 3 moveable barricade (6161030) | EACH | 10 | $120.00 | $185.13 | $200.00 | $158.30 |
| 0140 | Mobilization (6181000) | LS | 1 | $133,800 | $66,704 | $125,000 | $163,582 |
| 0150 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 2,428 | $1.57 | $1.28 | $0.75 | $1.09 |
| 0160 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 438 | $1.57 | $1.28 | $0.75 | $1.09 |
| 0170 | Permanent erosion control geotextile (6240103A) | SY | 784 | $2.90 | $3.43 | $3.75 | $4.25 |
| 0180 | Contractor furnished surveying and staking (6274000) | LS | 1 | $6,800.00 | $24,259 | $12,200 | $17,500 |
| 0190 | Misc.seeding and mulching - cool season mixtures (8059901) | LS | 1 | $4,000.00 | $5,107.07 | $4,000.00 | $4,400.00 |
| 0200 | Rock ditch check (8061005) | LF | 30 | $38.00 | $51.07 | $25.00 | $27.00 |
| 0210 | Sediment removal (8061016) | CY | 14 | $58.00 | $122.17 | $10.00 | $110.00 |
| 0220 | Silt fence (8061019) | LF | 1,075 | $2.50 | $3.19 | $2.50 | $2.75 |
| 0230 | Type C berm (8061050) | LF | 245 | $31.50 | $44.69 | $15.00 | $54.00 |
| 0240 | MGS guardrail (6061060) | LF | 275 | $35.16 | $44.89 | $35.16 | $38.50 |
| 0250 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $4,075.71 | $5,203.73 | $4,075.71 | $4,450.00 |
| 0260 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $3,663.78 | $4,677.80 | $3,663.78 | $4,000.00 |
| 0270 | Class 1 excavation (2061000) | CY | 80 | $60.00 | $16.03 | $50.00 | $110.00 |
| 0280 | Removal of bridges (2160500) | LS | 1 | $51,000 | $72,379 | $96,000 | $85,000 |
| 0290 | Bridge approach slab (minor road) (5031011A) | SY | 109 | $116.00 | $146.95 | $105.00 | $255.00 |
| 0300 | Drilled shafts (3 FT. 6 in. dia.) (7011105) | LF | 92.90 | $650.00 | $677.16 | $550.00 | $640.00 |
| 0310 | Rock sockets (3 FT 0 in. dia.) (7011204) | LF | 80 | $826.00 | $962.90 | $650.00 | $770.00 |
| 0320 | Video camera inspection (7011300) | EACH | 4 | $1,200.00 | $957.58 | $600.00 | $800.00 |
| 0330 | Foundation inspection holes (7011400) | LF | 120 | $157.00 | $201.73 | $175.00 | $208.00 |
| 0340 | Sonic logging testing (7011600) | EACH | 4 | $4,700.00 | $1,691.72 | $1,500.00 | $5,700.00 |
| 0350 | Galvanized structural steel piles (12 in) (7021212) | LF | 312 | $101.00 | $148.48 | $98.00 | $155.00 |
| 0360 | Pile point reinforcement (7027000) | EACH | 8 | $126.00 | $210.67 | $500.00 | $150.00 |
| 0370 | Class B concrete (substructure) (7032003) | CY | 51 | $1,630.00 | $1,785.11 | $1,200.00 | $2,000.00 |
| 0380 | Slab on concrete I-girder (7034213) | SY | 630 | $462.00 | $457.21 | $525.00 | $580.00 |
| 0390 | Type D barrier (7034219A) | LF | 468 | $125.00 | $147.52 | $115.00 | $151.00 |
| 0400 | Type 6 (54 in.), prestressed concrete I-girder (7056003) | LF | 630 | $307.00 | $336.30 | $330.00 | $420.00 |
| 0410 | Reinforcing steel (bridges) (7061060) | LB | 18,310 | $2.47 | $1.13 | $1.50 | $3.00 |
| 0420 | Steel intermediate diaphragm for P/S concrete girders (7123301) | EACH | 6 | $1,560.00 | $1,339.33 | $1,500.00 | $2,100.00 |
| 0430 | Slab drain (7123610) | EACH | 16 | $540.00 | $585.33 | $450.00 | $750.00 |
| 0440 | Vertical drain at end bents (7151001) | EACH | 2 | $3,000.00 | $2,527.45 | $1,500.00 | $3,000.00 |
| 0450 | Plain neoprene bearing pad (7161000) | EACH | 6 | $195.00 | $144.70 | $170.00 | $380.00 |
| 0460 | Laminated neoprene bearing pad (7161002) | EACH | 12 | $162.00 | $126.40 | $180.00 | $430.00 |
| 0470 | Clearing and grubbing (2013000) | ACRE | 1 | $14,500 | $10,467 | $7,500.00 | $8,500.00 |
| 0480 | Removal of improvements (2022010) | LS | 1 | $10,700 | $12,587 | $20,000 | $10,500 |
| 0490 | Disposal and plugging of wells (2027000) | EACH | 1 | $4,062.00 | $13,683 | $10,000 | $11,900 |
| 0500 | Class A excavation (2031000) | CY | 645 | $31.00 | $22.48 | $35.00 | $28.00 |
| 0510 | Compacting embankment (2036000) | CY | 63 | $10.00 | $246.02 | $30.00 | $9.70 |
