Don Schnieders Excavating Company, Inc.: MoDOT bid record
Don Schnieders Excavating Company, Inc. submitted 65 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 18 SEP 2026, and was the low bidder on 12 of them (18%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $22,540,356
- Latest bid
- 18 SEP 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 3 | 50% |
| 2021 | 2 | 0 | 0% |
| 2022 | 9 | 1 | 11% |
| 2023 | 12 | 2 | 17% |
| 2024 | 15 | 1 | 7% |
| 2025 | 11 | 3 | 27% |
| 2026 | 10 | 2 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Central | 51 | 8 | 16% |
| Kansas City | 7 | 2 | 29% |
| Northeast | 5 | 1 | 20% |
| St. Louis | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 6161005 | SF | 64 | 49 (77%) | $6.50 | $7.00 |
| Silt fence | 8061019 | LF | 71 | 43 (61%) | $3.00 | $3.45 |
| Type III moveable barricade | 6161030 | EACH | 48 | 39 (81%) | $125.00 | $156.69 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 46 | 36 (78%) | $0.88 | $0.20 |
| 4 in. yellow standard waterborne pavement marking paint, type P beads | 6206001C | LF | 45 | 33 (73%) | $1.00 | $0.25 |
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 43 | 32 (74%) | $3,227.67 | $3,300.00 |
| MGS guardrail | 6061060 | LF | 39 | 31 (79%) | $30.00 | $30.00 |
| Additional mobilization for seeding | 6181020 | EACH | 31 | 31 (100%) | $600.00 | $600.00 |
| MGS bridge approach transition section (regular/no curb) | 6061069 | EACH | 42 | 30 (71%) | $3,800.00 | $3,800.00 |
| Rock ditch check | 8061005 | LF | 55 | 29 (53%) | $15.00 | $20.00 |
| Advanced warning rail system | 6161008 | EACH | 47 | 22 (47%) | $50.00 | $51.40 |
| Class A excavation | 2031000 | CY | 44 | 20 (45%) | $11.93 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E & C Bridge, LLC | 36 | 27 of 36 |
| Gene Haile Excavating, Inc. | 29 | 22 of 29 |
| S & A Equipment & Builders, LLC | 26 | 11 of 26 |
| Emery Sapp & Sons, Inc. | 23 | 7 of 23 |
| Capital Paving & Construction, LLC | 20 | 5 of 20 |
| Mera Excavating, LLC | 17 | 4 of 17 |
| Widel, Inc. | 14 | 10 of 14 |
| Lehman Construction, LLC | 10 | 3 of 10 |
| Phillips Hardy, Inc. | 9 | 0 of 9 |
| Kozeny-Wagner, Inc. | 7 | 1 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 260918-D07 | Central | JCD0214 - ROUTE 50 - MONITEAU COUNTY | 5 of 5 | $1,394,556 | +64% |
| 18 SEP 2026 | 260918-D11 | Central | JCD0219B-ROUTE 54 - COLE COUNTY | 5 of 6 | $562,316 | +57% |
| 18 JUN 2026 | 260618-D01 | Central | JCD0124 - ROUTE BU 70 - BOONE COUNTY | 4 of 4 | $590,224 | +88% |
| 18 JUN 2026 | 260618-D05 | Central | JCD0204 - ROUTE 63 - BOONE COUNTY | 4 of 4 | $2,374,322 | +57% |
| 15 MAY 2026 | 260515-C13 | Kansas City | J3P3206-ROUTE 65-PETTIS COUNTY | 2 of 3 | $3,794,726 | +34% |
| 20 MAR 2026 | 260320-D02 | Central | JCD0073 - ROUTE H - CALLAWAY COUNTY | 2 of 3 | $693,090 | +12% |
| 20 MAR 2026 | 260320-D03 | Central | JCD0170 - ROUTE 54 - CALLAWAY COUNTY | 1 of 2 | $4,191,212 | Low, 38% under the second |
| 20 FEB 2026 | 260220-D01 | Central | JCD0123 - ROUTE AC - BOONE COUNTY | 3 of 3 | $1,754,686 | +23% |
| 16 JAN 2026 | 260116-C02 | Kansas City | JKR0101 - ROUTE 50 - JOHNSON COUNTY | 1 of 2 | $3,721,037 | Low, 11% under the second |
| 16 JAN 2026 | 260116-D01 | Central | J5S3536, J5S3555-ROUTE CC, W-MORGAN, MONITEAU COUNTY | 4 of 5 | $1,671,596 | +34% |
| 12 DEC 2025 | 251212-D01 | Central | J5P3538 - ROUTE 7 - CAMDEN COUNTY | 3 of 5 | $1,423,737 | +29% |
| 12 DEC 2025 | 251212-D02 | Central | J5S3418 - ROUTE OR 50 - COLE COUNTY | 2 of 3 | $1,725,616 | +11% |
| 12 DEC 2025 | 251212-D03 | Central | J5S3551 - ROUTE AA - COLE COUNTY | 5 of 6 | $1,292,559 | +71% |
| 12 DEC 2025 | 251212-D04 | Central | JCD0074 - ROUTE 179 - COLE COUNTY | 4 of 7 | $663,895 | +35% |
| 20 JUN 2025 | 250620-C01 | Kansas City | JKR0102 - ROUTE 50 - JOHNSON COUNTY | 4 of 5 | $1,391,133 | +13% |
| 16 MAY 2025 | 250516-D03 | Central | 2 Bridge deck replacements | 7 of 7 | $3,733,957 | +72% |
| 16 MAY 2025 | 250516-D07 | Central | JCD0126 - VARIOUS ROUTES - COLE, OSAGE COUNTIES | 3 of 3 | $2,102,653 | +63% |
| 18 APR 2025 | 250418-D01 | Central | J5S3552 - ROUTE J - CRAWFORD COUNTY | 1 of 2 | $615,058 | Low, 22% under the second |
| 21 FEB 2025 | 250221-B03 | Northeast | JNE0053, JNE0154 - ROUTE K - MONTGOMERY | 2 of 10 | $4,398,810 | +12% |
| 21 FEB 2025 | 250221-D06 | Central | JCD0101 - ROUTES OR 44 - LACLEDE COUNTY | 1 of 4 | $1,232,889 | Low, 5.0% under the second |
| 17 JAN 2025 | 250117-D02 | Central | J5P3560, JCD0157 - ROUTE 54 - COLE COUNTY | 1 of 3 | $2,849,278 | Low, 5.0% under the second |
| 13 DEC 2024 | 241213-D02 | Central | JCD0113 - ROUTES 87 - MONITEAU COUNTY | 3 of 5 | $1,715,742 | +17% |
| 15 NOV 2024 | 241115-B02 | Northeast | J2S3195, J2S3314 - ROUTE ZZ, K - MONTOGMERY, AUDRAIN COUNTIES | 2 of 8 | $2,084,614 | +1.0% |
| 15 NOV 2024 | 241115-D05 | Central | JCD0057, JCD0115-ROUTE U, 179-MONITEAU COUNTY | 3 of 5 | $1,434,657 | +31% |
| 16 AUG 2024 | 240816-D03 | Central | JCDM0060-ROUTE 17-MILLER COUNTY | 6 of 7 | $263,286 | +150% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.