Cale Seymour Construction, LLC: MoDOT bid record

Cale Seymour Construction, LLC submitted 17 bids on Missouri DOT contracts in the data, from 21 FEB 2020 to 20 JUN 2025, and was the low bidder on 6 of them (35%). When it was not low, its total sat a median +12% above the low bid.

Owner
Missouri DOT
Low bid volume
$5,175,904
Latest bid
20 JUN 2025
Data through
16 OCT 2026
17Bids
6Low bids
35Win rate, percent
+12%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
20205240%
2021100%
20224375%
2023200%
2024300%
20252150%
Cale Seymour Construction, LLC, MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Kansas City11436%
Southwest3133%
Northwest2150%
Central100%
Cale Seymour Construction, LLC, MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Additional mobilization for seeding6181020EACH1110 (91%)$600.00$600.00
Type 1 aggregate for base (4 in. thick)3040143SY86 (75%)$6.61$14.00
Silt fence8061019LF155 (33%)$3.36$3.45
Type III moveable barricade6161030EACH105 (50%)$132.50$156.69
Advanced warning rail system6161008EACH144 (29%)$60.00$51.40
Compacting embankment2036000CY124 (33%)$6.75$7.65
Slab drain7123610EACH104 (40%)$422.83$492.09
Vertical drain at end bents7151001EACH84 (50%)$1,683.16$2,600.00
Slab on concrete beam7034222SY64 (67%)$368.75$514.68
Gravel (A) or crushed stone (B)3105002TON54 (80%)$34.28$55.00
Type 5 aggregate for base (4 in. thick)3040504SY54 (80%)$8.00$14.30
Construction signs6161005SF163 (19%)$8.25$7.00
Cale Seymour Construction, LLC, MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Cale Seymour Construction, LLC, MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
20 JUN 2025250620-C01Kansas CityJKR0102 - ROUTE 50 - JOHNSON COUNTY5 of 5$1,553,731+26%
17 JAN 2025250117-A01NorthwestJ1S2414-ROUTE D-CALDWELL COUNTY1 of 1$1,987,080Low
13 DEC 2024241213-C02Kansas CityJ4S3453 - ROUTE D - CASS COUNTY2 of 4$855,459+4.0%
20 SEP 2024240920-A04NorthwestJNW0031 - ROUTE 190 - DAVIESS COUNTY5 of 5$1,926,148+12%
21 JUN 2024240621-C01Kansas CityJ3S3204 - ROUTE M - PETTIS COUNTY5 of 9$1,378,322+6.0%
15 DEC 2023231215-C02Kansas CityJ3S3156 - ROUTE 2 - JOHNSON COUNTY3 of 8$784,195+27%
17 MAR 2023230317-C06Kansas CityJ3S3173 - ROUTE WW - JOHNSON COUNTY2 of 8$1,145,400+7.0%
16 DEC 2022221216-C01Kansas CityJ3S3121 - ROUTE AA - LAFAYETTE COUNTY1 of 6$413,371Low, 12% under the second
17 JUN 2022220617-G01SouthwestJ7P3499 - Route 52 - Henry County2 of 3$1,676,484+19%
20 MAY 2022220520-C01Kansas CityJ3P3099 - VARIOUS ROUTES - VARIOUS COUNTIES1 of 1$1,890,373Low
15 APR 2022220415-C01Kansas CityJ3P3211 - ROUTE 50 - JOHNSON COUNTY1 of 7$544,665Low
16 APR 2021210416-C03Kansas CityJ4S3369 - Route 49 OR - Cass County2 of 6$935,976+10%
15 MAY 2020200515-G01SouthwestJ7P2228C, J7P3195 - ROUTE 160 - DADE COUNTY4 of 5$2,426,476+25%
17 APR 2020200417-D02CentralJ5S3248 - ROUTE EE - HOWARD COUNTIES4 of 6$527,606+17%
20 MAR 2020200320-C02Kansas CityJ3S3106, J7S3403 - ROUTES 765, B - PETTIS, BENTON COUNTIES1 of 3$140,724Low, 21% under the second
20 MAR 2020200320-G07SouthwestJ7S3251 - ROUTE K - HENRY COUNTY1 of 3$199,691Low, 34% under the second
21 FEB 2020200221-C02Kansas CityJ3S3115, J3S3116 - ROUTE D - PETTIS COUNTY2 of 2$1,694,254+2.0%
Cale Seymour Construction, LLC: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.