Bleigh Construction Company: MoDOT bid record
Bleigh Construction Company submitted 26 bids on Missouri DOT contracts in the data, from 18 DEC 2020 to 12 DEC 2025, and was the low bidder on 11 of them (42%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $21,054,467
- Latest bid
- 12 DEC 2025
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 6 | 4 | 67% |
| 2022 | 3 | 2 | 67% |
| 2023 | 4 | 2 | 50% |
| 2024 | 5 | 0 | 0% |
| 2025 | 7 | 3 | 43% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Northeast | 25 | 11 | 44% |
| Northwest | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Furnishing type 2 rock blanket | 6113020 | CY | 33 | 24 (73%) | $35.00 | $52.00 |
| Silt fence | 8061019 | LF | 38 | 19 (50%) | $3.27 | $3.45 |
| Compacting embankment | 2036000 | CY | 34 | 17 (50%) | $6.00 | $7.65 |
| Type 1 aggregate for base (4 in. thick) | 3040143 | SY | 34 | 16 (47%) | $12.25 | $14.00 |
| Plain neoprene bearing pad | 7161000 | EACH | 26 | 16 (62%) | $197.50 | $265.00 |
| Permanent erosion control geotextile | 6240103A | SY | 37 | 15 (41%) | $3.40 | $4.00 |
| Class 1 excavation | 2061000 | CY | 32 | 13 (41%) | $45.50 | $50.00 |
| Bridge approach slab (minor road) | 5031011A | SY | 32 | 12 (38%) | $172.00 | $195.00 |
| Pile point reinforcement | 7027000 | EACH | 32 | 12 (38%) | $160.00 | $155.00 |
| Construction signs | 6161005 | SF | 39 | 11 (28%) | $9.20 | $7.00 |
| Laminated neoprene bearing pad | 7161002 | EACH | 22 | 11 (50%) | $187.50 | $300.00 |
| Class A excavation | 2031000 | CY | 36 | 10 (28%) | $18.45 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emery Sapp & Sons, Inc. | 21 | 6 of 21 |
| Capital Paving & Construction, LLC | 10 | 1 of 10 |
| S & A Equipment & Builders, LLC | 7 | 3 of 7 |
| E & C Bridge, LLC | 7 | 2 of 7 |
| Magruder Construction Co., Inc. | 6 | 1 of 6 |
| Gene Haile Excavating, Inc. | 6 | 5 of 6 |
| Don Schnieders Excavating Company, Inc. | 5 | 4 of 5 |
| Mera Excavating, LLC | 5 | 2 of 5 |
| Hardy Construction, LLC | 5 | 1 of 5 |
| Phillips Hardy, Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 DEC 2025 | 251212-B03 | Northeast | JNE0051 - ROUTE J - LINCOLN COUNTY | 2 of 5 | $1,974,288 | +4.0% |
| 19 SEP 2025 | 250919-B02 | Northeast | JNE0052, JNE0152 - ROUTES B, W - PIKE COUNTY | 1 of 4 | $2,246,715 | Low, 8.0% under the second |
| 15 AUG 2025 | 250815-B05 | Northeast | JNE0146 - ROUTE V - LEWIS COUNTY | 3 of 3 | $783,782 | +5.0% |
| 21 FEB 2025 | 250221-B01 | Northeast | J2S2160 - ROUTE J - MACON COUNTY | 2 of 3 | $1,983,052 | +9.0% |
| 21 FEB 2025 | 250221-B03 | Northeast | JNE0053, JNE0154 - ROUTE K - MONTGOMERY | 6 of 10 | $4,598,309 | +17% |
| 17 JAN 2025 | 250117-B01 | Northeast | JNE0049, JNE0141 - ROUTE V,E - ADAIR COUNTY | 1 of 2 | $2,713,883 | Low, 25% under the second |
| 17 JAN 2025 | 250117-B02 | Northeast | JNE0050 - ROUTE J - SHELBY COUNTY | 1 of 2 | $860,517 | Low, 26% under the second |
| 15 NOV 2024 | 241115-B02 | Northeast | J2S3195, J2S3314 - ROUTE ZZ, K - MONTOGMERY, AUDRAIN COUNTIES | 4 of 8 | $2,208,614 | +7.0% |
| 19 APR 2024 | 240419-B01 | Northeast | JNE0127-ROUTE K -SHELBY COUNTY | 2 of 6 | $1,058,750 | +12% |
| 16 FEB 2024 | 240216-B01 | Northeast | JNE0125 - ROUTE C - AUDRAIN COUNTY | 4 of 6 | $996,492 | +16% |
| 16 FEB 2024 | 240216-B02 | Northeast | JNE0126 - ROUTE 161 - MONTGOMERY COUNTY | 4 of 9 | $1,289,131 | +15% |
| 19 JAN 2024 | 240119-B02 | Northeast | J2S3317 - ROUTE AA - MONTORE COUNTY | 3 of 10 | $998,156 | +7.0% |
| 15 DEC 2023 | 231215-B01 | Northeast | J2S3256-ROUTE 11-ADAIR COUNTY | 9 of 9 | $1,419,787 | +24% |
| 17 MAR 2023 | 230317-B01 | Northeast | J2S3147 - ROUTE M - MONROE COUNTY | 1 of 2 | $1,182,616 | Low, 49% under the second |
| 17 MAR 2023 | 230317-B02 | Northeast | J2S3244, J2S3257, J3S2164 - ROUTES D,J,Z - MONROE COUNTY | 2 of 3 | $2,507,681 | +1.0% |
| 20 JAN 2023 | 230120-B01 | Northeast | J2S3320, J2S3322, J2S3449 - ROUTES H, T, B SCOTLAND AND ADAIR COUNTIES | 1 of 2 | $3,625,670 | Low, 25% under the second |
| 16 DEC 2022 | 221216-B01 | Northeast | J2P3197, J2P3249 - ROUTE 136, N - SCHULYER, SCOTLAND COUNTY | 1 of 2 | $2,263,616 | Low, 27% under the second |
| 16 SEP 2022 | 220916-B03 | Northeast | J2P0791,J2P2193-ROUTES 136, 6 - SCHUYLER, ADAIR COUNTIES | 3 of 4 | $6,465,633 | +5.0% |
| 15 APR 2022 | 220415-B07 | Northeast | J2S3319 - Route C - Scotland County | 1 of 3 | $1,043,218 | Low, 15% under the second |
| 17 DEC 2021 | 211217-B05 | Northeast | J2S3358 - ROUTE N - PIKE COUNTY | 1 of 4 | $1,397,216 | Low, 10% under the second |
| 19 NOV 2021 | 211119-A08 | Northwest | J1S3213 - ROUTE B - GENTRY COUNTY | 3 of 5 | $1,379,191 | +21% |
| 19 MAR 2021 | 210319-B01 | Northeast | J2P3089,J3P0568 - ROUTE 15 - SCOTLAND COUNTY | 1 of 4 | $2,424,765 | Low, 4.0% under the second |
| 19 MAR 2021 | 210319-B02 | Northeast | J2S3148,J3S2202 - ROUTES C,K - LEWIS COUNTY | 1 of 4 | $1,698,197 | Low, 11% under the second |
| 19 FEB 2021 | 210219-B01 | Northeast | J2S0413,J2S0416 - ROUTE 11,149 - ADAIR COUNTY | 2 of 8 | $1,259,283 | +10% |
| 19 FEB 2021 | 210219-B02 | Northeast | J2S3005,J2S3330 - ROUTE M,CC - LINCOLN COUNTY | 1 of 4 | $1,598,054 | Low, 1.0% under the second |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.