Bleigh Construction Company: MoDOT bid record

Bleigh Construction Company submitted 26 bids on Missouri DOT contracts in the data, from 18 DEC 2020 to 12 DEC 2025, and was the low bidder on 11 of them (42%). When it was not low, its total sat a median +10% above the low bid.

Owner
Missouri DOT
Low bid volume
$21,054,467
Latest bid
12 DEC 2025
Data through
16 OCT 2026
26Bids
11Low bids
42Win rate, percent
+10%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
2020100%
20216467%
20223267%
20234250%
2024500%
20257343%
Bleigh Construction Company, MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Northeast251144%
Northwest100%
Bleigh Construction Company, MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Furnishing type 2 rock blanket6113020CY3324 (73%)$35.00$52.00
Silt fence8061019LF3819 (50%)$3.27$3.45
Compacting embankment2036000CY3417 (50%)$6.00$7.65
Type 1 aggregate for base (4 in. thick)3040143SY3416 (47%)$12.25$14.00
Plain neoprene bearing pad7161000EACH2616 (62%)$197.50$265.00
Permanent erosion control geotextile6240103ASY3715 (41%)$3.40$4.00
Class 1 excavation2061000CY3213 (41%)$45.50$50.00
Bridge approach slab (minor road)5031011ASY3212 (38%)$172.00$195.00
Pile point reinforcement7027000EACH3212 (38%)$160.00$155.00
Construction signs6161005SF3911 (28%)$9.20$7.00
Laminated neoprene bearing pad7161002EACH2211 (50%)$187.50$300.00
Class A excavation2031000CY3610 (28%)$18.45$20.00
Bleigh Construction Company, MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Bleigh Construction Company, MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 DEC 2025251212-B03NortheastJNE0051 - ROUTE J - LINCOLN COUNTY2 of 5$1,974,288+4.0%
19 SEP 2025250919-B02NortheastJNE0052, JNE0152 - ROUTES B, W - PIKE COUNTY1 of 4$2,246,715Low, 8.0% under the second
15 AUG 2025250815-B05NortheastJNE0146 - ROUTE V - LEWIS COUNTY3 of 3$783,782+5.0%
21 FEB 2025250221-B01NortheastJ2S2160 - ROUTE J - MACON COUNTY2 of 3$1,983,052+9.0%
21 FEB 2025250221-B03NortheastJNE0053, JNE0154 - ROUTE K - MONTGOMERY6 of 10$4,598,309+17%
17 JAN 2025250117-B01NortheastJNE0049, JNE0141 - ROUTE V,E - ADAIR COUNTY1 of 2$2,713,883Low, 25% under the second
17 JAN 2025250117-B02NortheastJNE0050 - ROUTE J - SHELBY COUNTY1 of 2$860,517Low, 26% under the second
15 NOV 2024241115-B02NortheastJ2S3195, J2S3314 - ROUTE ZZ, K - MONTOGMERY, AUDRAIN COUNTIES4 of 8$2,208,614+7.0%
19 APR 2024240419-B01NortheastJNE0127-ROUTE K -SHELBY COUNTY2 of 6$1,058,750+12%
16 FEB 2024240216-B01NortheastJNE0125 - ROUTE C - AUDRAIN COUNTY4 of 6$996,492+16%
16 FEB 2024240216-B02NortheastJNE0126 - ROUTE 161 - MONTGOMERY COUNTY4 of 9$1,289,131+15%
19 JAN 2024240119-B02NortheastJ2S3317 - ROUTE AA - MONTORE COUNTY3 of 10$998,156+7.0%
15 DEC 2023231215-B01NortheastJ2S3256-ROUTE 11-ADAIR COUNTY9 of 9$1,419,787+24%
17 MAR 2023230317-B01NortheastJ2S3147 - ROUTE M - MONROE COUNTY1 of 2$1,182,616Low, 49% under the second
17 MAR 2023230317-B02NortheastJ2S3244, J2S3257, J3S2164 - ROUTES D,J,Z - MONROE COUNTY2 of 3$2,507,681+1.0%
20 JAN 2023230120-B01NortheastJ2S3320, J2S3322, J2S3449 - ROUTES H, T, B SCOTLAND AND ADAIR COUNTIES1 of 2$3,625,670Low, 25% under the second
16 DEC 2022221216-B01NortheastJ2P3197, J2P3249 - ROUTE 136, N - SCHULYER, SCOTLAND COUNTY1 of 2$2,263,616Low, 27% under the second
16 SEP 2022220916-B03NortheastJ2P0791,J2P2193-ROUTES 136, 6 - SCHUYLER, ADAIR COUNTIES3 of 4$6,465,633+5.0%
15 APR 2022220415-B07NortheastJ2S3319 - Route C - Scotland County1 of 3$1,043,218Low, 15% under the second
17 DEC 2021211217-B05NortheastJ2S3358 - ROUTE N - PIKE COUNTY1 of 4$1,397,216Low, 10% under the second
19 NOV 2021211119-A08NorthwestJ1S3213 - ROUTE B - GENTRY COUNTY3 of 5$1,379,191+21%
19 MAR 2021210319-B01NortheastJ2P3089,J3P0568 - ROUTE 15 - SCOTLAND COUNTY1 of 4$2,424,765Low, 4.0% under the second
19 MAR 2021210319-B02NortheastJ2S3148,J3S2202 - ROUTES C,K - LEWIS COUNTY1 of 4$1,698,197Low, 11% under the second
19 FEB 2021210219-B01NortheastJ2S0413,J2S0416 - ROUTE 11,149 - ADAIR COUNTY2 of 8$1,259,283+10%
19 FEB 2021210219-B02NortheastJ2S3005,J2S3330 - ROUTE M,CC - LINCOLN COUNTY1 of 4$1,598,054Low, 1.0% under the second
Bleigh Construction Company: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy