MoDOT contract 250620-C01 bid tabulation
JKR0102 - ROUTE 50 - JOHNSON COUNTY. Let by Missouri DOT on June 20, 2025, Johnson, Kansas City. 5 bids received; low bid $1,235,355 by Louis-Company, LLC.
- Owner
- Missouri DOT
- Letting
- 20 JUN 2025
- Pay items
- 50
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Louis-Company, LLC | $1,235,355 | Low |
| 2 | E & C Bridge, LLC | $1,265,979 | +2.0% |
| 3 | Emery Sapp & Sons, Inc. | $1,387,330 | +12% |
| 4 | Don Schnieders Excavating Company, Inc. | $1,391,133 | +13% |
| 5 | Cale Seymour Construction, LLC | $1,553,731 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louis-Company, LLC | 2. E & C Bridge, LLC | 3. Emery Sapp & Sons, Inc. | 4. Don Schnieders Excavating Company, Inc. | 5. Cale Seymour Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $30,974 | $62,500 | $60,000 | $65,070 | $190,000 |
| 0030 | Class A excavation (2031000) | CY | 1,640 | $14.12 | $36.50 | $21.00 | $21.30 | $18.50 |
| 0040 | Embankment in place (2035500) | CY | 700 | $17.15 | $59.00 | $27.50 | $59.75 | $30.00 |
| 0050 | Compacting embankment (2036000) | CY | 940 | $10.50 | $11.00 | $9.25 | $19.15 | $6.00 |
| 0060 | Class 3 excavation (2063000) | CY | 39 | $10.81 | $95.00 | $85.00 | $141.00 | $35.00 |
| 0070 | Shaping slopes, class III (2153000) | 100F | 2 | $1,006.97 | $1,250.00 | $855.00 | $1,250.00 | $1,845.00 |
| 0080 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 2,988 | $12.15 | $12.00 | $14.50 | $8.85 | $8.12 |
| 0090 | Misc.optional pavement (4019905) | SY | 2,987.30 | $77.10 | $70.00 | $60.00 | $61.25 | $74.00 |
| 0100 | Asphaltic concrete mixture PG 70-22 (SP125C mix) (4030103) | TON | 39 | $818.16 | $575.00 | $690.00 | $650.00 | $780.00 |
| 0110 | Tack coat (4071005) | GAL | 35 | $3.78 | $3.50 | $12.00 | $3.00 | $36.00 |
| 0120 | Concrete approach pavement (5041000) | SY | 262.30 | $350.51 | $190.00 | $230.00 | $181.00 | $150.00 |
| 0130 | Rock lining (6097000) | CY | 4 | $462.51 | $135.00 | $200.00 | $75.00 | $125.00 |
| 0140 | Construction signs (6161005) | SF | 876 | $8.18 | $6.50 | $6.93 | $6.50 | $7.50 |
| 0150 | Advanced warning rail system (6161008) | EACH | 4 | $56.64 | $45.00 | $48.00 | $45.00 | $60.00 |
| 0160 | Channelizer (trim-line) (6161025) | EACH | 150 | $22.66 | $18.00 | $19.20 | $18.00 | $19.20 |
| 0170 | Type 3 moveable barricade (6161030) | EACH | 64 | $182.51 | $145.00 | $154.55 | $145.00 | $174.00 |
| 0180 | Direction indicator barricade (6161033) | EACH | 47 | $94.40 | $75.00 | $80.00 | $75.00 | $90.00 |
| 0190 | Flashing arrow panel (6161040) | EACH | 2 | $1,195.77 | $950.00 | $1,013.00 | $950.00 | $1,200.00 |
| 0200 | Sequential flashing warning light (6161055) | EACH | 30 | $81.82 | $65.00 | $69.30 | $65.00 | $120.00 |
| 0210 | Tubular marker (6161070) | EACH | 79 | $106.99 | $85.00 | $90.60 | $85.00 | $54.00 |
| 0220 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $2,706.21 | $2,150.00 | $2,292.00 | $2,150.00 | $2,580.00 |
| 0230 | Temporary long-term rumble strips (6162002) | EACH | 4 | $1,699.25 | $1,350.00 | $1,440.00 | $1,350.00 | $1,800.00 |