| 0520 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 1 | $1,600.00 | $4,263.85 | $1,850.00 | $2,200.00 |
| 0530 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 139 | $25.00 | $14.19 | $22.50 | $37.00 |
| 0540 | Gravel (A) or crushed stone (B) (3105002) | TON | 6 | $100.00 | $188.49 | $50.00 | $280.00 |
| 0550 | 10 inches, bituminous pavement (4010103) | SY | 139 | $208.00 | $265.57 | $208.00 | $164.00 |
| 0560 | Bituminous pavement mixture PG58-28H (surface leveling) (4020521) | TON | 95 | $95.00 | $121.29 | $95.00 | $230.00 |
| 0570 | Tack coat (4071005) | GAL | 140 | $3.00 | $3.83 | $3.00 | $16.40 |
| 0580 | Furnishing type 2 rock blanket (6113020) | CY | 536 | $52.00 | $82.35 | $48.00 | $62.00 |
| 0590 | Placing type 2 rock blanket (6113040) | CY | 536 | $38.00 | $19.15 | $25.00 | $29.00 |
| 0600 | Construction signs (6161005) | SF | 222 | $7.00 | $9.26 | $18.00 | $7.90 |
| 0610 | Relocated signs (6161010) | SF | 64 | $7.00 | $9.26 | $15.00 | $7.90 |
| 0620 | Type 3 moveable barricade (6161030) | EACH | 10 | $120.00 | $185.13 | $200.00 | $158.50 |
| 0630 | Mobilization (6181000) | LS | 1 | $77,000 | $56,682 | $125,000 | $120,000 |
| 0640 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 1,600 | $1.67 | $1.28 | $0.80 | $1.09 |
| 0650 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 1,000 | $1.67 | $1.28 | $0.80 | $1.09 |
| 0660 | Permanent erosion control geotextile (6240103A) | SY | 876 | $3.90 | $3.75 | $3.75 | $4.25 |
| 0670 | Contractor furnished surveying and staking (6274000) | LS | 1 | $9,700.00 | $20,428 | $9,400.00 | $16,700 |
| 0680 | Misc.seeding and mulching-cool season grasses (8059901) | LS | 1 | $4,000.00 | $5,107.07 | $4,000.00 | $4,400.00 |
| 0690 | Rock ditch check (8061005) | LF | 20 | $64.00 | $44.69 | $30.00 | $32.00 |
| 0700 | Sediment removal (8061016) | CY | 6 | $140.00 | $213.79 | $10.00 | $240.00 |
| 0710 | Silt fence (8061019) | LF | 409 | $3.00 | $3.83 | $3.00 | $3.30 |
| 0720 | Type C berm (8061050) | LF | 137 | $44.00 | $37.45 | $15.00 | $58.00 |
| 0730 | 2 in. PSST post - 12 GA. (9031270A) | LF | 192 | $15.45 | $19.15 | $15.45 | $16.40 |
| 0740 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 12 | $156.37 | $140.45 | $156.37 | $120.00 |
| 0750 | SHF-flat sheet fluorescent (9035069A) | SF | 36 | $49.33 | $51.07 | $49.33 | $44.00 |
| 0910 | Class 1 excavation (2061000) | CY | 60 | $65.00 | $42.76 | $60.00 | $110.00 |
| 0920 | Removal of bridges (2160500) | LS | 1 | $30,900 | $40,287 | $75,000 | $65,000 |
| 0930 | Bridge approach slab (minor road) (5031011A) | SY | 109 | $248.00 | $311.65 | $220.00 | $290.00 |
| 0940 | Galvanized structural steel piles (14 in) (7021214) | LF | 520 | $126.00 | $143.28 | $115.00 | $175.00 |
| 0950 | Pre-bore for piling (7026000) | LF | 160 | $60.00 | $76.61 | $150.00 | $105.00 |
| 0960 | Pile point reinforcement (7027000) | EACH | 18 | $167.00 | $236.20 | $250.00 | $200.00 |
| 0970 | Class B concrete (substructure) (7032003) | CY | 39 | $1,623.00 | $2,393.86 | $1,400.00 | $2,200.00 |
| 0980 | Slab on steel (7034212) | SY | 345 | $579.00 | $587.88 | $700.00 | $680.00 |
| 0990 | Type D barrier (7034219A) | LF | 267 | $164.00 | $183.76 | $115.00 | $210.00 |
| 1000 | Reinforcing steel (bridges) (7061060) | LB | 2,560 | $2.79 | $0.96 | $3.00 | $2.90 |
| 1010 | Fabricated structural low alloy steel (plate girder) A709, grade 50 (7121121) | LB | 39,060 | $3.03 | $3.33 | $3.80 | $4.00 |
| 1020 | Slab drain (7123610) | EACH | 10 | $356.00 | $599.97 | $350.00 | $700.00 |
| 1030 | Misc.finish field coat (system L) (7129904) | SF | 2,200 | $10.41 | $11.49 | $10.50 | $9.90 |
| 1040 | Vertical drain at end bents (7151001) | EACH | 2 | $2,600.00 | $2,527.45 | $1,500.00 | $3,100.00 |
| 1050 | Laminated neoprene bearing pad (7161002) | EACH | 18 | $123.00 | $95.76 | $150.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.