| 0240 | Mobilization (6181000) | LS | 1 | $65,000 | $97,000 | $138,000 | $143,250 | $190,000 |
| 0250 | Additional mobilization for seeding (6181020) | EACH | 1 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0260 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 1,725 | $0.44 | $0.35 | $0.38 | $0.35 | $1.50 |
| 0270 | 6 in. yellow high build waterborne pavement marking paint, type L beads (6205903A) | LF | 1,366 | $0.44 | $0.35 | $0.38 | $0.35 | $1.50 |
| 0280 | Pavement marking removal (6207001) | LF | 16,336 | $0.69 | $0.55 | $0.59 | $0.55 | $1.50 |
| 0290 | 4 in temporary pavement marking paint (6208076) | LF | 13,245 | $0.18 | $0.14 | $0.15 | $0.14 | $1.00 |
| 0300 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 350 | $35.24 | $30.00 | $24.00 | $28.00 | $33.60 |
| 0310 | Contractor furnished surveying and staking (6274000) | LS | 1 | $12,587 | $6,500.00 | $11,500 | $10,000 | $12,000 |
| 0320 | 12 in. pipe group A (7261012) | LF | 580 | $60.64 | $56.00 | $38.00 | $35.45 | $82.00 |
| 0330 | Seeding - cool season grasses (8051000A) | ACRE | 1.40 | $4,657.19 | $3,700.00 | $3,945.00 | $3,700.00 | $4,440.00 |
| 0340 | Sediment trap rock (8061004) | CY | 48 | $94.40 | $75.00 | $80.00 | $75.00 | $90.00 |
| 0350 | Rock ditch check (8061005) | LF | 178 | $17.62 | $14.00 | $15.00 | $14.00 | $16.80 |
| 0360 | Sediment removal (8061016) | CY | 17 | $74.39 | $10.00 | $20.50 | $20.00 | $45.00 |
| 0370 | Temporary seeding (8061017) | ACRE | 0.80 | $3,398.50 | $2,700.00 | $2,880.00 | $2,700.00 | $3,240.00 |
| 0380 | MGS guardrail (6061060) | LF | 338 | $33.98 | $30.00 | $29.00 | $30.00 | $45.50 |
| 0390 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $4,254.41 | $3,800.00 | $3,605.00 | $3,800.00 | $5,918.00 |
| 0400 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 2 | $3,839.04 | $3,500.00 | $3,255.00 | $3,500.00 | $5,000.00 |
| 0410 | Removal of existing bridge deck (2162500) | SF | 6,772 | $9.25 | $10.00 | $9.30 | $14.00 | $6.23 |
| 0420 | Misc.removal of existing bridge approach slab (2169904) | SF | 1,584 | $4.99 | $12.00 | $2.70 | $10.50 | $15.78 |
| 0430 | Bridge approach slab (major) (5031010A) | SY | 175 | $329.39 | $225.00 | $385.00 | $357.00 | $250.00 |
| 0440 | Slab on steel (7034212) | SY | 778 | $340.84 | $390.00 | $510.00 | $465.00 | $380.00 |
| 0450 | Type D barrier (7034219A) | LF | 427 | $146.05 | $105.00 | $154.00 | $135.00 | $200.00 |
| 0460 | Protective coating - concrete bents and piers (epoxy) (7110200) | LS | 1 | $15,104 | $12,000 | $12,800 | $12,000 | $18,000 |
| 0470 | Shear connectors (7121159) | EACH | 1,632 | $14.52 | $9.00 | $12.50 | $12.80 | $16.00 |
| 0480 | Slab drain (7123610) | EACH | 34 | $324.74 | $375.00 | $660.00 | $600.00 | $550.00 |
| 0490 | Non-destructive testing (7126000) | LF | 19 | $169.92 | $50.00 | $180.00 | $135.00 | $189.00 |
| 0500 | Open cell foam joint seal (7172054) | LF | 74 | $97.11 | $75.00 | $115.00 | $89.00 | $102.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of June 20, 2025. Compiled by Mirage Metrics.